CFDA Logo Image of a U. S. flag

20.720 STATE DAMAGE PREVENTION PROGRAM GRANTS

(SDPP Grants)

FEDERAL AGENCY
PIPELINE AND HAZARDOUS MATERIAL SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION

AUTHORIZATION
PIPES Act Section 2(b), which added Section 60134 to the Pipeline Safety Law (49 U.S.C.).

OBJECTIVES
To improve State Damage prevention programs, which are intended to protect underground facilities from excavation damage.

TYPES OF ASSISTANCE
Project Grants.

USES AND USE RESTRICTIONS
Personnel, equipment, and activities that are needed by the State authority to enhance damage prevention programs. Grant funds may not be used for lobbying or in direct support of litigation.

Applicant Eligibility
Any State (including U.S. Territory or possessions) authority designated by the Governor is eligible to apply for a grant as long an agency within the State (including U.S. Territory or possessions) has an annual Section 60105 (49 U.S.C.) certification or Section 60106 (49 U.S.C.) agreement in effect with PHMSA. If a State (including U.S. Territory or possessions) does not have a certification or agreement with PHMSA, then no State (including U.S. Territory or possessions) authority can receive a grant.

Beneficiary Eligibility
State Government, U.S. Territory and possessions would receive the ultimate benefit from this program.

Credentials/Documentation
A written application describing the current status of the State Damage Prevention Program and plans for improvements.

Preapplication Coordination
This program is excluded from coverage under E.O. 12372.

Application Procedure
Through the website at www.Grants.gov.

Award Procedure
Panel of stakeholders will review and score applications. Grants will be awarded to applicants with the highest score until the available funds are exhausted.

Deadlines
Applications due two months after opportunity is posted to www.grants.gov.

Range of Approval/Disapproval Time
Sixty days after application deadline.

Appeals
None.

Renewals
None.

Formula and Matching Requirements
None.

Length and Time Phasing of Assistance
There is a restricion on the time permitted to spend the money awarded. It must be spent within the calendar year of the grant.

Reports
Status report is due six months after the start date of the grant, and a final report within 30 days of the end of the grant period.

Audits
In accordance with the provisions of OMB Circular No. A-133 (Revised, June 24, 1997), "Audits of States, Local Governments, and Nonprofit Organizations, nonfederal entities that receive financial assistance of $300,000 or more in Federal awards will have a single or a program-specific audit conducted for that year. Nonfederal entities that expend less than $300,000 a year in Federal awards are exempt from Federal audit requirements for that year, except as noted in Circular No. A-133.

Records
Grant recipient must maintain: (a) documentation supporting the cost incurred under the grant, and (b) information regarding any sub-awards made using grant funds.

Account Identification
69-5172-0-2-407.

Obligations
FY 07 $0; FY 08 est $1,500,000 and FY 09 est not available.

Range and Average of Financial Assistance
$0 to $100,000.

PROGRAM ACCOMPLISHMENTS
None.

REGULATIONS, GUIDELINES, AND LITERATURE
Pipeline Safety Regulations, 49 CFR 192.614, 49 CFR 192.616, 49 CFR 195.440, 49 CFR 195.442, 49 CFR 198.37, and 49 CFR 198.39 Individual copies of regulations may be requested from: Office of Pipeline Safety, Pipeline and Hazardous Material Safety Administration, Department of Transportation, 1200 New Jersey Avenue, SE East Building, 2nd Floor, Washington, DC 205901, Telephone: (202) 366-4595 Fax: (202) 366-4566.

Regional or Local Office
None.

Headquarters Office
Pipelines and Hazardous Materials Safety Administration, Department of Transportation, East Building, Room E-22-103, 1200 New Jersey Avenue, S.E., Washington, DC 20590, (202) 366-6942, Attn: Max Kieba; E-mail: max.kieba@dot.gov.

Web Site Address
http://www.phmsa.dot.gov/

RELATED PROGRAMS
None.

EXAMPLES OF FUNDED PROJECTS
None.

CRITERIA FOR SELECTING PROPOSALS
All proposals from eligible state agencies are considered for funding based on their statewide damage prevention program (or a detailed plan to develop a program within 4 years) that implements the 9 elements of an effective damage prevention program identified in Section 2(b) of the PIPES Act (Pipeline Safety Laws 49 U.S.C. Section 60134).


General Services Administration
Office of Chief Acquisition Officer
Regulatory and Federal Assistance Division (VIR)