Morning Report for March 28, 2001

                       Headquarters Daily Report

                         MARCH 28, 2001

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II           X                                      
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION II  MARCH 28, 2001

Licensee/Facility:                     Notification:

Virginia Power Co.                     MR Number: 2-01-0004
North Anna 1 2                         Date: 03/28/01
Richmond,Virginia                                                         
Dockets: 50-338,50-339
PWR/W-3-LP,PWR/W-3-LP                 

Subject: NORTH ANNA POWER STATION FUEL ASSEMBLY TOP NOZZLE SEPARATION    

Discussion:

On March 24, 2001, a top nozzle separated from a fuel assembly after     
having been lowered about six inches into its designated location in the 
spent fuel pool.  The overall length of the assembly is approximately    
twelve feet.  The assembly was being returned from a video inspection    
point inside the spent fuel pool when the failure occurred.  The assembly
fell approximately eleven and one half feet into its designated spent    
fuel rack location following the top nozzle separation from the assembly.
Attached to the separated top nozzle was a burnable poison rod assembly. 
The licensee found separation at the bulge joint where the top nozzle    
thimble sleeve connects to the guide thimble tube via rolled connections.
There are twenty four of these connections that support the weight of the
assembly during movement.  A root cause evaluation team has been convened
to determine the failure mechanism.  Fuel movement activities have been  
temporarily suspended by the licensee during the root cause              
investigation.                                                           
                                                                         
The failed assembly was of the Westinghouse LOPAR 17 x 17 fuel design. It
was one of the spent fuel assemblies being inspected for eventual        
movement to the licensee's dry cask storage area. This fuel assembly had 
been burned twice within the core and was placed in the spent fuel pool  
sometime in 1984.                                                        
                                                                         
Area radiation monitors remained normal during the incident. Area and    
airborne surveys by health physics personnel subsequent to the incident  
showed no increased radiation readings.  Follow up evaluations by the    
licensee revealed no evidence of damage to the fuel cladding, fuel rack  
or the spent fuel pool liner.                                            
                                                                         
Similar incidents have occurred at the La Hague plant (France) and the   
Almaraz plant (Spain). The root cause for both of these incidents was    
determined to be Intergranular Stress Corrosion Cracking (IGSCC).        

Regional Action:

Routine followup by the resident inspectors.                             

Contact:  J. BLAKE                   (404)562-4607