Text Size: A+| A-| A   |   Text Only Site   |   Accessibility
ODOT banner
Constructability Reviews
Overview
 
ODOT has a Constructability Review process to review selected design projects as a method to improve the overall quality and cost effectiveness of construction projects.  The reviewers include both internal staff and external members of the contracting community.
 
 
Staff
Tracy M. Harris
Value Engineer
503-986-3727
 

Constructability Reviews
 
Constructability Reviews (pdf)
Frequently Asked Questions (pdf)
Constructability Review – Model Agenda (pdf)
2006 Annual Constructability Report (pdf)
 

Pre-Construction Reviews
 
Pre-Construction Review Process  (pdf)
Request for External Constructability Review  (doc)
 

Post-Construction Reviews
 
Post-Construction Review Process  (pdf)
 

Constructability Review Dates
 
If you are interested in participating in a constructability review, select a project from the table below.
 

 Project Name  Constructability Review Date(s)
US 101: Millport Slough Bridge
May 9, 2008
US 97: Modoc Point to N. Shady Pine, Phase 2, Unit A
July 21, 2008
OR 6: Wilson River (Mills) - US 26 Conn @ I-405 (D-B) Bundle 507
 
Project Information
July 24, 2008

Associated General Contractors
 
Link to AGC Website
 

 
Page updated: July 22, 2008

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.