skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Information Notices
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
1979

Information Notices - 1996

File Name Date Description
in96048s1 07/24/1998 Motor-Operated Valve Performance Issues
in96044s1 07/02/1997 Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
in96053s1 06/23/1997 Retrofit to Amersham 660 Posilock Radiography Camera to Correct Inconsistency in 10 CFR Part 34 Compatibility
in96071 12/27/1996 Licensee Response to Indications of Tampering, Vandalism, or Malicious Mischief
in96072 12/24/1996 Undetected Failures That May Occur During Patient Treatments with Teletherapy Devices
in96070 12/24/1996 Year 2000 Effect on Computer System Software
in96069 12/20/1996 Operator Actions Affecting Reactivity
in96068 12/19/1996 Incorrect Effective Diaphragm Area Values in Vendor Manual Result in Potential Failure of Pneumatic Diapragm Actuators
in96067 12/19/1996 Vulnerability of Emergency Diesel Generators to Fuel Oil/Lube Oil Incompatibility
in96066 12/13/1996 Recent Misadministrations Caused by Incorrect Calibrations of Strontium-90 Eye Applicators
in96065 12/11/1996 Undetected Accumulations of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown (with figure)
in96064 12/10/1996 Modifications to Containment Blowout Panels Without Appropriate Design Controls
in96063 12/05/1996 Potential Safety Issue Regarding the Shipment of Fissile Material
in96062 11/20/1996 Potential Failure of the Instantaneous Trip Function of General Electric RMS-9 Programmers
in96061 11/20/1996 Failure of a Main Steam Safety Valve to Reseat Caused by an Improperly Installed Release Nut (with figure)
in96060 11/14/1996 Potential Common-Mode Post-Accident Failure of Residual Heat Removal Heat Exchangers
in96059 10/30/1996 Potential Degradation of Post Loss-of-Coolant Re- Circulation Capability as a Result of Debris
in96058 10/30/1996 RCP Seal Replacement with Pump on Backseat
in96057 10/30/1996 Incident-reporting Requirements Involving Intakes During a 24-hour Period That May Cause a Total Effective Dose Equivalent in Excess of 0.05 SV (5 rems)
in96056 10/22/1996 Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power
in96055 10/22/1996 Inadequate Net Positive Suction Head of Emergency Core Cooling and Containment Heat Removal Pumps under Design Basis Accident Conditions
in96054 10/17/1996 Vulnerability of Stainless Steel to Corrosion When Sensitized
in96053 10/15/1996 Retrofit to Amersham 660 Posilock Radiography Camera to Correct Inconsistency in 10 CFR Part 34 Compatibility
in96040s1 10/07/1996 Deficiencies in Material Dedication and Procurement Practices and in Audits of Vendors
in96052 09/26/1996 Cracked Insertion Rods on Troxler Model 3400 Series Portable Moisture Density Guages
in96051 09/11/1996 Residual Contamination Remaining in Krypton-85 Handling System after Venting
in96050 09/04/1996 Problems with Levering-in Devices in Westinghouse Circuit Breakers (with figures)
in96048 08/21/1996 Motor-Operated Valve Performance Issues
in96049 08/20/1996 Thermally Induced Pressurization of Nuclear Power Facility Piping
in96047 08/19/1996 Recordkeeping, Decommissioning Notifications for Disposals of Radioactive Waste by Land Burial Authorized under Former 10 CFR 20.304, 20.302, and Current 20.2002
in96046 08/12/1996 Zinc Plating of Hardened Metal Parts and Removal of Protective Coatings in Refurbished Circuit Breakers
in96045 08/12/1996 Potential Common-Mode Post-Accident Failure of Containment Coolers
in96044 08/05/1996 Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
in96042 08/05/1996 Unexpected Opening of Multiple Safety Relief Valves
in96043 08/02/1996 Failures of General Electric Magne-Blast Circuit Breakers
in96041 07/26/1996 Effects of a Decrease in Feedwater Temperature on Nuclear Instrumentation
in96040 07/25/1996 Deficiencies in Material Dedication and Procurement Practices and in Audits of Vendors
in96009s1 07/10/1996 Damage in Foreign Steam Generator Internals
in96039 07/05/1996 Estimates of Decay Heat Using Ans 5.1 Decay Heat Standard May Vary Significantly
in96038 06/21/1996 Results of Steam Generator Tube Examinations
in96037 06/18/1996 Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown
in96036 06/12/1996 Degradation of Cooling Water Systems Due to Icing
in96035 06/11/1996 Failure of Safety Systems on Self-Shielded Irradiators Because of Inadequate Maintenance and Training
in96032 06/05/1996 Implementation of 10 CFR 50.55a(g)(6)(Ii)(A), "Augmented Examination of Reactor Vessel"
in96034 05/31/1996 Hydrogen Gas Ignition During Closure Welding of a VSC-24 Multi-Assembly Sealed Basket
in96033 05/24/1996 Erroneous Data from Defective Thermocouple Results in a Fire
in96031 05/22/1996 Cross-Tied Safety Injection Accumulators
in96030 05/21/1996 Inaccuracy of Diagnostic Equipment for Motor-Operated Butterfly Valves
in96029 05/20/1996 Requirements in 10 CFR Part 21 for Reporting and Evaluating Software Errors
in96028 05/01/1996 Suggested Guidance Relating to Development and Implementation of Corrective Action
in96027 05/01/1996 Potential Clogging of High Pressure Safety Injection Throttle Valves During Recirculation
in96026 04/30/1996 Recent Problems with Overhead Cranes
in96025 04/30/1996 Traversing In-Core Probe Overwithdrawn at Lasalle County Station, Unit 1
in96024 04/25/1996 Preconditioning of Molded-Case Circuit Breakers Before Surveillance Testing
in96023 04/22/1996 Fires in Emergency Diesel Generators Exciters During Operation Following Undetected Fuse Blowing
in96022 04/11/1996 Improper Equipment Settings Due to the Use of Nontemperature-Compensated Test Equipment
in96021 04/10/1996 Safety Concerns Related to the Design of the Door Interlock Circuit on Nucletron High-Dose Rate and Pulsed Dose Rate Remote Afterloading Brachytherapy Devices
in96020 04/04/1996 Demonstration of Associated Equipment Operability
in96019 04/02/1996 Failure of Tone Alert Radios to Activate When Receiving a Shortened Activation Signal
in96018 03/25/1996 Compliance with 10 CFR Part 20 for Airborne Thorium
in96017PDF ICON 03/18/1996 Reactor Operation Inconsistent with the Updated Final Safety Analysis Report
in96016 03/14/1996 Bwr Operation with Indicated Flow less than Natural Circulation
in96015 03/08/1996 Unexpected Plant Performance During Performance of New Surveillance Tests
in96014 03/01/1996 Degradation of Radwaste Facility Equipment at Millstone Nuclear Power Station, Unit 1
in96013 02/26/1996 Potential Containment Leak Paths Through Hydrogen Analyzers
in96012 02/15/1996 Control Rod Insertion Problems
in96011 02/14/1996 Ingress of Demineralizer Resins Increases Potential for Stress Corrosion Cracking of Control Rod Drive Mechanism Penetrations
in96010 02/13/1996 Potential Blockage by Debris of Safety System Piping Which Is Not Used During Normal Operation or Tested During Surveillances
in96009 02/12/1996 Damage in Foreign Steam Generator Internals
in96008 02/05/1996 Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve
in96007 01/26/1996 Slow Five Percent Scram Insertion Times Caused by Viton Diaphragms in Scram Solenoid Pilot Valves
in96006 01/25/1996 Design and Testing Deficiencies of Tornado Dampers at Nuclear Power Plants
in96005 01/18/1996 Partial Bypass of Shutdown Cooling Flow from the Reactor Vessel
in96004 01/10/1996 Incident Reporting Requirements for Radiography Licensees
in96003 01/05/1996 Main Steam Safety Valve Setpoint Variation as a Result of Thermal Effects
in96002 01/05/1996 Inoperability of Power-Operated Relief Valves Masked by Downstream Indications
in96001 01/03/1996 Potential for High Post-Accident Closed-cycle


Privacy Policy | Site Disclaimer
Monday, February 19, 2007