skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Arkansas Nuclear 2

2Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned scrams 0 0 0 0 0 0 0 0
Critical hours 1942.1 1535.2 1991.5 2184.0 2208.0 2209.0 1807.9 1953.3
                 
Indicator value 0 0 0 0 0 0 0 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned power changes 0 1.0 1.0 0 0 0 0 0
Critical hours 1942.1 1535.2 1991.5 2184.0 2208.0 2209.0 1807.9 1953.3
                 
Indicator value 0 0.9 1.8 1.8 1.8 0.8 0 0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Scrams with complications   0 0 0 0 0 0 0
                 
                 
Indicator value         0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 3.30E-08 3.20E-08 -1.50E-08 -2.10E-08 -2.20E-08 -2.10E-08 -2.20E-08 3.20E-08
URI (ΔCDF) -2.40E-07 -2.40E-07 -2.20E-07 -2.40E-07 -2.30E-07 -2.30E-07 -2.30E-07 -2.20E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.07E-07 -2.08E-07 -2.35E-07 -2.61E-07 -2.52E-07 -2.51E-07 -2.52E-07 -1.88E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.10E-08 -1.10E-08 -1.00E-08 -1.00E-08 -1.10E-08 -1.10E-08 -2.50E-08 -2.50E-08
URI (ΔCDF) -5.60E-08 -5.40E-08 -5.30E-08 -5.00E-08 -5.00E-08 -4.90E-08 -5.00E-08 -4.90E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -6.70E-08 -6.50E-08 -6.30E-08 -6.00E-08 -6.10E-08 -6.00E-08 -7.50E-08 -7.40E-08

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 6.60E-09 6.50E-09 1.30E-08 1.30E-08 1.20E-08 1.10E-09 1.00E-09 -1.00E-08
URI (ΔCDF) 5.50E-08 5.50E-08 5.50E-08 5.50E-08 5.60E-08 5.60E-08 5.60E-08 9.10E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 6.16E-08 6.15E-08 6.80E-08 6.80E-08 6.80E-08 5.71E-08 5.70E-08 -9.00E-10

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.30E-10 -1.40E-10 -1.40E-10 -1.50E-10 -1.50E-10 6.00E-10 4.50E-10 2.00E-10
URI (ΔCDF) 3.80E-09 2.50E-09 2.50E-09 1.20E-09 1.20E-09 1.20E-09 1.20E-09 1.20E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 3.67E-09 2.36E-09 2.36E-09 1.05E-09 1.05E-09 1.80E-09 1.65E-09 1.40E-09

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 1.20E-10 1.20E-10 1.20E-10
URI (ΔCDF) -9.00E-10 -1.90E-09 -1.90E-09 -1.50E-09 -4.30E-10 5.70E-10 8.10E-10 1.90E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -9.00E-10 -1.90E-09 -1.90E-09 -1.50E-09 -4.30E-10 6.90E-10 9.30E-10 2.02E-09

Licensee Comments:

2Q/08: In July 2008, it was discovered that Consolidated Data Entry (CDE) failure #806 for ANO-2 (which occurred in November 2005) should have been flagged as a Cooling Water System MSPI failure. Effective as of the 2nd quarter 2008 submittal, failure record #806 was changed to reflect a valve demand failure for Service Water Sluice Gate 2CV-1471-1. This did not result in any color change in the ANO-2 Cooling Water System Mitigating System Performance Indicator.






Link to Notes

Reactor Coolant System Activity 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum activity 0.001650 0.002210 0.017400 0.000646 0.000899 0.000652 0.015500 0.002430 0.000838 0.000825 0.000879 0.001070
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.2 0.2 1.7 0.1 0.1 0.1 1.6 0.2 0.1 0.1 0.1 0.1
Reactor Coolant System Activity 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum activity 0.001280 0.001620 0.002750 0.003240 0.003400 0.005420 0.005270 0.005540 0.117000 0.001850 0.000594 0.000644
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.1 0.2 0.3 0.3 0.3 0.5 0.5 0.6 11.7 0.2 0.1 0.1

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum leakage 0.111 0.121 0.124 N/A 0.104 0.134 0.149 0.165 0.123 0.120 0.133 0.132
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 1.1 1.2 1.2 N/A 1.0 1.3 1.5 1.7 1.2 1.2 1.3 1.3
Reactor Coolant System Leakage 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum leakage 0.114 0.131 0.167 0.185 0.251 0.268 0.172 0.169 0.166 0.084 0.101 0.128
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 1.1 1.3 1.7 1.9 2.5 2.7 1.7 1.7 1.7 0.8 1.0 1.3

Licensee Comments:

6/08: Total Leakage is being reported in lieu of Identified Leakage.






Link to Notes

Drill/Exercise Performance 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful opportunities 10.0 17.0 7.0 23.0 21.0 4.0 11.0 34.0
Total opportunities 10.0 17.0 7.0 23.0 22.0 4.0 14.0 36.0
                 
Indicator value 97.8% 97.6% 97.7% 98.7% 98.6% 98.6% 96.7% 95.5%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Participating Key personnel 118.0 121.0 115.0 111.0 107.0 103.0 103.0 101.0
Total Key personnel 118.0 121.0 115.0 112.0 107.0 105.0 105.0 104.0
                 
Indicator value 100.0% 100.0% 100.0% 99.1% 100.0% 98.1% 98.1% 97.1%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful siren-tests 147 147 147 146 147 147 145 147
Total sirens-tests 147 147 147 147 147 147 147 147
                 
Indicator value 100.0% 100.0% 100.0% 99.8% 99.8% 99.8% 99.5% 99.7%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Physical Protection information not publicly available.



 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: August 4, 2008