TELE-SENTRY SECURITY, INC., 86-DBA-33 and 55 (ALJ Sept. 11, 1987)


CCASE: TELE-SENTRY SECURITY, INC., DDATE: 19870911 TTEXT: ~1 [1] [87-43.WAB ATTACHMENT] U.S. Department of Labor Office of Administrative Law Judges Heritage Plaza, Suite 530 111 Veterans Memorial Boulevard Metairie, Louisiana 70005 DATE: September 11, 1987 CASE NO. 86-DBA-33 86-DBA-55 IN THE MATTER OF TELE-SENTRY SECURITY, INC., Prime Contractor Appearances: Stephen J. Simko, Jr., Attorney and Larry A. Auerback, Attorney U.S. Department of Labor Office of the Solicitor Room 339 1371 Peachtree Street, N.E. Atlanta, Georgia 30309 For the Department of Labor James E. Watt, President Tele-Sentry Security, Inc. Suite 107 510 South 52nd Street Phoenix, Arizona 85281 For Tele-Sentry Security, Inc., Respondent BEFORE: HONORABLE QUENTIN P. McCOLGIN Administrative Law Judge DECISION AND ORDER This is a consolidation of two cases involving alleged violations of the Contract Work Hour[s] and Safety Standards Act, 40 U.S.C. [sec] 327 et seq., and the Davis[-]Bacon Act, 40 U.S.C. 276(a) et seq., by the respondent, Telesentry Security, Inc. (TSSI). 86-DBA-55 concerns a contract with the General Services Administration (GSA) for the installation of security systems in the Richard B. Russell Federal Building and the U.S. Courthouse in Atlanta, Georgia. 84-DBA-33 concerns a contract with the United States Air Force for the upgrade of the fire alarm system at Keesler Air Force Base, Mississippi. Both cases contain a dispute as to the payment of prevailing wage rates by respondent. Additionally, the Air Force contract case contains a dispute as to overtime pay. [1] ~2 [2] This-case was referred to the Office' of Administrative Law Judges on May 15, 1984. For the convenience of the witnesses a hearing was held in Atlanta, Georgia on August 4, 1986 and in Gulfport, Mississippi on August 11, 1986. /FN1/ Evidence relating to both cases was taken at both hearings. The parties were afforded an opportunity to present evidence and argument in support of their respective positions. Post-hearing briefs were submitted by both the respondent, Tele-Sentry Security, Inc. and the Administrator. Having considered all of the evidence and argument, the undersigned does hereby issue the findings, conclusions and order set forth below. Issues This matter contains three issues to be resolved. 1. Did respondent pay its employees in accordance with the applicable wage rate for the classification of work they performed in regard to Contract Number GS-04-B-81006 with the GSA in Atlanta, Georgia? 2. Did respondent pay its employees in accordance with the applicable wage rate for the classification of work they performed in regard to Contract Number F22600-81-C0028 with the U.S. Air Force at Keesler AFB, Mississippi? 3. Whether certain employees of respondent were entitled to overtime pay for work performed in connection with the job identified as Contract Number F22600-81-C0028 at Keesler AFB, Mississippi? Statement of the Case GSA CONTRACT - ATLANTA, GEORGIA Many of the facts surrounding this case are undisputed and are supported by the testimony and exhibits offered by both parties. TSSI was awarded contract number GS-04-B-81006 on March 20, 1981. (LX Q). The work included installing a perimeter magnetic door contact, a door access control system, a closed circuit television system and an intercom system. (TA pp. 21-24). The contract price of the work was $125,000.00. (LX Q). [2] ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ /FN1/ All transcript references will be made as follows: TA for the Atlanta transcript; TG for the Gulfport transcript. [2] ~3 [3] Although work was to be completed 120 days after notice to proceed, the period for which wage payments are in dispute runs from September of 1981 to October of 1982. (LX Q; LX K). Employees were hired by respondent to install conduit, pull wire and cable into the conduit, mount electrical boxes and run cable not in conduit between these boxes and a central control station. The respondent classified these employees as Electrician Laborers and as such paid them $8.43 per hour as listed in Wage Decision GA-80-1006 and its modifications (TA pp. 21-24; LX B p. 7). This wage rate was that of Laborer, Group 1. Respondent classified his supervisor as an Electrician, Wireman and paid him $15.60 per hour as required by the wage decision for that category. (TA pp. 26-27; LX V p. 6). The supervisor made all the electrical connections for the installation which took approximately fifteen percent of his time. (TA p. 24). The installation consisted of mainly 24 volt equipment and a few 120 volt electrical power feeds to that equipment. (TA pp. 21-23). There are some discrepancies in the testimony of James E. Watt, president of TSSI, and David A. Henson, Electrical Engineer for GSA. /FN2/ Mr. Henson testified that he informed Mr. Watt that electrician's wage rates were appropriate for the work to be done. (TA p. 81). Mr. Henson denied that he acquiesced in the paying of laborer's wages for the work to be performed under the contract. (TA pp. 80-81). Mr. Watt testified that Mr. Henson approved the use of laborers to run conduit. (TA p. 117). Mr. Henson further testified that even after Mr. Watt had been alerted that electrician's not laborer's wages were to be paid, Mr. Watt "reaffirmed his bid without commenting or taking exception to any of the wage rates shown in the project specifications." (TA p. 78). Mr. Watt confirmed that he did not seek a review of the wage determination made for the Atlanta labor market. (TA p. 131). Nevertheless, the thrust of the defense presented in this proceeding is essentia[l]ly a challenge to the correctness of the wage determination which was not appealed. At the hearing, a collection of telephone directory advertisements, the State of Georgia Construction Industry Licensing Board Act and the State of Arizona Registrar of Contractors Statutes and Rules was presented to support the contention that low voltage fire and security alarm work was separate and distinct from electrical work. Post-hearing Mr. Watt submitted excerpts from the U.S. Department of Labor, [3] ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ /FN2/ Mr. James E. Watt, President of Tele-Sentry Security, Inc. is representing respondent TSSI in this matter. He is also a principal witness. [3] ~4 [4] Directory of Occupational Titles,- Fourth Edition, 1977. The directory contains separate definitions for "protective signal" workers and "electricians." Martin Jack Ray, Assistant Business Manager for the International Brotherhood of Electrical Workers, (IBEW) Local Union 613 testified that laborers were not used to run conduit or pull wire. (TA pp. 29, 34). He testified that electricians were used to install security systems similar in nature to those installed under the contract in question. (TA pp. 30-33). Also, he explained that an electrician laborer was a man who loaded and unloaded conduits and electrical equipment, but did not install any of those materials. (TA pp. 46-48). Ronald Arthur Lundstrom, President of Whitehead Electric Company, an electrical contracting firm, testified that his firm installed security systems and used electricians exclusively for the installations. (TA pp. 50-52). He testified that this work included the running of conduit and the installation of wire both in and out of conduit. (TA pp. 51-52). Edgar Collins Walton the owner of Dixie Electric Company, an electrical contracting firm, testified in the same vein as Mr. Lundstrom. (TA p. 59). He stated that his firm installed security systems and used electricians exclusively to do so. (TA pp. 60-62). John W. Womack Secretary-Treasurer of Womack Electric Company, Incorporated, another electrical contracting firm, also testified that electricians were used exclusively in the installation of low voltage electrical systems. (TA pp. 67-70 ). AIR FORCE CONTRACT - KEESLER AFB, MISSISSIPPI As with the GSA contract many of the facts surrounding this case are undisputed. TSSI was awarded contract number F22600-81-C0028 on April 7, 1981 (LX A). The work included installation of smoke detectors, installation of new fire alarm equipment, installation of a new central fire alarm receiver in the base fire state and modification or replacement of existing fire alarm transmitters. (GS p. 25; LX A; TX 20). The contract price of the work was $420,000.00 with a completion time of 270 days after notice to proceed. (LX A). September, 1981 through April, 1982 is the period for which wage payments are in dispute. Wage Decision MS-81-1174 was applicable to this job. (LX B). $13. 25 per hour was the listed rate for electricians and $6.80 per hour was the listed rate for laborers. (LX B). /FN3/ As [4] ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ /FN3/ Wage Decision Number MS-81-1174 does not contain a category called electrician laborer as did Wage Decision Number GA-80-1006. MS-81-1174 lists only unskilled laborers. (TG p. 65; LX V p. 7; LX B). [4] ~5 [5] with the GSA contract, the respondent hired employees to run conduit, pull wire and cable, install electrical connection boxes and mount electrical and fire alarm panels. (TG pp. 29-30, 33, 36, 98, 114, 145). Respondent classified these people as laborers and paid them $8.40 per hour. (TG p. 36: LX P). Respondent paid his supervisor, whom he classified as an electrician $14.02 per hour. (LX G). Respondent also paid some other employees as electricians when they were installing smoke detectors. (TG pp. 115; LX G). Harold Lloyd Lee, Business Manager for the IBEW, was called to testify. (TG p. 41). The local that he worked for covered twelve Mississippi counties from Hattiesburg south to the Gulf of Mexico. (TG p. 42). Mr. Lee testified that installing conduit was exclusively within the purview of electricians. (TG p. 42). He further testified that only electricians would mount electrical or fire panels and pull wire. (TG p. 43). Thomas C. Morgan, President of Sharp Electric, Incorporated testified that electricians or their apprentices would exclusively do the work of running conduit, pulling wire and mounting electrical and fire alarm boxes. (TG pp. 57-59). Mr. Morgan testified that an apprentice would be a worker registered in a[n] approved apprenticeship program with the IBEW. (TG pp. 59-60). He also stated that he was not familiar with a category of employee called "electrical helper." (TG p. 59). Sharp Electric does electrical construction work, similar in nature to that required under the Air Force contract, in the Southern thirteen counties of Mississippi. (TG pp. 58, 60-61). Robert D. Foster, Compliance Officer with the Wage and Hour Division[] of the U.S. Department of Labor testified in regard to his investigation of Tele-Sentry Security, Inc. (TG p. 68). He testified that the investigation encompassed the performance of the Air Force contract and that the respondent's employees were owed money under both the Davis-Bacon Act (DBRA) and the Contract Work Hours and Safety Standards Act (CWHSSA). (TG pp. 68-70 ) . He stated that he saw, "people using screwdrivers, snips, pliers, hammers, drills, this type of thing, the normal tools that you would see an electrician or a craftsman wear." (TG p. 69). From this Mr. Foster concluded that the people were doing electricians' work and thus made computations for the amounts owed them under the DBRA. Mr. Foster further testified that he determined that each employee worked thirty minutes overtime every morning prior to the start time recorded. (TG pp. 70-71 ) . He found that respondent's employees were required to report to a trailer for 7:00 o'clock in the morning. (TG pp. 73-74). He continued that not every worker was present at 7:00 o'clock everyday and accordingly he reduced the extra time worked per [5] ~6 [6] week for each employee. /FN4/ (TG p. 73). Mr. Foster also stated that he did not attempt to measure time in the afternoons. (TG p. 88). Mr. Foster calculated the amount owed the employees under the CWHSSA resulting from these findings. /FN5/ Several of the TSSI employees that worked the job in question testified at the hearing. Kenneth L. Burton testified that he was instructed by Al Brady, the TSSI job superintendent, to be at the trailer about 7:00 o'clock every morning. (TG p. 30). At that time Burton would draw his tools and materials and proceed to the actual job site at about 7:30. (TG pp. 30-31). Burton testified that he drank coffee between 7:00 and 7:30. (TG p. 32). Joseph D. Smith initially testified that he could not recall whether he reported to work at 7:00 or 7:30. (TG p. 91). Upon being shown a previous statement signed by him, Mr. Smith testified that he was told by Al Brady to arrive at 7:00 (TR pp. 110-111; LX W). Mr. Wayne Brady, son of Al Brady job superintendent, testified that he had to get to the trailer early to be at the job site for 7:30. (TG pp. 115-116, 119). Wayne Brady went on to say that he was at the job between 7:20 and 7:25. (TG p. 116). Mr. Brady was also shown his previous statement that he arrived at the trailer at 7:00. (TG p. 120; LX X). Mr. Brady said that early arrival was not mandatory, but he did not dispute the accuracy of his prior statement. (TG p. 122). James C. Auld testified that he arrived on the job between 7:10 and 7:20 every morning, but that this was after the arrival of most of the other men. (TG pp. 145-146, 156-157). Mr. Auld was shown his prior statement showing that he arrived at the trailer between 7:00 and 7:10. (TG p. 151; LX Y). He did not dispute the accuracy of his prior statement. (TG p. 152). [6] ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ /FN4/ Mr. Foster noted that although the employees were required to report to the trailer at 7:00 a.m., not every employee arrived on time every day. As such Mr. Foster in conference with TSSI agreed to reduce the extra hours worked to arrive at a figure that reasonably reflected actual practices. (TG p. 73 ) . To do this one day per week of the time attributed to the early start was eliminated. For example, if an employee worked 5 days he was given credit for an extra thirty minutes for 4 days, rendering a weekly total of 2 hours not 2 1/2 hours attributable to the 7:00 a.m. arrival. (TG p. 73 LX F). /FN5/ Mr. Foster's calculations for amounts owed under both the DBRA and the CWHSSA are found in Labor Exhibits D, E and F. [6] ~7 [7] Findings of Fact and Conclusions of Law It is-undisputed that respondent's employees performed the work of running conduit, pulling wire and mounting electrical boxes and panels while on both the Atlanta and Keesler, AFB jobs. It is further undisputed that respondent paid these employees consistent with its classification of them as "Electrician; Laborer" listed in Wage Decision GA-80-1006 for the Atlanta job and for the Keesler, AFB job respondent classified the employees as laborers and paid them the same wages as the Atlanta job employees. What is in dispute is the accuracy of the classifications. Respondent has several contentions. First, TSSI contends that low voltage fire and security installations are not part of electrical work in general and as such no category in either Wage Decision is applicable to this type of work. Second, TSSI contends that it had the agreement of GSA and the Air Force to classify and pay its employees as laborers. Third, TSSI contends that the work of running conduits, pulling wire and mounting boxes required no electrical skill or knowledge and could be performed by virtually unskilled laborers. Therefore, it would not be necessary to pay electricians' wages; for work that did not require all of an electrician's skill. The Administrator, in reliance on Matter of Fry Brothers Corp., [1973-78 Transfer Binder, Wages-Hours Lab. L. Rep. (CCH) [par] 31,113 (July 8, 1977), opposes respondent's contention. First, the Administrator contends that TSSI's employees were doing work that was within the exclusive domain of electricians and as such they must be paid as electricians regardless of the industry they are employed in or the respondent's arbitrary classification. Second, the Administrator contends that neither the GSA or the Air Force had the authority to determine classifications of wage rates as this authority is vested exclusively in the Department of Labor. Third, the Administrator contends that an employer may not divide the work ascribed to a single labor classification according to skill level required and reduce wage rates as a result of the division. To challenge a wage determination 29 C.F.R. [sec] 1.8 allows an interested party to seek reconsideration by the Administrator of a wage decision. 29 C.F.R. [sec] 1.9 allows an interested party to appeal the results of its request under [sec] 1.8 to the Wage Appeals Board. Fry speaks to the timeliness of a wage determination challenge. When an interested person in the construction industry desires to challenge a practice of the Labor Department to accept the negotiated wage rates as prevailing without a wage data survey, it is necessary that the attack come [7] ~8 [8] before the Labor Department decision becomes the basis upon which bids are taken. It should not be raised at the enforcement stage. Lab. L. Rep. (CCH) [par] 31,113. The evidence shows that while TSSI was cognizant of the fact that no classification for low voltage fire and security system installer was contained in either wage determination, it did not pursue a request to have a wage data survey performed to determine the prevailing wage for this type of work. (TA pp. 127-131). Thus, respondent is precluded from challenging the wage determination in this proceeding and the wage rates specified in Wage Decision GA-80-1006 controls with respect to the Atlanta contract and Wage Decision MS-81-1174 controls with respect to the Keesler, AFB contract. The essence of respondent's second contention is that he relied on and was in conformity with an agreement reached with the GSA as to workers' wages. Respondent alleges that David Henson, Electrical Engineer with the GSA, approved the classifications of the employees as laborers as opposed to electricians. Respondent further alleges that the Air Force too approved the classification of its employees as laborers. (TA p. 117). Mr. Henson denied having given such approval, however, it is not necessary to resolve this factual dispute. "Under the Portal to Portal Act (29 U.S.C. 259 /FN6/ [)] only a written ruling of [8] ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ /FN6/ 29 U.S.C. 259 states in relevant part: (a) In any action or proceeding based on any act or omission on or after May 14, 1947, no employer shall be subject to any liability or punishment for or on account of the failure of the employer to pay minimum wages or overtime compensation under the Bacon-Davis Act [40 U.S.C.A. [sec] 276a et seq.], if he pleads and proves that the act or omission complained of was in good faith in conformity with and in reliance on any written administrative regulation, order, ruling, approval, or interpretation, of the agency of the United States specified in subsection (b) of this section, * * * (b) The agency referred to in subsection (a) of this section shall be - * * * (3) in the case of the Bacon-Davis Act [40 U.S.C.A. [sec] 276a et seq.] - the Secretary of Labor. [8] ~9 [9] the Secretary of Labor can be relied upon as a defense against liability for wages which must be paid under the Davis-Bacon Act." Fry, Lab. L. Rep. (CCH) [par] 31,113. Thus, the claimed verbal approval by GSA and Air Force officials is patently insufficient to establish the defense of good faith reliance. See Hodgson v. Square A. Co., 459 F.2d 805 (6th Cir. 1972). Respondent's second contention must therefore fail as a matter of law. Respondents final contention is that the running of conduit, pulling of wire and mounting of boxes do not require all of the skill or knowledge possessed by electricians and as such it is the common practice of the non-union fire and security alarm business to classify workers doing the above listed tasks as laborers and to pay them accordingly. This position runs afoul of Fry on two counts. First, Fry holds that where a prevailing wage determination is based on negotiated (union) wage rates, the classifications of work which are the basis of the wage rates must govern. Lab. L.. Rep. (CCH) [par] 31,113. In other words, if the negotiated wage rate for an electrician is based on the fact that an electrician performs tasks X, Y and Z then any employee performing tasks X, Y and Z must be classified and paid as an electrician. Second, Fry specifically prohibits the division of a single class of work into subclasses based on the degree of skill required to perform the different tasks encompassed by the single classification. Under established principles of Davis-Bacon Act administration, when the wage predetermination schedule contains only one wage rate for the carpenter classification without intermediate rates, it is not permissible for contractors who come on the project site, whether organized or unorganized, to divide work customarily considered to be the work of the carpenters' craft into several parts measured according to the contractor by his assessment of the degree of skill of the employee and to pay for such division of the work at less than the specified rate for the carpenters' craft. Lab. L. Rep. (CCH) [par] 31,113. Fry concerned the carpenters' craft and these cases concern the electrical craft, but the principle is identical. [9] ~10 [10] It is undisputed that TSSI's employees ran conduit, pulled wire and cable and mounted electrical boxes in performance of the Atlanta contract. Testimony from Martin J. Ray, Assistant Business Manager of IBEW Local 613, Ronald A. Lun[d]strom, Edgar C. Walton and John W. Womack - all three officers for electrical contracting firms - unequivocally showed that the such activities were within the ambit of work usually, customarily and exclusively performed by electricians. (TA pp. 30-33, 50-52 60-62, 67-70). Mr. Ray further testified that the category Electrician, Laborer applied only to a man who loaded and unloaded, but did not install conduits and other electrical equipment. (TA pp. 46-48). It is undisputed that TSSI's employees ran conduit, pulled wire and mounted electrical and fire panels in performance of the Keesler, AFB contract. Testimony was given by Harold L. Lee, Business Manager for the IBEW local covering Southern Mississippi that exclusively electricians performed the tasks of running conduit, pulling wire and mounting electrical and fire panels. (TG pp. 42-43). This was corroborated by the testimony of Thomas C. Morgan, President of an electrical contracting firm doing business in Southern Mississippi. (TG pp. 57-59). In consideration of the above evidence, the undersigned finds that for both the Atlanta and Keesler, AFB contracts the work performed by TSSI's employees was of a type performed exclusively by electricians under the classification systems that served as the basis for their respective Wage Decisions. The employees who worked on the Atlanta job (Contract No. GS-04-B-810006) should have been paid in accordance with the minimum wage rate for electricians listed in Wage Decision GA-80-1006, i.e., $15.60 per hour. The employees who worked on the Keesler, AFB job (Contract No. F22600-81-C0028) should have been paid in accordance with the minimum wage rate for electricians listed in Wage Decision MS-81-1174, i.e., $13.25 per hour. In addition to the classification dispute, the Administrator contends that TSSI employees were due payment for time that was worked, but not recorded on their daily time sheets for the Keesler, AFB job. This allegation is based on the observations of Robert D. Forster, Compliance Officer with the Wage and Hour Division of the U.S. Department of Labor. He testified that the employees were required to arrive thirty minutes prior to the official start of their work day to receive instructions and draw tools and supplies. (TG pp. 70-71). Respondent denies this. The evidence on this issue consists of the testimony of the compliance officer and that of respondent's former employees. Kenneth L. Burton, Joseph D. Smith, Wayne A. Brady and James C. [10] ~11 [11] Auld, all employees of TSSI on the Keesler AFB job, testified at the hearing. Smith, Brady and Auld had made prior statements to the Department of Labor investigator which they were shown during their testimony. (LX W, X, Y). Burton testified that he was told by the TSSI job superintendent to report to the trailer for 7:00 o'clock not a 7:30 when the recorded time began. (TG p. 30). Smith testified that he also was instructed to arrive at the trailer for 7:00. (TG pp. 110-111). Brady, son of the job superintendent, testified that the 7:00 o'clock arrival at the trailer was not mandatory. (TG p. 122). Auld testified that he arrived at the trailer between 7:00 and 7:10 every morning. (TG pp. 151, 152). All of the men were in concurrence that each morning they reported to the trailer where they were given instructions and drew their tools and supplies. (TG pp. 31, 116). The testimony shows that the employees reported to the trailer in sufficient time in advance of 7:30 a.m. so that they could be at their designated job site for that day at 7:30 a.m. (TG pp. 30-31, 107, 122, 157-158; LX W; LX X; LX Y). The only matters presented that disputes the foregoing, consists of the extra-judicial statements of respondent's representative, Mr. Watt. The statements appear on pages 11 and 12 of respondent's post-hearing brief submitted by Mr. Watt. Since these statements are not in evidence, were not made under oath and were not subject to cross-examination, they cannot be considered here. Thus, the evidence which established that respondent's employees on the Keesler, AFB job were required to report to work in advance of the 7:30 a.m. official starting time stands unrefut[]ed. The issue as to whether this time is compensable is governed by the interpretation of the portal to portal provision of the Fair Labor Standards Act contained in Steiner v. Mitchell, 350 U.S. 247 (1956). The U.S. Supreme Court said, We, therefore, conclude that activities performed either before or after the regular work shift, on or off the production line, are compensable under the portal to portal provisions of the Fair Labor Standards Act if those activities are an integral and indispensable part of the principal activities for which covered workman are employed and are not specifically excluded by Section 4(a)(1). 350 U.S. at 335. From the evidence the undersigned finds that TSSI's employees on the Keesler, AFB job did begin to work thirty minutes prior to their recorded starting time. The undersigned [11] ~12 [12] further finds that the receiving of instructions, drawing of tools and loading of supplies was an integral and indispensable part of the employees' principal task of installing a fire alarm system, within the meaning of Steiner v. Mitchell. As such the employees should receive compensation for this time. The U.S. Department of Labor, Employment Standards Administration Wage and Hour Division has prepared a Summary of Unpaid Wages (Form WH-56) under the Davis-Bacon Act for both the Atlanta and Keesler, AFB contracts of Tele-Sentry Security, Inc. (LX R p. l; LX D p. 2). The Wage and Hour Division has also prepared a Summary of Unpaid Wages (Form WH-56) under the Contract Work Hour and Safety Standards Act. (LX D p. 3). All of these summary forms were supported by the appropriate Wage Transcription and Computation Sheets (Form WH-55) included in the record of this case. (LX D; LX E; LX F). Although respondent challenged the calculations on earlier WH-55 forms, it did not challenge the calculations in evidence. (TG pp. 78-79, 84-89). The undersigned finds that identity of the affected employees and the amounts owed to them are accurately represented on the summary of Unpaid Wages forms. (LX K p. 1; LX D p. 2; LX D p. 3). ORDER 1. As a result of violations of the Davis-Bacon Act, in performance of Contract Number GS-04-B-81006, the Respondent shall pay its employees unpaid wages as listed below: Employee Gross Amount Due C. Ayers $11,232.01 R. Bowen 7,999.55 W. Bruxton 507.28 R. Charles 1,436.92 M. Fauble 3,760.03 E. Finney 1,355.13 R. Heeter 734.93 D. Hewitt 13,361.30 B. Karr 2,160.07 B. Knotts 874.74 D. Robinson 2,871.59 K. Street 9,022.20 2. As a result of violations of both the Davis-Bacon Act, and the Contract Work Hour[s] and Safety Standards Act in performance of Contract Number F22600-81-C0028 the Respondent shall pay its employees for unpaid wages as listed below: [12] ~13 [13] Employee Gross Amount Due J. Auld $4,374.24 E. Blair 5,405.44 A. Brady 1,271.76 W. Brady 4,624.86 R. Burton 5,130.55 T. Hammack 1,147.34 D. Larimar 6,604.02 J. Pineau 326.88 J. Smith 3,284.51 QUENTIN P. McCOLGIN Administrative Law Judge Dated: [] Metairie, Louisiana QPMC:ea E/24 [13]



Phone Numbers