Infrastructure Division (SC-31.2)

SC Space Management

Beginning in FY 2003, DOE is required to balance new construction against elimination of excess space. According the SC implementation guidance, all new construction projects which—

  • provide new space
  • are SC-funded (includes line-itmes, GPP and IGPP)
  • begin construction in FY 2003 or later,

must have an equivalent amount of excess space allocated from the SC Space Bank.

Space withdrawal requests are to be made to the SC Deputy Director for Field Operations, SC-3 (who is the designated SC Space Manager), through SC-31.2. For line items, the requests should be submitted by Critical Decision (CD)-0. For planned GPP and IGPP construction projects no submission is necessary. However, sufficient offsetting space should be available at the beginning of each fiscal year.

Office of Science Space Bank



Space Banking Contact List

SC Lab Contact Telephone No.
Ames Cynthia Baebler 630-252-1563
ANL Dale Dietzel 630-252-2555
BNL Gail Penny 631-344-4363
Fermi Stephen Webster 630-840-2130
LBNL Warren Yip 510-486-4297
ORNL/ORISE Mac Roddye 865-576-7705
PNNL Joe Escamillo 509-372-4014
PPPL Anthony Indelicato 609-243-3713
SLAC John Saidi 650-926-4552
TJNAF Richard Korynta 757-269-7145
Documents

SC Guidance for Implementation of Congressional Requirement for Offsetting New Construction Projects with Elimination of Excess Space
(Word, 38 KB)

Elimination of SC Excess Space by Year (Excel, 48 KB)

Waiver of Requirements for Eliminating Excess Facilities at TJNAF (PDF, 119 KB)

DOE Guidance on Excess Facilities and Space Banking from the FIMS Website