skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Dresden 2

2Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned scrams 1.0 0 0 1.0 0 0 0 0
Critical hours 2168.9 2003.2 2159.0 2117.1 2208.0 1723.9 2183.0 2184.0
                 
Indicator value 0.8 0.8 0.8 1.7 0.8 0.9 0.9 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned power changes 0 0 0 0 0 1.0 0 0
Critical hours 2168.9 2003.2 2159.0 2117.1 2208.0 1723.9 2183.0 2184.0
                 
Indicator value 2.5 1.6 0.8 0 0 0.9 0.9 0.8

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Scrams with complications   0 0 1.0 0 0 0 0
                 
                 
Indicator value         1.0 1.0 1.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (BWR) 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Safety System Functional Failures 0 0 1 0 1 0 0 2
                 
Indicator value 2 2 3 1 2 2 1 3

Licensee Comments:

2Q/08: See LER 237/2008-002-00, "Unit 2 High Pressure Coolant Injection System Declared Inoperable," for SSFF reported on 6/16/2008. See LER 237/2008-003-00, "Control Room Emergency Ventilation Air Conditioning System Inoperable Due To Excessive Vibration," for SSFF reported on 6/23/2008.






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -4.60E-09 -4.60E-09 -2.10E-09 2.50E-09 2.20E-09 6.00E-09 7.20E-10 5.90E-10
URI (ΔCDF) -3.50E-08 -3.40E-08 -3.60E-08 -3.70E-08 -3.70E-08 -3.70E-08 -3.50E-08 -3.30E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.96E-08 -3.86E-08 -3.81E-08 -3.45E-08 -3.48E-08 -3.10E-08 -3.43E-08 -3.24E-08

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -5.20E-08 -5.20E-08 -5.20E-08 -5.20E-08 -5.20E-08 -5.20E-08 -5.20E-08 -4.00E-08
URI (ΔCDF) -7.20E-08 -7.20E-08 -7.20E-08 -7.40E-08 -7.40E-08 -7.40E-08 -7.40E-08 2.20E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.24E-07 -1.24E-07 -1.24E-07 -1.26E-07 -1.26E-07 -1.26E-07 -1.26E-07 1.80E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.40E-09 -1.50E-09 -1.50E-09 -4.30E-09 -4.30E-09 -4.30E-09 -4.30E-09 -4.30E-09
URI (ΔCDF) 3.90E-09 3.90E-09 3.90E-09 -8.80E-11 -8.80E-11 -8.80E-11 -8.80E-11 -8.80E-11
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 2.50E-09 2.40E-09 2.40E-09 -4.39E-09 -4.39E-09 -4.39E-09 -4.39E-09 -4.39E-09

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -9.80E-10 -1.30E-09 3.50E-10 4.10E-10 2.50E-10 1.30E-10 -8.80E-10 -7.50E-10
URI (ΔCDF) -1.70E-09 -1.60E-09 -1.70E-09 -1.70E-09 -1.70E-09 -1.70E-09 -1.70E-09 -1.80E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.68E-09 -2.90E-09 -1.35E-09 -1.29E-09 -1.45E-09 -1.57E-09 -2.58E-09 -2.55E-09

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 4.70E-10 2.90E-10 1.20E-09 1.40E-09 1.30E-09 2.00E-09 1.60E-09 1.60E-09
URI (ΔCDF) -2.40E-11 -2.20E-11 -2.30E-11 -2.30E-11 -2.30E-11 -2.20E-11 -2.20E-11 -2.40E-11
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 4.46E-10 2.68E-10 1.18E-09 1.38E-09 1.28E-09 1.98E-09 1.58E-09 1.58E-09

Licensee Comments: none






Link to Notes

Reactor Coolant System Activity 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum activity 0.000004 0.000003 0.000003 0.000003 0.000004 0.000004 0.000003 0.000003 0.000003 0.000003 0.000007 0.000009
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0
Reactor Coolant System Activity 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum activity 0.000004 0.000003 0.000005 0.000005 0.000008 0.000006 0.000006 0.000025 0.000003 0.000003 0.000003 0.000002
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum leakage 2.900 1.867 1.832 1.832 1.965 1.813 1.877 1.818 1.810 1.817 1.813 1.792
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 11.6 7.5 7.3 7.3 7.9 7.3 7.5 7.3 7.2 7.3 7.3 7.2
Reactor Coolant System Leakage 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum leakage 1.805 1.785 1.773 1.785 1.983 2.042 1.967 1.983 1.995 1.995 2.030 2.080
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 7.2 7.1 7.1 7.1 7.9 8.2 7.9 7.9 8.0 8.0 8.1 8.3

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful opportunities 14.0 12.0 50.0 54.0 40.0 2.0 24.0 16.0
Total opportunities 19.0 12.0 52.0 54.0 40.0 2.0 24.0 16.0
                 
Indicator value 96.3% 96.4% 95.9% 97.0% 97.4% 97.4% 97.1% 96.8%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Participating Key personnel 65.0 66.0 63.0 65.0 63.0 60.0 62.0 67.0
Total Key personnel 65.0 66.0 63.0 65.0 63.0 62.0 63.0 68.0
                 
Indicator value 100.0% 100.0% 100.0% 100.0% 100.0% 96.8% 98.4% 98.5%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful siren-tests 4971 4902 4985 4977 4961 4982 4970 4972
Total sirens-tests 4992 4914 4992 4990 4992 4992 4992 4992
                 
Indicator value 99.8% 99.7% 99.7% 99.7% 99.7% 99.7% 99.6% 99.6%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Physical Protection information not publicly available.



 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: August 4, 2008