[Federal Register: April 4, 2001 (Volume 66, Number 65)]
[Rules and Regulations]               
[Page 17810-17811]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr04ap01-10]                         

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 117

[CGD01-01-040]

 
Drawbridge Operation Regulations: Hutchinson River, (Eastchester 
Creek), NY

AGENCY: Coast Guard, DOT.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the drawbridge operation regulations governing 
the operation of the South Fulton Avenue Bridge, at mile 2.9, across 
the Eastchester Creek in Mount Vernon, New York. This deviation allows 
the bridge owner to need not open the bridge for vessel traffic for 
five successive weeks, 8 a.m., on Monday through 4:30 p.m., on 
Thursday, beginning Monday, April 16, 2001 through Thursday, May 17, 
2001. This action is necessary to facilitate necessary maintenance at 
the bridge.

DATES: This deviation is effective from April 16, 2001 through May 17, 
2001.

FOR FURTHER INFORMATION CONTACT: Mr. Joseph Schmied, Project Officer, 
First Coast Guard District, at (212) 668-7195.

SUPPLEMENTARY INFORMATION: The South Fulton Avenue Bridge, at mile 2.9, 
across the Eastchester Creek has a vertical clearance of 6 feet at mean 
high water and 13 feet at mean low water in the closed position. The 
existing drawbridge operation regulations are listed at 33 CFR 
117.793(c).
    The bridge owner, Westchester County Department of Public Works, 
requested a temporary deviation from the operating regulations to 
facilitate scheduled maintenance at the bridge.
    Vessels that can pass under the bridge without an opening may do so 
at all times during the closed period.
    In accordance with 33 CFR 117.35(c), this work will be performed 
with all due speed in order to return the bridge to normal operation as 
soon as possible. This deviation from the operating

[[Page 17811]]

regulations is authorized under 33 CFR 117.35.

    Dated: March 26, 2001.
G.N. Naccara,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 01-8184 Filed 4-3-01; 8:45 am]
BILLING CODE 4910-15-U