skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Nine Mile Point 2

2Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned scrams 0 0 0 0 0 0 0 0
Critical hours 2208.0 2209.0 2022.0 2184.0 2208.0 1933.1 1944.7 1817.4
                 
Indicator value 0.9 0.9 0 0 0 0 0 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned power changes 0 0 1.0 0 0 0 0 1.0
Critical hours 2208.0 2209.0 2022.0 2184.0 2208.0 1933.1 1944.7 1817.4
                 
Indicator value 0 0 0.8 0.8 0.8 0.8 0 0.9

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Scrams with complications   0 0 0 0 0 0 0
                 
                 
Indicator value         0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (BWR) 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.20E-07 -5.60E-08 -5.80E-08 -7.00E-08 -6.80E-08 -9.80E-08 -9.40E-08 -9.80E-08
URI (ΔCDF) -1.20E-06 -6.40E-07 -6.20E-07 -5.70E-07 -5.70E-07 -5.80E-07 -6.10E-07 -6.80E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.32E-06 -6.96E-07 -6.78E-07 -6.40E-07 -6.38E-07 -6.78E-07 -7.04E-07 -7.78E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.20E-07 -7.90E-08 -4.60E-08 -5.70E-08 -5.50E-08 -7.70E-08 -7.70E-08 -8.10E-08
URI (ΔCDF) -2.50E-07 -2.00E-07 -1.90E-07 -1.80E-07 -1.80E-07 -1.80E-07 -1.90E-07 -1.90E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.70E-07 -2.79E-07 -2.36E-07 -2.37E-07 -2.35E-07 -2.57E-07 -2.67E-07 -2.71E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -9.50E-08 -6.80E-08 -4.00E-08 -5.80E-08 -5.80E-08 -5.70E-08 -5.00E-08 -5.00E-08
URI (ΔCDF) -2.20E-07 -1.20E-07 -1.20E-07 -1.10E-07 -1.10E-07 -1.10E-07 -1.20E-07 -1.40E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.15E-07 -1.88E-07 -1.60E-07 -1.68E-07 -1.68E-07 -1.67E-07 -1.70E-07 -1.90E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.60E-07 -1.50E-07 -1.50E-07 -1.50E-07 -1.50E-07 -5.70E-08 -5.00E-08 -1.40E-08
URI (ΔCDF) 3.70E-07 3.20E-07 3.20E-07 4.00E-07 4.10E-07 3.70E-07 3.50E-07 3.00E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 2.10E-07 1.70E-07 1.70E-07 2.50E-07 2.60E-07 3.13E-07 3.00E-07 2.86E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 2.10E-07 2.80E-07 2.70E-07 2.40E-07 2.40E-07 6.20E-07 9.40E-07 9.50E-07
URI (ΔCDF) -1.00E-07 -1.20E-07 -1.20E-07 -1.10E-07 -1.10E-07 -1.10E-07 -1.10E-07 -1.20E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.10E-07 1.60E-07 1.50E-07 1.30E-07 1.30E-07 5.10E-07 8.30E-07 8.30E-07

Licensee Comments:

1Q/07: Change reflects a correction to add 118.05 hours of planned unavailability to Cooling Water system Pump Train C for the month of February 2007. This correction did not affect the color of the indicator.






Link to Notes

Reactor Coolant System Activity 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum activity 0.000007 0.000003 0.000006 0.000004 0.000006 0.000004 0.000003 0.000005 0.000004 0.000004 0.000005 0.000005
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0
Reactor Coolant System Activity 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum activity 0.000007 0.000151 0.000206 0.000572 0.000370 0.000462 0.000387 0.000406 0.000336 0.000282 0.000221 0.000261
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0.1 0.1 0.3 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum leakage 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Reactor Coolant System Leakage 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum leakage 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful opportunities 129.0 109.0 41.0 27.0 35.0 318.0 31.0 38.0
Total opportunities 138.0 113.0 43.0 30.0 39.0 318.0 34.0 40.0
                 
Indicator value 94.6% 95.1% 95.1% 95.0% 94.4% 96.8% 96.6% 96.4%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Participating Key personnel 93.0 84.0 97.0 97.0 94.0 93.0 90.0 91.0
Total Key personnel 94.0 89.0 97.0 97.0 95.0 93.0 90.0 91.0
                 
Indicator value 98.9% 94.4% 100.0% 100.0% 98.9% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful siren-tests 294 295 296 221 296 257 296 222
Total sirens-tests 296 296 296 222 296 259 296 222
                 
Indicator value 99.7% 99.6% 99.6% 99.6% 99.8% 99.7% 99.7% 99.8%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Physical Protection information not publicly available.



 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: August 4, 2008