Text Size: A+| A-| A   |   Text Only Site   |   Accessibility
ODOT Logo
Utililty Relocation Program OAR's
OAR 734
Oregon Administrative Rule, Utility Program
 
 
Pole Lines, Buried Cables, Pipe Lines, Sings, Miscellaneous Facilities and Miscellaneous Operation.
 
Click the link above to be directed to the OAR Citation.
 
734-055-0005 Scope
734-055-0010 Definition of Terms
734-055-0015 Permit Application Procedure
734-055-0020 Allocation of Cost
734-055-0025 Liability and Control
734-055-0035 Insurance and Bond
734-055-0040 Construction and Location Details
734-055-0045 Removal, Relocation or Repair
734-055-0050 Maintenance and Operation
734-055-0055 Other Agencies
734-055-0060 Effective Period of Permit
734-055-0070 Conformance with Regulations and Industry Codes
734-055-0080 Freeways
734-055-0090 Specific Construction Details
734-055-0100 Permit Allowing Open Cut of Road Surface
734-055-0110 Special "X" Permits
 

OAR 952
Oregon Administrative Rule, Oregon Utility Notification Center
 
 
 
Click on the link above to be directed to the OAR Citation.
 
 
952-001-0010 Definitions
952-001-0020 Project Plans to Notify Excavator or Requirements of Law
952-001-0030 Permits to Notify Excavator of Requirements of Law
952-001-0040 Pre-Marking Required by the Excavator; Exemption
952-001-0050 Excavator to Give Notice of Proposed Work; Exemption
952-001-0060 When Excavator May Give Less Than Forty-Eight (48) Business Day Hour Notice
952-001-0070 Operators to Mark Underground Facilities or Notify Excavator That None Exist
952-001-0080 Operators to Respond to Notifications Requesting Design Information
952-001-0090 Delay of Excavation Until Response from Facility Operators; Duty of Excavator to  Use Reasonable Care; Damage to Facilites
952-001-0100 Record Keeping Requirements

 
Page updated: February 04, 2007

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.