skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Morning Report for November 1, 2001

                       Headquarters Daily Report

                         NOVEMBER 01, 2001

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II           X                                      
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION II  NOV. 01, 2001

Licensee/Facility:                     Notification:

Tennessee Valley Authority             MR Number: 2-01-0019
Sequoyah 1 2                           Date: 11/01/01
Soddy-Daisy,Tennessee                                                     
Dockets: 50-327,50-328
PWR/W-4-LP,PWR/W-4-LP                 

Subject: UNPLANNED RADIOLOGICAL RELEASE                                  

Discussion:

At 6:40 a.m., on October 30, 2001, as water was being released from the  
turbine building sump to the yard drainage pond, the count rate as       
measured by the station sump discharge radiation monitor reached its     
alarm setpoint of 600 CPM.  An initial air radiation survey of the sump  
indicated that there was no abnormal activity.  A subsequent water sample
from the sump confirmed that there was activity in the turbine building  
sump. At 8:10 a.m., the release was terminated by re-aligning the sump   
discharge to the low volume waste treatment pond, which is isolated from 
the environment.                                                         
                                                                         
At 8:50 a.m., a Notification of Unusual Event (NOUE) was declared due to 
an unplanned radiological release which exceeded procedure-prescribed    
effluent radiation levels.  The NOUE was terminated at 9:10 a.m., and a  
10 CFR 50.72 notification was made at 9:30 a.m.  Liquid samples taken by 
the licensee at the discharge of the yard drainage pond to the dilution  
pond and at the discharge of the dilution pond to the Tennessee River    
detected no activity.                                                    
                                                                         
Subsequent analysis showed that the total activity in the turbine        
building sump was actually less than 35% of the Off-site Dose Calculation
Manual (ODCM) limit, indicating that the procedure-prescribed radiation  
limits for declaring an NOUE may have been conservative.  No release     
limits were exceeded and, therefore, the NOUE criteria of two times the  
ODCM limits did not exist.  On October 31, the licensee withdrew the     
10 CFR 50.72 notification. The licensee is continuing to investigate the 
source of the activity in the Turbine Building Sump.                     
                                                                         
The resident inspectors and a Region II radiation protection specialist  
continue to review the event and monitor the licensee's actions.         

Regional Action:

None.                                                                    

Contact:  Paul E. Fredrickson        (404)562-4530
_