Cost Projections
- Productivity loss (3 months, 15% of payroll) - Huge Amount!
- Interface costs (building bridge between systems)
- Subscription/Usage fees to Exchange
Do not include: EMR installation/maintenance
Image of a building with a sign that reads " Chimney Rock Medical Center"
Previous Slide Contents Next Slide ![Next Slide](https://webarchive.library.unt.edu/eot2008/20080925013805im_/http://www.ahrq.gov/images/arrow_rt.gif)