skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Event Notification Report for June 24, 2003




                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           06/23/2003 - 06/24/2003

                              ** EVENT NUMBERS **

39949  39956  

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   39949       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  CALIFORNIA RADIATION CONTROL PRGM    |NOTIFICATION DATE: 06/19/2003|
|LICENSEE:  AGI GEOTECHNICAL                     |NOTIFICATION TIME: 14:30[EDT]|
|    CITY:  VAN NUYS                 REGION:  4  |EVENT DATE:        06/19/2003|
|  COUNTY:                            STATE:  CA |EVENT TIME:        07:30[PDT]|
|LICENSE#:                        AGREEMENT:  Y  |LAST UPDATE DATE:  06/19/2003|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |DALE POWERS          R4      |
|                                                |DOUG BROADDUS        NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  KATHLEEN KAUFMAN             |                             |
|  HQ OPS OFFICER:  HOWIE CROUCH                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| CALIFORNIA AGREEMENT STATE REPORT - STOLEN MOISTURE DENSITY GAUGE            |
|                                                                              |
| [DELETED] , Director LA County Radiological Health Management of the CA      |
| Radiological Health Branch and  [DELETED]  Senior Health Physicist           |
| [DELETED] ) called to report that a Moisture Density Gauge (50 milli-Curies  |
| Am-241 and 10 milli-Curies Cs-137) (Manufacture Campbell Pacific, Model MC1, |
| serial # 11114098)  was stolen from a truck at 7:30 AM PDT.  The truck was   |
| at  7-11 in Torrance, California and the driver was inside the 7-11.  The    |
| driver noticed the missing material after he drove away from the 7-11.  The  |
| licensee is AGI Geotechnical  [DELETED] ).  The Torrance Police Department   |
| was notified.                                                                |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39956       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: LASALLE                  REGION:  3  |NOTIFICATION DATE: 06/23/2003|
|    UNIT:  [1] [] []                 STATE:  IL |NOTIFICATION TIME: 15:44[EDT]|
|   RXTYPE: [1] GE-5,[2] GE-5                    |EVENT DATE:        06/23/2003|
+------------------------------------------------+EVENT TIME:        11:08[CDT]|
| NRC NOTIFIED BY:  RICHARD CALVIN               |LAST UPDATE DATE:  06/23/2003|
|  HQ OPS OFFICER:  ARLON COSTA                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |PATRICK LOUDEN       R3      |
|10 CFR SECTION:                                 |                             |
|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| LOSS OF EMERGENCY ASSESSMENT CAPABILITY AFFECTING PLANT ANNUNCIATORS         |
|                                                                              |
| "This report is being made pursuant to 10 CFR 50.72(b)(3)(xiii), Major loss  |
| of emergency assessment capability. Electrical Maintenance Department        |
| personnel were removing an Annunciator System power supply inverter as part  |
| of pre-planned maintenance. During the removal of the inverter, a short      |
| occurred which resulted in the loss of power to all of the Division II       |
| powered annunciators (about 50 % of all annunciators). The station entered   |
| the abnormal response procedure and took compensatory action for monitoring  |
| equipment and plant status. At present, troubleshooting activities are in    |
| progress to restore full annunciator capability."                            |
|                                                                              |
| All plant systems functioned as required and no other plant systems were     |
| affected by this incident.                                                   |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+