Protecting People and the EnvironmentUNITED STATES NUCLEAR REGULATORY COMMISSION
SSINS No.: 6835
IN 87-23
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C. 20555
May 27, 1987
Information Notice No. 87-23: LOSS OF DECAY HEAT REMOVAL DURING
LOW REACTOR COOLANT LEVEL OPERATION
Addressees:
All holders of an operating license or a construction permit for pressurized-
water reactor facilities.
Purpose:
This notice provides information regarding the loss of decay heat removal
capability at pressurized water reactors resulting from the loss of RHR pump
suction during plant operations with low reactor coolant levels. It is ex-
pected that recipients will review this information for applicability to their
reactor facilities and consider actions, if appropriate, to prevent similar
problems. Suggestions contained in this notice do not constitute NRC require-
ments; therefore, no specific action or written response is required.
Description of Circumstances:
On April 10, 1987 the Diablo Canyon Unit 2 reactor experienced a loss of decay
heat removal capability in both trains. The reactor coolant system had been
drained down to the mid-height of the hot-leg piping in preparation for the
removal of the steam generator manways. During the 85 minute period that the
heat-removal capability was lost, the reactor coolant heated from 87ø F to
boiling, steam was vented from an opening in the head, water was spilled from
the partially unsealed manways, and the airborne radioactivity levels in the
containment rose above the maximum permissible concentration of noble gases
allowed by 10 CFR 20. The reactor, which was undergoing its first refueling,
had been shut down for seven days at the time and the containment equipment
hatch had been opened.
Erroneous level instrumentation, inadequate knowledge of pump suction
head/flow requirements, incomplete assessment of the behavior of the air/water
mixture in the system and poor coordination between control room operations
and containment activities all contributed to the event. Under the conditions
that existed, the system that indicated the level of coolant in the reactor
vessel read "high" and responded poorly to changes in the coolant level. In
addition, the intended coolant level, established for this operation, was
later determined to be below the level at which air entrainment due to
vortexing was predicted to commence. At the time of the event, the plant
staff believed that the coolant level was six inches or more above the level
that would allow vortexing.
8705200749
. IN 87-23
May 27, 1987
Page 2 of 5
The event began at about 8:43 pm, when a test engineer in preparation for a
planned containment penetration local leak rate test, began draining a section
of the reactor coolant pump leakoff return line, which he believed to be
isolated. However, because of a leaking boundary valve, this action caused
the volume control tank fluid to be drained through the intended test section
to the reactor coolant drain tank. The control room operators, who were not
aware that the engineer had begun conducting the test procedure, increased
flow to stop the fluid reduction from the volume control tank. A few minutes
later the operators were informed that the reactor coolant drain tank level
was increasing but they could not determine the source of the leakage.
Although the actual level of coolant in the reactor vessel was apparently
dropping below the minimum intended level, the indication of level in the
vessel remained within the desired control band. At 9:25 p.m. the electrical
current of the active RHR pump (No. 2-2) was observed to be fluctuating. The
2-1 pump was started and the 2-2 pump was shut down. However, the current on
the 2-1 pump also fluctuated, so it was immediately shut down as well.
The operators did not immediately raise the water level in the reactor because
they still did not know either the source of the leakage, the true vessel
level, or the status of the work on the steam generator manways. Operators
were sent to vent the RHR pumps. One pump was reported to be vented at 10:03
p.m. At 10:21 p.m. an attempt was made to start this RHR pump, but the
current fluctuated and it was shut down again. During this period the
operators did not know the temperature of the coolant in the reactor vessel
because the core exit thermocouples had been disconnected in preparation for
the planned refueling. By 10:30 p.m. airborne activity levels in the
containment were increasing and personnel began to evacuate from the
containment building.
At 10:38 p.m. when the operators learned that the steam generator manways had
not been removed, action was initiated to raise the reactor vessel water level
by adding water from the refueling water storage tank. About 10 minutes later
the test engineer identified the source of the leakage and stopped it. By
10:51 p.m., the vessel level had been raised sufficiently to restart one of
the RHR pumps. The indicated RHR pump discharge temperature immediately rose
to 220ø F. At this time the reactor vessel was slightly above atmospheric
pressure and steam was venting from an opening in the reactor vessel head.
Discussion:
The NRC has documented numerous instances in the past where decay heat removal
systems have been disabled because pump suction was lost while the plant was
being operated at low reactor coolant water levels. Information Notice No.
86-101 describes four such events that occurred in 1985 and 1986. NRC Case
Study Report AEOD/C503 describes six such events that occurred in 1984, five
that occurred in 1983, and seven that occurred in 1982. Information Notice No.
81-09 described an event at Beaver Valley in March 1981. The case study report
further indicates that a total of 32 such events occurred from 1976 through
1984. The documentation includes descriptions of a total of 23 events that
have occurred since 1981 involving loss of decay heat removal capability
resulting from a loss of pump suction while operating at reduced water levels.
. IN 87-23
May 27, 1987
Page 3 of 5
For all but four of these 23 events the primary cause of the loss of pump
suction and loss of decay heat removal capability was attributed to incorrect,
inaccurate, or inadequate level indication. Two events were attributed to
loss of pump suction because of vortexing brought on by the simultaneous
operation of both pumps. In many of these events procedural errors were also
a contributing factor. In at least nine of the cases, the redundant pump was
lost because air was entrained when the operators, not understanding the cause
of the problem, switched to the second pump. There are repeated references to
difficulties in getting the pumps vented quickly after air binding had
occurred and to the operators' inability to take immediate action to raise
reactor vessel levels until the safety of personnel working on the primary
systems could be assured. The length of time that decay heat removal was
completely lost varied from eight minutes to two hours and averaged almost an
hour. In at least three previous cases, boiling is known to have occurred.
A number of actions have been recommended previously to prevent the loss of
RHR pump suction during low vessel level operations. These include:
Providing accurate level instrumentation designed for reduced vessel
water level operations.
Providing alarms in the control room for low decay heat removal flow and
low water level.
Including in the procedures specific requirements for frequent monitoring
and strict limits on level.
Considering in the procedures the possibility of vortex formation and air
entrainment, including a precaution against starting a second RHR pump
until the cause of the loss of the first pump is determined and
corrective actions have been taken.
Training the operators on the correlation between water level and pump
speed at the onset of vortexing and air entrainment.
Careful planning, coordination, and communication with control room
personnel regarding all ongoing activities which could affect the primary
system inventory.
The NRC review of the Diablo Canyon event indicated that vortexing and air
entrainment may occur at higher water levels than anticipated. In addition,
operation at mid-hot-leg levels can lead to unanticipated conditions which may
not have been adequately considered in instrumentation design and procedure
preparation.
The NRC staff's initial assessment of this event has identified the potential
for a significant loss of decay heat removal capability both from a total loss
of the RHR system and from a loss of the steam generator heat sink due to air
blanketing of the steam generator tubes. Correct operator actions then become
critical for plant recovery.
. IN 87-23
May 27, 1987
Page 4 of 5
NRC communications in the past have expressed serious concern with failures to
maintain adequate decay heat removal capability. Information Notice No. 81-09
pointed out that loss of shutdown cooling capability had been found to be a
potentially significant contributor to the total risk. AEOD/C503 and other
sources indicate that the time available to restore shutdown cooling before
core uncovery can occur is not necessarily large. At four days after shutdown
from long-term power operation, with the vessel drained down to the RHR
suction loss level, the vessel water can heat to the boiling point in about
1/2 hour. Under such conditions boiloff to the core uncovery level can occur
in less than two hours.
Following the loss of decay heat removal capability on April 10, 1987 at
Diablo Canyon, PG&E took a number of actions to prevent loss of RHR suction
during low level operation and to improve recovery should such a loss occur.
These actions included the following:
Evaluation of the reactor vessel level indicating system to determine the
level at which vortexing would occur and the effect of vortexing on the
level measurement.
Enhancements of the instrumentation to include accurate level
measurement, alarm capability and core exit temperature measurement
during low level operation.
Enhancement of procedures to include requirements for verifying proper
RHR pump suction before starting the second RHR pump. Also included are
precautions specifying minimum vessel levels as a function of RHR flow.
Improvements in work planning, control and communication to include a
restriction of the work scope to items that do not have the potential to
reduce RCS inventory.
Improvement of operator training including a discussion of the potential
causes of RHR flow loss, as well as recovery procedures.
The NRC is currently considering additional generic action on this issue.
. IN 87-23
May 27, 1987
Page 5 of 5
This information notice requires no specific action or written response.
If you have any questions about this matter, please contact the Regional
Administrator of the appropriate regional office or this office.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contacts: Donald C Kirkpatrick, NRR
(301) 492-8166
Warren C. Lyon, NRR
(301) 492-7605
Attachment:
1. List of Recently Issued NRC Information Notices