This plan is from the FIPS PUB 101, June 1983, Guideline for Life cycle Validation, Verification, and Testing of Computer Software.
1.0 BACKGROUND AND INTRODUCTION
This section establishes the context for the V&V document. It is brief and introductory in nature. It focuses on those aspects of the problem and/or solution which influence the V&V needs and approach.
1.1 Statement of problem
Describe the problem in concise terms..
1.2 Proposed solution
Describe the proposed solution which influences the V&V needs and approach.
1.3 References/related documents
List all documents referenced in the plan or that impact the V&V effort. For selected significant documents, briefly describe how the referenced document impacts the V&V effort.
2.0 V&V REQUIREMENTS AND MEASUREMENT CRITERIA
This section presents the V&V requirements in one of several formats: the total V&V requirements, with all worksheets and phase information; a summary of requirements information; and a statement of project level information, with phase data presented later.
2.1 V&V Requirements and their Importance
Briefly describe the functional, performance, reliability or other requirements and why they are important to this system or subsystem.
2.2 Measurement Criteria for each Requirement
Briefly describe general, product specific or phase specific measurement criteria for the above requirements.
2.3 References/related documents
List any documents that the above might be referenced in (if a large document). These could be the SBD, CBA, Feasibility Study, etc.
3.0 PHASE BY PHASE V&V PLANS
First, describe the V&V approach by phases, products, major reviews and checkpoints, and practices common to all phases. Then present the specific activities to be carried out phase by phase.
3.1 Project Background and Summary Information
• Project Phases
and products
• Major reviews (both
management and technical)
3.2 Planning phase V&V Activities
For each phase, list the following information.
• V&V activities
• V&V techniques
and tools selected
° reviews
°
methods of analysis
• Required support
tools, automated & other
• Roles and responsibilities
• Schedules
• Budgets
• Personnel
3.3 Requirements Analysis Phase
3.4 Design Phase
3.5 Development Phase
3.6 Integration and Test Phase
3.7 Implementation Phase
3.8 Operations and Maintenance Phase
Appendix A Project and Environmental Considerations
A. Technical
Issues
B. Project
Constraints
C. Computing
Resources
Appendix B Technique and Tool Selection Information
A. Candidate
list of techniques and tools
B. Rationale
for selection of techniques and tools
VERIFICATION AND VALIDATION PLAN OUTLINE
Cover Page
Table of Contents
1.0 BACKGROUND AND INTRODUCTION
1.1 Statement
of Problem
1.2 Proposed
Solution
1.3 References/Related
Documents
2.0 V&V REQUIREMENTS
AND MEASUREMENT CRITERIA
2.1 V&V
Requirements and Their Importance
2.2 Measurement
Criteria for Each Requirement
2.3 References/Related
Documents
3.0 PHASE BY PHASE V&V
PLANS
3.1 Project
Background and Summary Information
3.2 Planning
Phase V&V Activities
3.3 Requirements
Analysis Phase
3.4 Design
Phase
3.5 Development
Phase
3.6 Integration
and Test Phase
3.7 Implementation
Phase
3.8 Operations
and Maintenance Phase
Appendix A Project and Environment Considerations
Appendix B Technique and Tool Selection Information