Document
Number |
Date |
Description |
|
9/02/2008 |
Summary of Fitness-For-Duty Program Performance Reports for Calendar Year 2007 |
|
8/12/2008 |
Emergency Response Data System Test Schedule Revised |
|
7/29/2008 |
Criticality Safety-related Events Resulting from Fissile Material Operations under Procedures Not Reviewed by Criticality Safety Staff |
|
7/30/2008 |
Main Feedwater System Issues and Related 2007 Reactor Trip Data |
|
7/7/2008 |
Braidwood Unit 1 Reactor Trip Due to Off-Site Power Fluctuation |
|
6/18/2008 |
Service Water System Degradation at Brunswick Steam Electric Plant Unit 1 |
|
5/1/2008 |
Response to Indications of Potential Tampering, Vandalism, or Malicious Mischief |
|
5/22/2008 |
Turbine-driven Auxiliary Feedwater Pump Bearing Issues |
|
4/16/2008 |
Maintenance Procedures Compromise Double-Contingency of UO2 Powder-Handling Equipment at Fuel Cycle Facility |
|
4/24/2008 |
Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes |
|
4/10/2008 |
Instrument Air System Failure Resulting In Manual Reactor Trip |
|
4/10/2008 |
Fires Involving Emergency Diesel Generator Exhaust Manifolds |
|
4/7/2008 |
Counterfeit Parts Supplied to Nuclear Power Plants |
|
5/16/2008 |
Precautions to take before Sharing Sensitive Security-Related Information |
|
03/19/08 |
Findings Identified During Component Design Bases Inspections |
|
01/03/08 |
Designation and Protection Of Safeguards Information |