Inactive National Notices to Lessees and
Operators |
NTL Number |
Inactive Date/
Reason |
Subject |
2007-N03 |
Rescinded 09/30/2007 |
Outage of Pay.Gov for electronic fee payments,
Friday, September 28, 2007; through Sunday, September 30, 2007 |
2007-N01 |
Expired 04/29/2007 |
2007 Industry Awards
Program and Luncheon |
2006-N04 |
Superseded by NTL No.
2006-N05 |
New Payment Method for Existing
Cost Recovery Fees |
2006-N03 |
Expired 03/01/2006 |
Reminder to Submit Performance Measures Data
by March 31, 2006 |
2006-N02 |
Superseded by NTL No.
2006-N04 |
Payment Method for New and Certain
Existing Cost Recovery Fees |
2006-N01 |
Expired 04/29/2006 |
2006 Industry Awards Program and
Luncheon |
2005-N02 |
03/02/2005 |
Performance Measures
for OCS Operators and Form MMS-131 |
2005-N01 |
Expired 04/29/2005 |
2005 Industry Awards Program and
Luncheon |
2004-N01 |
Superseded by
2007-N02 |
Revised Assessment Matrix |
2003-N05 |
Expired 02/6/2004 |
eWell Permit and
Reporting System Presentations |
2003-N03 |
03/07/2003 |
Performance Measures for OCS
Operators and Form MMS-131 |
2003-N02 |
Expired
11/01/2003 |
Reminder Concerning Periodic Inspection of Unmanned Fixed OCS
Platforms |
2003-N01 |
Expired 04/29/2003 |
2003 Industry
Awards Program/Luncheon |
2002-N13 |
Rescinded
6/17/2008 |
Drilling and Well Permit and Reporting
Forms |
2002-N12 |
11/1/2002 |
OEMM eGov Transformation Presentations |
2002-N11 |
10/30/2002 |
Rescheduled Houston
MMS Well
Applications and Reporting Forms Workshop
|
2002-N10 |
11/8/2002 |
Surface Blowout Preventer Workshop for
Floating Drilling Operations |
2002-N09 |
09/30/2002 |
MMS
Well Applications and Reporting Forms Workshop |
2002-N08 |
08/20/2002 |
Deepwater
Blowout Intervention Workshop |
2002-N06 |
Rescinded
06/17/2008 |
Guidelines for Crane Load Tests and Recordkeeping on Fixed Offshore
OCS Facilities |
2002-N05 |
06/15/2002 |
International
Workshop (June 12-14, 2002): Fire & Blast Considerations in the Future Design of
Offshore Facilities |
2002-N04 |
04/15/2002 |
4th
Annual MMS Industry Awards Program and Luncheon |
2002-N03 |
04/30/2002 |
2nd
International Workshop on Human Factors in Offshore Operations |
2002-N01 |
Superseded by
2003-N03 |
Performance Measures for OCS Operators and Form MMS-131 |
2001-N03 |
10/15/2002 |
Subpart
O - Well Control and Production Safety Training |
2001-N01 |
04/15/2001 |
2000
Industry Awards Program and Luncheon |
2000-N06 - Attachment 1
Attachment 2 |
Incorporated into 30 CFR 250 subpart B
(final rule published 08/30/2005) |
Deepwater Operations Plans (DWOP) |
2000 N05 |
Incorporated into 30 CFR 250 subpart B
(final rule published 08/30/2005) |
Conservation Information |
2000 N04 |
04/1/2001 |
Guidelines
for Crane and Rigging Operations on Fixed Offshore OCS Facilities |
2000-N03 |
10/15/2000 |
Subpart
O - Well Control and Production Safety Training (Clarification of 30 CFR 250) |
2000-N02 |
05/9/2000 |
Floating
Production Storage and Offloading (FPSO) Systems Workshop |
2000-N01 |
03/1/2000 |
Crane
Safety Workshop |
99-N07 |
11/23/99 |
1999
Industry Awards Program and Luncheon |
99-N06 |
05/13/99 |
Information
on Final Rule and Changes on MMS Offshore Energy and Minerals Management Appeals Process |
99-N05 |
05/23/99 |
Year
2000 and End of Week Compliance of Global Positioning System Receivers |
99-N04 |
Superseded by
2007-N02 |
Revised
Guidelines for Royalty Relief Under 30 CFR Part 203 |
99-N03 |
Superseded
by 2002-N01 |
Performance Measures for OCS Operators and Form MMS-131 |
99-N02 |
01/14/99 |
Invitation to MMS Industry Awards Program and Luncheon |
98-19N |
12/29/98 |
Year
2000 (Y2K) Readiness Disclosure Statement |
Addendum
to
98-18N
and
98-18N |
Superseded by
2003-N06
and
Attachment 1,
Attachment 2,
05/172003 |
Additional Guidance for Third-Party Guarantees
Supplemental Bond Procedures |
98-17N |
Superseded
by
99-N04 |
Revised
Guidelines for Royalty Relief Under 30 CFR Part 203 |
98-16N |
10/28/98 |
American
Petroleum Institute Specification 6D (SPEC 6D), Specification for Pipeline Valves
(Gate, Plug, Ball, and Check Valves). |
98-15N |
Expired 11/13/98 |
Invitation
to Minerals Management Service/Industry Performance Measures/Best Practices Workshop |
98-14N |
07/1/98 |
Conservation
Information |
98-12N |
Rescinded
06/17/2008 |
Determination of Pollution Inspection Frequencies for Unmanned
Facilities |
98-11N |
Rescinded by Federal Register Notice,
01/13/99 |
Guidelines
for Application for Suspension of Production Due to Uneconomic Market Conditions |
98-10N |
07/1/98 |
Decentralization
of the Lessee Training Program |
98-9N |
Expired
12/31/98 |
Redesignation
of 30 CFR Part 250--Oil and Gas and Sulphur Operations in the Outer Continental Shelf The second link is an addendum to the original NTL that provides
additional clarification. |
98-8N |
06/1/98 |
Revised guidelines for submission of a Deepwater Operations Plan
(DWOP) for all deepwater development projects (water depths greater than 1,000 feet) and
all projects utilizing subsea production technology. These guidelines are more
user-friendly and answer many commonly asked questions. The intent and goal of the DWOP
remain as originally described in the NTL 96-4N. |
98-7N |
Expired
11/2/98 |
Reminder
Concerning Periodic Inspection of Platforms in Accordance with Section 14 Survey
Requirements of American Petroleum Institute Recommended Practice 2A, "Planning,
Designing, and Constructing Fixed Offshore Platforms," Nineteenth Edition (August 1,
1991) and Twentieth Edition (July 1, 1993) |
98-6N |
Superseded
by
99-N03 |
Performance
Measures for OCS Operators and Form MMS-131 |
98-4N |
Rescinded
by Federal Register Notice, 05/21/2003 |
Interim Guidance for Applying "Simplified Fatigue Analysis"
Procedure from American Petroleum Institute Recommended Practice 2A,
"Planning, Designing, and Constructing Fixed Offshore Platforms,"
Nineteenth Edition (August 1, 1991) and Twentieth Edition (July 1,
1993) and its Supplement 1 (February 1, 1997) |
98-3N |
Superseded
by
98-17N, 11/1/98 |
Minerals
Management Service Guidelines Available for Royalty Relief under 30 CFR Part 203 |
98-2N |
01/23/98 |
Minerals
Management Service Guidance Regarding American Petroleum Institute Specification 14A,
"Specification for Subsurface Safety Valve Equipment," Ninth Edition (July 1,
1994) and Supplement 1 |
98-1N |
Rescinded
by Federal Register Notice, 05/21/2003 |
Interim Guidance for Applying Platform Design Criteria from American
Petroleum Institute Recommended Practice 2A, "Planning,
Designing, and Constructing Fixed Offshore Platforms," Nineteenth
Edition (August 1, 1991) and Twentieth Edition (July 1, 1993) and
its Supplement 1 (February 1, 1997) |
97-5N |
Superseded by
2007-N02 |
Outer Continental Shelf Inspection Program:
Generalized Matrix for Civil Penalty Assessments in $/Day/Violation |
97-4N |
Superseded by
2007-N02 |
Outer Continental Shelf Civil Penalties Program: Annual Summary to
be Published |
97-2N |
Superseded by 2000-N07 |
Well
Naming and Numbering Standards |
97-3N |
08/1/97 |
Outer Continental Shelf Annual Performance Review |
97-1N |
Rescinded
by Federal Register Notice, 11/20/98 |
Blowout
Preventer Requirements for Drilling |
96-7N |
Superseded by
2007-N02 |
Outer Continental Shelf Civil Penalties Program |
96-6N |
Superseded by
98-14N,
07/1/98 |
Conservation Information |
96-5N |
Superseded by
98-13N,
07/1/98 |
Use of New or Alternative Technology and Procedures |
96-4N |
Superseded
by
98-8N |
Revised
guidelines for submission of a Deepwater Operations Plan (DWOP) for all deepwater
development projects (water depths greater than 1,000 feet) and all projects utilizing
subsea production technology. These guidelines are more user friendly and answer many
commonly asked questions. The intent and goal of the DWOP remain as originally described
in the NTL 96-4N. |
96-3N |
Superseded
by
98-5N |
Application
and Audit Fees for Royalty Relief Requests or Adjustment Under 30 CFR Part 203 |
96-2N |
Rescinded by Federal Register Notice, 11/10/98 |
Reporting Oil Spills |
96-1N |
Superseded
by
98-12N |
Determination
of Pollution Inspection Frequencies for Unmanned Facilities |
95-1N |
Rescinded by Federal Register Notice, 11/10/98 |
Suspension of Requirements for Updating Safety and Pollution
Prevention Equipment Inventory Lists |
94-1N |
Superseded
by
98-10N |
Decentralization
of the Lessee Training Program |
93-2N |
Rescinded by Federal Register Notice, 11/10/98 |
Liability of Assignors, Assignees, and Co-lessees for
Plugging of Wells and Removal of Property on Termination of an Outer Continental Shelf Oil
and Gas Lease |
93-1N |
Superseded
by
99-N01 |
Guidelines
for an Application for Certificate of Oil Spill Financial Responsibility for Covered
Offshore Facilities |
92-1N |
Superseded
by
98-11N |
Guidelines for an Application for Suspension of Production
Due to Uneconomic Market Conditions |