PIRATA
Home
Station
Plots
Data Display &
Delivery
Technical
Information
Meeting
Reports
Sensor
Status
Cruises



PIRATA Cruises

PIRATA Status

22-May-2008

Dates (in julian days) in the sensor fields are the failure dates for the sensor. Blank field indicates sensors are reporting good data. "X" indicates no sensor at that depth. "NT" indicates sensor at that depth is not telemetered in real time. Gray field indicates a mooring site not presently occupied. "% Good" refers to the percentage of all deployed sensors on a particular mooring that are working at the present time. Comments on each of the moorings are listed after the summary of current deployments.


Summary of current deployments:

Buoy# PM-679 PM-734 PM-735 PM-659 PM-662 PM-649 PM-638 PM-639 PM-643 PM-676 PM-674 PM-672 PM-680 PM-682 PM-686 PM-685 PM-684
Name   Reggae Forro Lambada Frevo Samba
SW Extension
SW Extension
SW Extension
NE Extension NE Extension NE Extension Jazz Java Valse Gavotte Soul
Site 20N-
38W
15N-38W 12N-38W 8N-38W 4N-38W 0-35W 19S-34W 14S-32W 8S-30W 21N-
23W
12N-23W 4N-23W 0-23W 0-10W 6S-10W 10S-10W 0-0
Date Depl 2007/142 2008/093 2008/094 2006/332 2006/339 2006/316 2006/308 2006/311 2006/313 2007/138 2007/134 2007/131 2007/145 2007/150 2007/179 2007/177 2007/173
Stopped xmitting 2008/140
Wind            
2007/113

2007/323     2008/029        
Rain 2007/142   2008/095 2008/010 2007/121 2007/136


intermittent   2007/150       2007/177 2007/352
Rad            


      2008/029        
Air           2006/344


               
RH           2006/344


               
SST       intermittent   intermittent


intermittent intermittent intermittent          
SSC 2007/154     2007/084 2007/215 intermittent


2007/313 2007/159 2007/203         2007/229
T20           intermittent
intermittent
2006/313
  intermittent   2007/145        
C20       2007/360   intermittent

2006/313
  intermittent   2007/145        
T40       intermittent intermittent intermittent

intermittent
  06/159   intermittent        
C40       intermittent intermittent intermittent

intermittent
  06/159   intermittent        
T60     intermittent intermittent   intermittent intermittent


      intermittent        
T80       intermittent   intermittent 2006/308


  intermittent   intermittent        
T100     intermittent intermittent   intermittent


  intermittent   intermittent        
T120       intermittent   intermittent intermittent


  intermittent   intermittent       intermittent
C120       intermittent   intermittent intermittent


  intermittent   intermittent       intermittent
T140       intermittent   intermittent         intermittent   intermittent        
T180       intermittent   intermittent
 
  intermittent   intermittent        
TP300       intermittent   intermittent 2006/308


  intermittent   intermittent       intermittent
TP500       intermittent   intermittent intermittent


  intermittent   intermittent        
 

History of PIRATA sites
----------------------------
20N-38W
PM-679A - Deployed 2007/142 -
Rain, SSC, V10 failed

---------------------------------Brazilian----------------------------------------------------------
15N-38W
PM-036A - Deployed 1998/027 - 1999/036. Modules SSC, TP300 (intermittant), RH/AT 0.
PM-073A - Deployed 1999/036 - 2000/074 SSC biased Subsurface data intermittant
PM-136A - Deployed 2000/075 - 2001/105. Winds anomalous w/clim adj sites since depl. Subsurface temps intermittantly 0
PM-203A - Deployed 2001/105 - 2002/094. 40m cond reads high
PM-280A - Deployed 2002/095 - 2003/198 Rain and SSC failed. AT and RH read high. Subsurface 0,T60 intermittant. Rec notes: 20m and 140m modules missing. Top section unbolted.
PM380A - Deployed 2003/198- 2004/214. 40m cond reads low. Rain failed. T60 shows persistant temp inversion. T80, T100, TP500, TP300 0
PM455A - Deployed 2004/214 - 2005/200. Subsurface intermittently 0. Rec Notes: SSC missing, wind base broken and wind direction not reliable. SWR dusty
PM531A - Deployed 2005/200 - 2006/334 Subsurf intermittant below SSC. Subsurf mostly ok after 12 days of missing data; T180 and TP300 intermittent. Rec Notes: T180 lost.
PM660A - Deployed 2006/334 - 2008/093. Flux enhanced site. V10 failed, rain noisy (failed), wind anomalous. Some subsurf intermittant sensors
PM734A - Deployed 2008/093 -.

12N-38W
PM-070A - Deployed 1999/034 - 2000/076 SSC failed, T100, T120 failed
PM-137A - Deployed 2000/076 - 2001/006 Buoy went adrift and was recovered by RV Sonne. Wire had parted below 500m, all subsurface modules were recovered.
PM-204A - Deployed 2001/106 - 2002/096. Winds and C20 failed
PM-281A - Deployed 2002/097- 2003/199. SSC/SST failed, C 20 failed. Subsurface intermittantly 0. Rec Notes: Fishing line around 20m module.
PM381A - Deployed 2003/199- 2004/214. Rain and RH failed, wind failed.T80, T100 0
PM457A - Deployed 2004/215 - 2005/198 SSC failed, wind failed Rec Notes: 100m and 120m modules missing. Anemometer mounted 180 off
PM529A - Deployed 2005/198 - 2006/336. RH failed, SSC (cond failed) T80 intermittent, rain failed. Rec Notes: T20 and T80 missing, fishing line @ 40m
PM661A - Deployed 2006/336 - 2007/127. Rain and C40 failed. Swapped rain gauge and tube on PI1-07-RB. No sign of vandalism.
PM661B- Deployed 2007/127 - 2008/094 Rain failed, TC 120 intermitent
PM735A- Deployed 2008/094. Rain failed

8N-38W
PM-037A - Deployed 1998/030 - 1999/039. Modules SSC (intermittent), T80, t120 failed (T120 LOST)
PM-074A - Deployed 1999/039 - 2000/078 Radiation failed (FFFF) Wind U/V vane -> 0 * Transmitting on failsafe ID as of 1999/242, no data*
PM-138A - Deployed 2000/078 - 2001/108
PM-205A - Deployed 2001/108 - 2002/099. Winds and C40m failed
PM-282A - Deployed 2002/187 - 2003/201. SST and SSC failed. All subsurface 0 2003/003. Rec Notes: All modules recovered.
PM-383A - Deployed 2003/201 - 2004/216. SSC failed, Wind failed
PM-459A - Deployed 2004/217- 2005/202 Rain, SSC failed Rec Notes: Some fish gear @60m but all recovered
PM-533A - Deployed 2005/203 - 2006/331 Subsurf intermittently 0 2005/344. Rec Notes: SSC unplugged, fishing line throughout 1st reel of nylon. Gash in nilspin @ 40m
PM659A - Deployed 2006/332 . SSC failed, C20 failed, subsurf below 40m int.

4N-38W
PM-076A - Deployed 1999/051 - *. Modules T180, TP300 failed. TC40 0 first 9 days of depl. * Stopped transmitting 1999/173. ATRH failed 2 hours prior to last transmissions, indicating possible vandalism. MOORING LOST AT SEA
PM-139A - Deployed 2000/080 - 2001/119. AT reads high (failed). T60 and T100 0.
PM-207A - Deployed 2001/111 - 2002/101 C40m failed
PM-283A - Deployed 2002/101 - 2003/203. Winds, SWR, rain failed; Subsurface 0. Rec Notes: Heavily fished: wind SWR, T20, T40, T80 missing. Rain gauge damaged.
PM384A - Deployed 2003/203 - 2004/218. C40 failed. TP500 intermittent
PM461A - Deployed 2004/219 - 2005/218. SSC failed Rec Notes: SSC cable not connected, TC 40, TC120, T180 lost.
PM541A - Deployed 2005/218 - 2006/338. Subsurf T60-500 intermittently 0 2005/240. Rain failed. Rec Notes: T120m lost, cut in nilspin 2m below buoy. Fishing gear 50m - 80m.
PM662A - Deployed 2006/339 Rain failed, SSC failed, TC 40 intermittent

0-35W

PM-035A - Deployed 1998/021 - 1999/054. Modules T40, TP500, SSC failed
PM-077A - Deployed 1999/054 - 2000/088.Wind U/V Vane ->0. Rain reads anomalously high
PM-077B 1999/204. Rain gauge was replaced by French R/V THALASSA AT failed (reads high)
PM-140A - Deployed 2000/088 - 2001/122. SSC/SST and T180 read 0. Nylon parted in 4th reel during recovery (fish bite?), and 2.5 reels of nylon plus acoustic release were lost.
PM-212A - Deployed 2001/122- 2002/103. SSC and TC 20m failed
PM-284A - Deployed 2002/104- 2003/213. Rain and all subsurf failed. Rec Notes: Top section disconnected, fishing line around 20m module, 40m module missing.
PM-389A - Deployed 2003/213- 2004/230. Rain and SST/C failed.
PM-464A - Deployed 2004/231 - 2005/188. SSC failed and subsurf int 0 Rec Notes: Wind base broken and winds unreliable, SSC and T40 missing
PM-527A - Deployed 2005/188 - 2005/216 Rain gauge bumped ship during depl and rain data questionable. SST/C intermittent, T80 intermittent
PM-527B - Deployed 2005/216 - 2005/229 Swapped rain gauge but data still bad. ATRH bad
PM527C - Deployed 2005/229 - 2006/316 Swapped ATRH. Subsurf intermittent. Rec Notes: Fishing hawser tied to buoy, fishing line throughout nylon, wire rope cut to core at 2m. SSC, T20m, T40m, T60m, T80m missing
PM649A
- Deployed 2006/316 - 2006/328. Buoy was not anchored. Rec Notes: Nylon was broken 40m into 1st reel. Buoy had drifted ~35nm from depl position
PM649B - Deployed 2006/328 - Redeployed mooring with same sensors. ATand RH failed, rain failed, all subsurf intermittent

19S-34W
PM-544A - Deployed 2005/243 - 2006/308. Buoy was accidentally deployed upside down. Rec Notes: TC 20m missing. Fishing gear in nylon and around TC20m mount.
PM638A - Deployed 2006/308. T80 and TP300 0 at anchor drop.T60, TC 120, TP 500 intermittent

14S-32W
PM-543 - Deployed 2005/235 - 2006/310.
PM-639 - Deployed 2006/311 Wind anomalous, TC 20

8S-30W
PM-542A - Deployed 2005/232 - 2006/179. Adrift 2006/158. Recovered by Amorim D Valle.
PM-643A - Deployed 2006/313. T20 0 at anchor drop, TC 40 intermittent

____________________NE Extension______________________________________________________________

21N 23W
PM676A - Deployed 2007/138 -
SSC and C10 failed, wind failed, SST and rain intermittent.

12N 23W

PM-595A - Deployed 2006/159. TC40 0 since depl
PM674A - Deployed 2007/134 TC20 0 since depl. SSC failed, LWR failed for 70 days but ok later; most subsurf intermittent

4N 23W
PM-598A - Deployed 2006/162.
PM-672A - Deployed 2007/131. Rain failed, V10 failed, SSC failed
--------------------------------------French-----------------------------------------------------------------------------------------------------------------

0-23W

PM-078A - Deployed 1999/065-2000/055 Wind SP 0, Co/Va ok.
PM-078B - 1999/216 - Anemometer was replaced by French R/V THALASSA, vane 0
PM-128A - Deployed 2000/055-2001/125. SSC/SST, TC20, TC40, T60, T80, T100, TC120 intermittently 0 REC NOTES: - 20m, 40m, 120m, 180m modules missing. Lots of longline 20-60m.
PM-213A - Deployed 2001/126-2001/348. 80m and 100m modules failed at depl.
PM-271A - Deployed 2001/348-2002/354. T120 and TC20 failed. Rec Notes: 20m and 60m modules missing. SSC was heavily fouled and pucks were missing.
PM-345A - Deployed 2002/355. T20, T60, T80, T100, T120m, T140m,TP300, TP 500 0. Rain FFFF. Rec Notes: Many modules missing, cuts in nilspin due to hooks or sharks.
PM-425A - Deployed 2004/044- 2005/148. Wind failed. Rec Notes: wind sensor broken, buoy and rain sensor hurt, fishing lines.
PM-514A - Deployed 2005/149- 2006/164. Rain failed, TC 10 intermittent Rec Notes: Wind sensor broken off, top of rain gauge missing, rad mount bent (sensor cockeyed) and rad plate bent. Mast held by one bolt and flopping. Remarkably dry inside tophat. Top antifoul on SSC gone, 10m TC gone, Sontek fin broken off, longline down to that point, core cut in nilspin at Sontek, 13.3m TV broken out of mount, 20m TC poison gone, 60m TC missing one antifoul, 120m TC out of mount.
PM-599A - Deployed 2006/164.
PM-680A - Deployed 2007/145. Wind and SWR failed at same time, subsurface intermittent



0-10W

PM-031 - Deployed 1997/257 - *. Modules SSC, T100 failed; Wind VA/Sp 0, stopped xmitting,*MOORING LOST
PM-068 - Deployed 1999/028 - 2000/071. Module TP 500 failed, Wind speed 0, Rain FFFF
PM-068B - 1999/228. Anemometer, rain gauge, ATRH replaced by French R/V Thalassa. Wind vane 0
PM-068C - 1999/306. Swapped anemometer and rain gauge. Most subsurface data intermittantly 0
PM-134 - Deployed 2000/071 - 2000/328. Wind SP and VA 0 14 June 2000.
PM134B - 2000/213. Swapped anemometer and rain gauge.

PM-187 - Deployed 2000/328 - *. BUOY ADRIFT AND TRANSMITTING BAD CHECKSUMS 3 JAN 2001. Stopped transmitting 18 Jan 2001. Lost at sea
PM-251 - Deployed 2001/307
. 40m cond failed after depl. Stopped transmitting 24 Jan 2002. Lost at sea Rec Notes: Release responded and was horizontal on bottom.(2002/363)
PM-348 Deployed 2002/363 - 2004/035. Wind, SWR, and SSC failed. Many intermittent subsurf modules. Rec Notes: Anemometer and SWR missing, fishing line along subsurf cable.
PM-422A - Deployed 2004/035- * Stopped transmitting 8 May 2004, no sign of failure beforehand. MOORING LOST
PM-521A - Deployed 2005/170 - Buoy adrift starting 3 Feb 2006. Buoy (tube and met sensors) was found ashore in Ghana.
PM-591A - Deployed 2006/153 - 2007/ 149. Wind and SWR failed at same time.
Rec Notes: Mast broken, SWR plate twisted, long line betw 20-40m"
PM-682A - Deployed 2007/150 - 2008/025. SWR failed whole depl. US Navy SWIFT swapped SWR, previous SWR missing and hawser tied to buoy.
PM-682B - Deployed 2008/025 -

5S-10W
->6S 10W
PM-067 - Deployed 1999/027 - 2000/073. Wind speed 0, rain failed, modules T100, C40 failed
PM67B - 1999/225. Anemometer repl by French R/V Thalassa. Vane 0
PM67C - 1999/304. Tube, anemometer, air/RH, rain replaced.
6S10W
PM-135 - Deployed 2000/074 - 2000/330 Site changed to 6S10W. Top 3 modules covered with barnacles, no vandalism.
PM-188 - Deployed 2000/331-2001/309. Rec Notes: 20m module lost. Crack in buoy. Longline from 300-500m
PM-253 - Deployed 2001/309-2002/361. Winds failed, SWR failed. Rec Notes: Anemometer had been broken off. Heavy barnacle fouling on buoy and to 60m. Longline gear from 300m- 500m.
PM-347 - Deployed 2002/361 - 2004/038. Winds failed 2003/060 (speed and vane 0). SSC, 40m, 120m cond failed.Rec Notes: Anemometer missing. Fishing line wound around cable to 600m. Nilspin partially cut at 180m by hook
PM-423A - Deployed 2004/038 - 2005/167 SSC, C40 failed. Rec Notes: Fishing line along cable
PM-518A - Deployed 2005/167 - 2006/157 C120 bad Stopped transmitting 18 Sep 2005. Some bad checksums occasionally transmit, but no data or positions (buoy is probably vandalized) Rec Notes: Vandalized: Wind missing, rain damaged, SWR missing, tube damaged.
PM-593A - Deployed 2006/157-2007/179. SSC failed. Rec Notes: Fishing line 50-100m
PM-686A - Deployed 2007/179


10S-10W

PM-030 - Deployed 1997/253 - 1998/308. Modules SSC, T60, T100, TP500 all failed
PM-063 - Deployed 1998/308 -1999/303. Module T20 ~.1c bias. SSC, C40 failed
PM-109 - Deployed 1999/304 - 2000/332.SST 0. WSPD/VA 0. Rain noisy (bad) for whole depl. Rec notes: There was a fishing line attached to the surface buoy deployment line, wind sensor was missing, rain gauge damaged, rad shield slightly bent. Extensive fishing gear on wire to 80m. T1 module was missing
PM-189 - Deployed 2000/332 - 2001/310. Major tube failure, probably because of tube software bug in vers 2.23. Stopped transmitting 7 Apr 2001
. Recovered Nov 2001
PM-255 - Deployed 2001/311-2002/359. Subsurface all 0 2001/329. Rec notes: Top section was ripped apart at connection. One flange was missing, and there was a crack and lots of corrosion in top section.
PM-346 - Deployed 2002/360 - 2004/039. SSC failed. Rec Notes: All ok
PM-424 - Deployed 2004/040 - 2005/165 . SWR failed, SSC failed. Rec Notes: no problems noted
PM-516A - Deployed 2005/165 - 2005/252 SWR and wind failed at depl. C10 and C120 failed, AT and RH failed TV13 failed.
PM516B - Deployed 2005/252 - 2006/160. Swapped ATRH, Wind, and SWR. V10 failed since depl. Rec Notes: Nothing to notice.
PM597A - Deployed 2006/160 - 2007/177 SWR failed. Anemometer broken during recovery
PM-685A - Deployed 2007/177. Rain failed, C10 0 since depl



0-0
PM-038 - Deployed 1998/032 - *. Modules T20, T80, T120, T140, TP 300 failed. Wind Sp 0, RH failed. Stopped xmitting after weeks of bad xmissions. *MOORING LOST, release on site.
PM-066 - Deployed 1998/312 -1999/012 Anemometer missing, radiometer missing, rain gauge damaged, subsurface cable cut -> buoy adrift. RECOVERED SURFACE MOORING ONLY (Tuna boat "VIA HARMATTAN")
PM-160 - Deployed 2000/221- 2001/342. T100 0. Rain FFFF and wind 0.
PM-270 - Deployed 2001/342. Adrift 2002/038. All subsurface, wind, rain 0. Tube and some surface instr found by Nigerian scientists in Brass, Nigeria (had been taken by fishing boat).
PM-349 - Deployed 2003/001-2004/031. SSC reads low. Rec Notes: Numerous fishing lines on buoy.
PM-421 - Deployed 2004/032 -* TC20, TC40, T60, TP300 read 0. Wind dir shifted 19 Apr 2004 and is ~180 deg anomalous w/clim and historical data. RH failed and then mooring stopped transmitting 2004/139, MOORING LOST.
PM-515A -
Deployed, 2005/161- 2006/148. ATRH failed Rec Notes: - Buoy in good shape
PM-590A - Deployed, 2006/ 148 - 2007/173. SWR and rain failed.
PM-684A - Deployed 2007/173-2007/254. Wind and SWR failed, SSC failed, TP 300 intermittent. Swapped Wind and SWR
PM-684B - Deployed 2007/254 - Rain failed
. Wind, AT, and SWR failed. Mooring stopped transmitting 08/140.

--------------------------------Historical---------------------------------------------
6S 8E
PM-605 - Deployed 2006/178 - 2007/161. Rec Notes:
"TV 13793 lost, AT/RH 34279 broken, PTT not working. Ac.release 022180 did not work after many tries. Had to secure red nilspin to vessel to break nylon while vessel moving slowly. Very hard tension applied to mooring (especailly nylons) Recovered all sensors, and Ac.release as well."

2N-10W
PM-111 - Deployed 1999/307 - 2000/027. Wind SP 0, co/va ok. Mooring picked up by tuna boat 2000/027. All lost below surface
PM-133 - Deployed 2000/070 -2000/212. Wind SP 0, co/va ok 2000/126 Stopped transmitting on 16 June. Recovered toroid and subsurface sensors, but no tower or surface instrumentation. Site no longer occupied.

2S-10W
PM-110 - Deployed 1999/306 - 2000/072. Cond 20m and 120m failed, T100 failed. Buoy adrift, RECOVERED SURFACE MOORING ONLY.Site no longer occupied



Key:
---
YR/DAY = Year/julian day
SP = Wind Speed
VA = Wind Vane
CO = Compass
RH = Relative Humidity
SST = Sea Surface Temperature
SSC = Sea Surface Conductivity
RAD = Radiation
T'n' = Temperature module and depth of module
TC'n' = Temperature/conductivity module and depth of module
TP'n' = Temperature/pressure module and depth of module
PM'nnn' = Internal PMEL buoy designator code


2008 PIRATA Cruise Schedule

DATES SHIP (COUNTRY) PORTS SITES R/D/S
27 Feb - 13 Mar
18 Mar - 28 Mar
2 Apr - 12 Apr
Antares (Brazil) Natal - Fortaleza
Fortaleza - Natal
Natal - Salvador
38W, 0-35W.
8S-30W,
14S-32W
19S-34W
8/8/0
14 Apr - 16 May Brown (USA) Montevideo, Uruguay - Bridgetown , Barbados NE Ext, 0-23W 5/5/0
Aug - Sep Antea (France) Cotonou, Benin - Cotonou, Benin 10W, 0-0 4/4/0


2007 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
2 May - 31 May
Brown (USA)
Bridgetown, Barbados - Ft Lauderdale, FL
23W, 20-38W
2/4/1

19 May - 2 Jun
3 Jun - 1 Jul

Antea (French)
Dakar, Senegal - Cotonou, Benin
0-23W, 0-10W, 0-0;
6S-10W, 10S-10W, 6S-8E
6/5/0


2006 PIRATA Cruise Schedule

DATES SHIP (COUNTRY) PORTS SITES R/D/S
26 May - 17 Jun
19 Jun - 6 Jul

Atalante (French)
Cotonou, Benin - Cotonou, Benin 0-0, 10W, 8E 3/5/0

27 May - 18 Jun

Brown (USA) San Juan, Puerto Rico - Recife, Brazil
23W
1/3/0
31 Oct - 14 Nov
21 Nov- 8 Dec
Antares (Brazil)

Salvador - Fortaleza
Fortaleza - Natal

38W, 0-35W.
8S-30W,
14S-32W
19S-34W
7/8/0

2005 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
24 May - 4 Jun
8 Jun - 22 Jun
Suroit (French) Dakar, Senegal - Lome, Togo
Lome, Togo - Lome, Togo
0-0, 10W, 23W 5/5/0

5 Jul - 9 Jul
13 Jun - 26 Jul

Antares (Brazil) Natal - Fortaleza
Fortaleza - Natal
38W, 0-35W 5/5/0
2 Aug - 10 Aug
16 Aug- 25 Aug
28 Aug - 2 Sep
Antares/Amorim do Valle (Brazil)

Natal - Natal
Natal - Salvador
Salvador - Vitoria

8S-30W,
14S-32W
19S-34W
0/3/0
1 Sep - 12 Sep 2005 Suroit (French)   10S-10W 0/0/1


2004 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
28 Jan - 17 Feb Atalante (French) Port Gentil - Cayenne 0-0, 10W, 23W 5/5/0
26 Jul - 19 Aug Antares (Brazil) Fortaleza - Fortaleza 38W, 0-35W 5/5/0

2003 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S

10 Jul - 25 Jul
30 Jul - 6 Aug

Antares (Brazil) Fortaleza - Fortaleza 38W, 0-35W 5/5/0

2002 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
28 Mar - 17 Apr Antares (Brazil) Fortaleza - Fortaleza 38W, 0-35W 5/5/0
17 Dec - 03 Jan 03 Suroit (France) Senegal - Togo 10W, 23W 3/5/0

2001 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
09 Apr - 26 Apr Antares (Brazil) Fortaleza-Fortaleza 38W 3/4/0
30 Apr - 10 May Antares (Brazil) Fortaleza - Natal 0-35W, 0-23W 2/2/0
29 Oct - 11 Nov Atalante (France) Dakar - Port Gentil 10W 3/3/0
06 Dec - 23 Dec Atalante (France) Port Gentil - Martinique 023W, 00 2/2/0

2000 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
19 Feb-02 Mar ANTARES (BR) Fortaleza-Fortaleza 0-23W 1/1/0
09 Mar-22 Mar ANTARES (BR) Fortaleza-Natal 15N38W,11N38W,8N38W,4N38W 3/4/0
26 Mar-30 Apr ANTARES (BR) Natal-Natal 0-35W 1/1/0
08 Mar-19 Mar LE SUROIT (FR) Abidjan-Port Gentil 5S-10W,6S-10W,010W,2N10W 2/3/0
24 Jul-22 Aug THALASSA (FR) Abidjan-Abidjan 10W 1/1/1
15 Nov-01 Dec ATALANTE (FR) Dakar-Port Gentil 10W 3/3/0

1999 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
23 Jan-01 Feb ANTEA (FR) Abidjan-Abidjan 0-6S,0-10W 0/2/0
29 Jan-11 Feb ANTARES (BR) Fortaleza-Fortaleza 12N-38W,15N-38W,8N-38W 2/3/0
17 Feb-25 Feb ANTARES (BR) Fortaleza-Natal 4N-38W, 0-35W 1/2/0
02 Mar-12 Mar ANTARES (BR) Natal-Fortaleza 0-23W 0/1/0
CANCELLED ANTEA (FR) Abidjan-Abidjan 0-0,2N-10W,2S-10W 0/3/0
25 Oct-5 Nov ANTEA (FR) Abidjan-Abidjan 10S-10W,5S-10W,2S-10W,0-10W, 2N-10W 1/3/2

1998 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
19 Jan 98-03 Feb 98 ANTARES (BR) Fortaleza-Natal 15N-38W,8N-38W,0-35W 0/3/0
30 Jan 98-03 Feb 98 ANTEA (FR) Abidjan-Abidjan 0-0 0/1/0
27 Oct 98-11 Nov 98 ANTEA (FR) Abidjan-Abidjan 10S-10W,0-0 1/2/0

1997 PIRATA Cruise Schedule
DATES SHIP (COUNTRY) PORTS SITES R/D/S
05 Sep 97-15 Sep 97 ANTEA (FR) Abidjan-Abidjan 10S-10W,0-10W 0/2/0

Key: R/D/S = #Recoveries/#Deployments/#Sensor Swaps

TAO Project Office
NOAA
| Pacific Marine Environmental Laboratory
7600 Sand Point Way NE
Seattle, WA 981
15
atlasrt@noaa.gov
Credits | Disclaimer | Privacy Policy