Morning Report for November 7, 2003
Headquarters Daily Report
REGION III
DUANE ARNOLD ENERGY CENTER MANUAL SHUTDOWN DUE TO HIGH REACTOR COOLANT CONDUCTIVITY
Licensee/Facility:
NUCLEAR MANAGEMENT CO., LLC
Duane Arnold
HUDSON, Wisconsin
Dockets: 05000331
[1] GE-4
License No:
|
Notification:
MR Number: 3-2003-0034
Date: 11/06/2003
Tel. Call with Res. Inspctrs
|
Discussion:
At 1:34 a.m. (CST) on November 7, 2003, the licensee inserted a manual reactor shutdown while at 45 percent power due to high reactor coolant conductivity. All systems responded as anticipated with the exception of the turbine generator which did not trip on reverse power as expected. Control room operators manually tripped the turbine generator. The turbine generator did not motor as a result of this event.
The licensee is investigating the cause of the high conductivity.
The residents inspectors are monitoring the activities.
Region III (Lisle, IL) was informed of this shutdown by the Senior Resident Inspector at 2:35a.m. (CST) on November 7, 2003.
Regional Action: Information Only
Accession Numbers:
Accession No |
Accession Date |
ML033110589 |
11/07/2003 |
Contacts:
Name |
Office Abbrev |
Phone No |
E-Mail |
BURGESS, B L |
R3 |
(630) 829-9629 |
BLB@nrc.gov |
|