File Name |
Date |
Description |
in95049s1 |
12/10/1997 |
Seismic Adequacy of Thermo-Lag Panels |
in95052s1 |
03/17/1998 |
NRC Information Notice 95-52, Supplement 1: Fire Endurance Test
Results for Electrical Raceway Fire Barrier Systems Constructed from
3M Company Interam Fire Barrier Materials |
in95036s1 |
06/10/1997 |
Potential Problem in Post-Fire Emergency Lighting |
in95058 |
12/18/1995 |
10 CFR 34.20; Final Effective Date |
in95057 |
12/13/1995 |
Risk Impact Study Regarding Maintenance During Low-Power Operation
and Shutdown |
in95056 |
12/11/1995 |
Shielding Deficiency in Spent Fuel Transfer Canal at a Boiling-water
Reactor |
in95055 |
12/06/1995 |
Handling Uncontained Yellowcake Outside of a Facility Processing
Circuit |
in95054 |
12/01/1995 |
Decay Heat Management Practices During Refueling Outages |
in95053 |
12/01/1995 |
Failures of Main Steam Isolation Valves as a Result of Sticking
Solenoid Pilot Valves |
in95047r1 |
11/30/1995 |
Unexpected Opening of a Safety/Relief Valve and Complications Involving
Suppression Pool Cooling Strainer Blockage |
in95013s1 |
11/22/1995 |
Potential for Data Collection Equipment to Affect Protection System
Performance |
in95052 |
11/14/1995 |
Fire Endurance Test Results for Electrical Raceway Fire Barrier
Systems Constructed From 3M Company Interam Fire Barrier Materials |
in95050 |
10/30/1995 |
Safety Defect in Gammamed 12I Bronchial Catheter Clamping Adapters |
in95051 |
10/27/1995 |
Recent Incidents Involving Potential Loss of Control of Licensed
Material |
in95049 |
10/27/1995 |
Seismic Adequacy of Thermo-Lag Panels |
in95048 |
10/10/1995 |
Results of Shift Staffing Study |
in95046 |
10/06/1995 |
Unplanned, Undetected Release of Radioactivity from the Exhaust
Ventilation System of a Boiling Water Reactor |
in95045 |
10/04/1995 |
American Power Service Falsification of American Society of Nondestructive
Testing (ASNT) Certificates |
in95047 |
10/04/1995 |
Unexpected Opening of a Safety/Relief Valve and Complications Involving
Suppression Pool Cooling Strainer Blockage |
in95043 |
09/28/1995 |
Failure of the Bolt-Locking Device on Reactor Coolant Pump Turning
Vane |
in95044 |
09/26/1995 |
Ensuring Compatible Use of Drive Cables Incorporating Use of Industrial
Nuclear Company Ball-Type Male Connectors |
in95041 |
09/22/1995 |
Degradation of Ventilation System Charcoal Resulting from Chemical
Cleaning of Steam Generators |
in95042 |
09/22/1995 |
Commission Decision on the Resolution of Generic Issue 23, "Reactor
Coolant Pump Seal Failure" |
in95040 |
09/20/1995 |
Supplemental Information to Generic Letter 95-03, "Circumferential
Cracking of Steam Generator Tubes" |
in95039 |
09/19/1995 |
Brachytherapy Incidents Involving Treatment Planning Errors |
in95038 |
09/08/1995 |
Degradation of Boraflex Neutron Absorber in Spent Fuel Pool Storage
Racks |
in95037 |
09/07/1995 |
Inadequate Offsite Power Systems Voltages During Design-Basis Events |
in95036 |
08/29/1995 |
Potential Problems with Post-Fire Emergency Lighting |
in95035 |
08/28/1995 |
Degraded Ability of Steam Generators to Remove Decay Heat by Natural
Circulation |
in95034 |
08/25/1995 |
Air Actuator and Supply Air Regulator Problems in Copes-Vulcan Pressurizer
Power-Operated Relief Valves |
in95033 |
08/23/1995 |
Switchgear Fire and Partial Loss of Offsite Power at Waterford Generating
Station, Unit 3 |
in95010s2 |
08/11/1995 |
Sup 2 for IN 95-10, Potential for Loss of Automatic Engineered Safety
Features Actuation |
in95032 |
08/10/1995 |
Thermo-Lag 330-1 Flame Spread Test Results |
in95031 |
08/09/1995 |
Motor-Operated Valve Failure Caused by Stem Protector Pipe Interference
|
in95030 |
08/03/1995 |
Susceptibility of Low-Pressure Coolant Injection and Core Spray
Injection Valves to Pressure Locking |
in95003s2 |
07/03/2000 |
Loss of Reactor Coolant Inventory and Potential Loss of Emergency
Mitigation Functions While in a Shutdown Condition |
in95029 |
06/07/1995 |
Oversight of Design and Fabrication Activities for Metal Components
Used in Spent Fuel Dry Storage Systems |
in95028 |
06/05/1995 |
Emplacement of Support Pads for Spent Fuel Dry Storage Installations
at Reactor Sites |
in95027 |
05/31/1995 |
NRC Review of Nuclear Energy Institute, "Thermo- Lag Combustibility
Evaluation Methodology Plant Screening Guide |
in95026 |
05/31/1995 |
Valve Failure During Patient Treatment with Gamma Stereotactic Radiosurgery
Unit |
in95025 |
05/11/1995 |
Valve Failure During Patient Treatment with Gamma Stereotactic Radiosurgery
Unit |
in95024 |
04/25/1995 |
Summary of Licensed Operator Requalification Inspection Program
Findings |
in95023 |
04/24/1995 |
Control Room Staffing Below Minimum Regulatory Requirements |
in95022 |
04/21/1995 |
Hardened or Contaminated Lubricants Cause Metal- Clad Circuit Breaker
Failures |
in95021 |
04/20/1995 |
Unexpected Degradation of Lead Storage Batteries |
in95003s1 |
03/25/1996 |
Loss of Reactor Coolant Inventory and Potential Loss of Emergency
Mitigation Functions While in a Shutdown Condition |
in95018s1 |
03/31/1995 |
Sup 1 to IN 95-18, Potential Pressure-locking of Safety-Related
Power-Operated Gate Valves |
in95020 |
03/22/1995 |
Failures in Rosemount Pressure Transmitters Due to Hydrogen Permeation
into the Sensor Cell |
in95019 |
03/22/1995 |
Failure of Reactor Trip Breaker to Open Because of Cutoff Switch
Material Lodged in the Trip Latch Mechanism |
in95018 |
03/15/1995 |
Potential Pressure-Locking of Safety-Related Power-Operated Gate
Valves |
in95017 |
03/10/1995 |
Reactor Vessel Top Guide And Core Plate Cracking |
in95016 |
03/09/1995 |
Vibration Caused by Increased Flow in a Boiling Water Reactor |
in95015 |
03/07/1995 |
Inadequate Logic Testing of Safety-Related Circuits |
in95014 |
02/28/1995 |
Susceptibility of Containment Sump Recirculation Gate Valves to
Pressure Locking |
in95013 |
02/24/1995 |
Potential For Data Collection Equipment to Affect Protection System
Performance |
in95011 |
02/24/1995 |
Failure of Condensate Piping Because of Erosion/ Corrosion at Flow-Straightening
Device |
in95012 |
02/21/1995 |
Potentially Nonconforming Fasteners Supplied by A&G; Engineering
II, Inc. |
in95010s1 |
02/10/1995 |
Potential for Loss of Automatic Engineered Safety Features Actuation |
in95010 |
02/03/1995 |
Potential For Loss of Automatic Engineered Safety Features Actuation |
in95009 |
01/31/1995 |
Use of Inappropriate Guidelines And Criteria For Nuclear Piping
And Pipe Support Evaluation And Design |
in95008 |
01/30/1995 |
Inaccurate Data Obtained With Clamp-On Ultrasonic Flow Measurement
Instruments |
in95007 |
01/27/1995 |
Radiopharmaceutical Vial Breakage During Preparation |
in95006 |
01/25/1995 |
Potential Blockage of Safety-Related Strainers by Material Brought
Inside Containment |
in95005 |
01/20/1995 |
Undervoltage Protection Relay Settings Out of Tolerance Due to Test
Equipment Harmonics |
in95004s1 |
10/11/1996 |
Excessive Cooldown and Depressurization of the Reactor Coolant System
Following a Loss of Offsite Power |
in95004 |
01/19/1995 |
Excessive Cooldown and Depressurization of the Reactor Coolant System
Following a Loss of Offsite Power |
in95003 |
01/18/1995 |
Loss of Reactor Coolant Inventory And Potential Loss of Emergency
Mitigation Functions While in a Shutdown Condition |
in95002 |
01/17/1995 |
Problems With General Electric CR2940 Contact Blocks in Medium-Voltage
Circuit Breakers |
in95001 |
01/04/1995 |
DOT Safety Advisory: High Pressure Aluminum |