FOLK CONSTRUCTION CO., INC., WAB No. 76-02 (WAB Feb. 26, 1976)
CCASE:
WAB CASE NO. 76-02
DDATE:
19760226
TTEXT:
~1
[1] [ 76-02.WAB ATTACHMENT]
TELEGRAPHIC MESSAGE
NAME OF AGENCY: U.S. Department of Labor
Office of Labor Relations and Civil Rights
ACCOUNTING CLASSIFICATION: 6165-2-2-N-500-72500-2330-000
DATE PREPARED: 2/26/76
NAME: Terry R. Yellig
TO: All Interested Parties on attached sheet
RE: WAB CASE NO. 76-02 TOM BIGBY WATERWAY, MS
PREVAILING WAGE RATES APPLICABLE TO CONSTRUCTION OF
ILLINOIS CENTRAL GULF RAILROAD RELOCATION. WAGE DECISION
NO. 76-MS-41 TOM BIGBY WATERWAY MISS.
THE BOARD HAS CAREFULLY AND THOROUGHLY REVIEWED THE RECORDS
AND DATA SUBMITTED IN THIS CASE TOGETHER WITH THE PRE-HEARING
BRIEFS AND THE ARGUMENTS AND DISCUSSIONS AT THE TWO HEARINGS
FEBRUARY 13 AND FEBRUARY 25, 1976 AND IS CONVINCED THAT THE TWO
PRINCIPLES AND PROCEDURES APPLIED BY THE ESA WITH RESPECT TO WAGE
PREDETERMINATION NO. 76-MS-41, ISSUED FEBRUARY 23, 1976 ARE
APPLICABLE AND APPROPRIATE.
THE BOARD HAS ADOPTED A SHORT FORM DECISION AND ORDER IN THIS
MATTER TO MEET THE REQUESTS OF ALL PARTIES FOR EXPEDITION. A
SUPPLEMENTARY DECISION WILL FOLLOW.
THE PETITION IS DENIED.
BY CHAIRMAN OSCAR SMITH AND MEMBER STUART ROTHMAN [1]