NTL
Number |
Effective
Date |
Title |
2008-G17 |
September 16, 2008 |
Incident and Oil Spill Reports |
2008-G16 |
September 11, 2008 |
Damage Caused by Hurricane Gustav |
2008-G15 |
September 12, 2008 |
Departure for Meter Provings, Meter Calibrations, and Well Tests Due to
Force Majeure Events |
2008-G13 |
July 9, 2008 |
Electronically Stored Records |
2008-G12 |
June 1, 2008 |
Drilling Windows, Eastern Gulf of Mexico |
2008-G11 |
May 21, 2008 |
Interim Guidelines for Tie-downs on OCS Production
Platforms for the 2008 Hurricane Season |
2008-G10 |
June 1, 2008 |
Guidelines for Jack-up Drilling Rig Fitness
Requirements for Hurricane Season |
2008-G09 |
June 1, 2008 |
Guidelines for Moored Drilling
Rig Fitness Requirements for Hurricane Season
|
2008-N08 |
September 13, 2008 |
Outage of Pay.Gov due to Fiscal Year-end Closeout |
2008-G08 |
May 19, 2008 |
Hurricane and Tropical Storm Effects Reports |
2008-N07 |
August 28, 2008 |
Supplemental Bond Procedures |
2008-G07 |
June 15, 2008 |
Managed Pressure Drilling Projects |
2008-G06 |
May 26, 2008 |
Remotely Operated Vehicle Surveys in Deepwater |
2008-N05 |
August 26, 2008 |
Guidelines for Oil Spill Financial Responsibility (OSFR)
for Covered Facilities |
2008-G05 |
May 1, 2008 |
Shallow Hazards Program |
2008-G04 |
May 1, 2008 |
Information Requirements for Exploration Plans and
Development Operations Coordination Documents |
2008-N03 |
March 31, 2008 |
Well Control and Production Safety Training
|
2008-G03 |
April 14, 2008 |
Pollution Inspection Intervals for Unmanned Facilities
|
2008-N04 |
March 12, 2008 |
Performance Measures for OCS Operators and Form
MMS-131 |
2008-G01 |
February 28, 2008 |
Suspensions of Operations Based on Rig Delays, Lack of Rig Availability and Procurement of Long Lead Equipment
|
2008-N02 |
March 1, 2008 |
Outer Continental Shelf (OCS) Inspection Program |
2007-G27 |
October 1, 2007 |
Assessment of Existing OCS Platforms and Related
Structures for Hurricane Conditions |
2007-G26 |
December 15, 2007 |
Design of New OCS Platforms and Related Structures
for Hurricane Conditions |
2007-G25 |
September 24, 2007 |
2008 Gulfwide OCS Emissions Inventory (Western Gulf of Mexico) |
2007-G24 |
September 24, 2007 |
Changes to the Designation of Operators of an OCS Oil and Gas or Sulfur Lease |
2007-G22 |
June 25, 2007 |
Suspensions of Operations for Subsalt and Ultradeep Geophysical Work |
2007-G21 |
June 1, 2007 |
Conservation
Information Documents |
2007-G20 |
May 25, 2007 |
Coastal Zone Management Program Requirements
for OCS Right-of-way Pipeline Applications |
2007-G15 |
May 14, 2007 |
eWell Permitting and
Reporting System |
2007-G14 |
May 7, 2007 |
Pipeline Risers
Subject to the Platform Verification Program |
2007-G12 |
April 4, 2007 |
Contact with District
Offices and the Pipeline Section Outside Regular Work Hours |
2007-G11 |
April 4, 2007 |
Guidance for Submitting
Exploration Plans and Development Operations Coordination Documents |
2007-G09 |
April 3, 2007 |
Air Emissions Information
for Applications for Accessory Platforms for Pipeline Rights-of-way |
2007-G08 |
April 2, 2007 |
Using a Motion Compensator when
Conducting Coiled Tubing Operations on a Floating Production Platform |
2007-G07 |
April 2, 2007 |
High Pressure and High Temperature Completions and Workovers |
2007-G05 |
March 1, 2007 |
Well Producibility Determinations |
2007-N04
|
September 26, 2007 |
Oil Discharge Written Follow-up Reports |
2007-G04 |
February 7, 2007 |
Vessel Strike
Avoidance and Injured/Dead Protected Species Reporting |
2007-G03 |
February 7, 2007 |
Marine Trash and
Debris Awareness and Elimination |
2007-N02 |
March 30, 2007 |
Revised Assessment Matrix |
2007-G02 |
February 7, 2007 |
Implementation of
Seismic Survey Mitigation Measures and Protected Species Observer Program |
2006-G21 |
October 26, 2006 |
Regional and Subregional Oil Spill
Response Plans |
2006-G20 |
October 25, 2006 |
Mudline Suspension Wells: Dry Tree
Tiebacks and Conversion to Subsea Wells |
2006-G18 |
October 31, 2006 |
Wells (holes-in-the-ground) Without Assigned MMS API Numbers |
2006-G16
(Addendum 1) |
February 1, 2007 |
Well Records Submittal (Updated)
Elimination of Paper Copy Data Submittals (Addendum No. 1) |
2006-G16 |
July 15, 2006 |
Well Records Submittal (Updated)
Elimination of Paper Copy Data Submittals |
2006-G12 |
July 3, 2006 |
Ancillary Activities |
2006-N07 |
December 15, 2006 |
Participation in
Post-Mortem Hurricane Initiatives |
2006-G07 |
March 16, 2006 |
Revisions to the List
of OCS Lease Blocks Requiring Archaeological Resource Surveys and Reports |
2006-N06 |
December 19, 2006 |
Flaring and Venting
Approvals |
2006-G06 |
March 16, 2006 |
Resumption of Submission of Well Records to A2D's New Orleans Office |
2006-N05 |
September 1, 2006 |
Payment Method
for New and Existing Cost Recovery Fees |
2006-G04 |
February 22, 2006 |
Fire Prevention and
Control Systems |
2006-G01 |
February 1, 2006 |
Royalty Relief for Gulf
of Mexico OCS Oil and Gas Leases with Facilities Damaged by Hurricane Katrina
or Hurricane Rita |
2005-G20
(Addendum 1) |
June 12, 2006 |
Damage Caused by
Hurricanes Katrina and Rita (Addendum No. 1) |
2005-G20 |
October 24, 2005 |
Damage Caused by Hurricanes Katrina and
Rita |
2005-G09 |
June 1, 2005 |
Static Casing Pressures Less than 100 psig
|
2005-G07 |
July 1, 2005 |
Archaeological Resource Surveys and
Reports |
2005-N03 |
January 3, 2006 |
Payment Method for New and Certain Existing Cost
Recovery Fees |
2005-G01 |
January 6, 2005 |
Monitoring Bypassed Safety Devices |
2004-G13 |
June 22, 2004 |
Replacing Deep Gas Royalty Relief Provisions in Lease Instrument With Regulatory Deep
Gas Royalty Relief Provisions |
2004-G12 |
June 21, 2004 |
Clarification of Deep Gas Royalty Suspension Provision in Lease Instrument Relating
to Sidetrack Completions |
2004-G11 |
May 3, 2004 |
Clarification of Deep Gas Royalty Relief Regulation Regarding Natural Gas Liquids and Pipeline (Retrograde) Condensate |
2004-G09 |
May 17, 2004 |
Policies for Shutting-In Producible Wells During Rig Moves |
2004-G06 |
April 5, 2004 |
Structure Removal Operations |
2004-G05 |
April 1, 2004 |
Biologically Sensitive Areas of the Gulf of Mexico |
2004-N04 |
June 25, 2004 |
Data and Information to be Made Available to the Public |
2004-G04 |
March 7, 2004 |
Standard Reporting Period for the Well Activity Report |
2004-N03 |
July 26, 2004 |
Directional and Inclination Survey Data Submission Requirements |
2004-G03 |
February 6, 2004 |
Notification and Confirmation of Deep Gas Royalty
Relief |
2004-G02 |
January 27, 2004 |
Military Warning and Water Test Areas |
2003-G20 |
January 1, 2004 |
Gas Volume Statement Requirements |
2003-G05 |
February 15, 2003 |
Procedures for Submission, Inspection and Selection of Geophysical Data and Information Collected Under a Permit and
Processed or Reprocessed by a Permittee or a Third Party
|
2003-N04 |
May 9, 2003 |
Extension of Lease Terms by Production in Paying
Quantities |
2003-G02 |
March 3, 2003 |
Ultimate Recovery Abandonment and Bypassing of Zones |
2002-N13 |
November 1, 2002 |
Drilling and Well Permit and Reporting Forms |
2002-G12 |
November 4, 2002 |
Revised North American Datum 83 Implementation Plan for the Gulf of
Mexico |
2002-G10 |
September 4, 2002 |
Standard Conditions of Approval for Well Activities |
2002-N07 |
July 19, 2002 |
Reminder of the 20 Percent Set-Aside Provision for
Small or Independent Refiners |
2002-N06 |
July 11, 2002 |
Guidelines for Crane Load Tests and Recordkeeping on Fixed Offshore OCS Facilities |
2002-G03 |
March 20, 2002 |
Supervisory Control and Data Acquisition (SCADA) Systems |
2002-N02 |
February 14, 2002 |
Revised Guidelines for Royalty Relief Under 30 CFR
Part 203 |
2002-G02 |
March 1, 2002 |
Notification and Confirmation of Deepwater Royalty
Relief for Eligible Leases |
2001-G10 |
November 28, 2001 |
Clarification of Eastern Gulf of Mexico Sale 181 Military Areas Stipulation |
2001-N02 |
September 6, 2001 |
Submitting Semiannual Well Test Results Electronically |
2000-G20 |
December 6, 2000 |
Deepwater Chemosynthetic Communities |
2000-G17 |
September 1, 2000 |
Suspension of Production/Operations Overview |
2000-G16 |
September 7, 2000 |
Guidelines for General Lease Surety Bonds |
2000-G13 |
May 25, 2000 |
Production Safety Systems Requirements |
2000-N07 |
November 9, 2000 |
Well Naming and Numbering Standards |
2000-G07 |
February 22, 2000 |
Accidental Disconnect of Marine Drilling Risers |
2000-G03 |
January 28, 2000 |
Functional Responsibility of MMS Regulations |
NTL 99-G22 |
September 24, 1999 |
Guidelines for the Sub-Seabed Disposal and Offshore Storage of Solid Wastes |
NTL 99-G20 |
September 7, 1999 |
Downhole Commingling Applications |
NTL 99-G19 |
September 7, 1999 |
Downhole Commingling Policies |
NTL 99-G12 |
June 7, 1999 |
Increased Level II Underwater Structural Inspection Intervals |
NTL 99-G11 |
June 7, 1999 |
Approval of Acidizing Operations |
NTL 99-G10 |
May 11, 1999 |
Designated Safe Welding and Burning Areas on Rigs |
NTL 99-G09 |
May 10, 1999 |
Location of Choke and Kill Lines on BOP Stacks |
NTL 99-G07 |
May 3, 1999 |
U.S. Air Force Communication Towers |
NTL 99-G06 |
May 1, 1999 |
Economic Assumptions for RSVP Deepwater Royalty Relief Model |
NTL 99-G05 |
April 26, 1999 |
Submittal of Documents for Platforms and Structures |
NTL 99-G01 |
February 12, 1999 |
Deepwater Emergency Well Control Operations |
NTL 98-26 |
November 30, 1998 |
Minimum Interim Requirements for Site Clearance (and Verification) of Abandoned Oil
and Gas Structures in the Gulf of Mexico |
NTL 98-23 |
October 15, 1998 |
Interim Reporting Requirements for 30 CFR 250, Subpart K,
Oil and Gas Production Rates |
NTL 98-19 |
September 15, 1998 |
Temporary Abandonment of Wells and Maintenance, Protection, and Removal of Underwater
Casing Stubs |
NTL 98-16 |
August 10, 1998 |
Hydrogen Sulfide (H2S) Requirements |
NTL 98-13N |
July 1, 1998 |
Use of New or Alternative Technology and Procedures |
NTL 98-13 |
August 10, 1998 |
Minimizing Oil and Gas Structures in the Gulf of Mexico |
NTL 98-12N |
July 1, 1998 |
Determination of Pollution Inspection Frequencies
for Unmanned Facilities |
NTL 98-10 |
August 10, 1998 |
Best Available Control Technology (Sulphur Dioxide) |
NTL 98-09 |
August 10, 1998 |
Proposed and As-Built Pipeline Location Data |
NTL 98-5N |
April 1, 1998 |
Application and Audit Fees for Requests for Royalty Relief or Adjustment Under 30 CFR
Part 203 |
NTL 97-18 |
August 18, 1997 |
Timely Submittal of Deepwater Royalty Relief Applications |
NTL 97-17 |
August 1, 1997 |
Containment Requirements for Bolted or Welded Stock Tanks |
NTL 97-16 |
August 1, 1997 |
Production Within 500 Feet of a Unit or Lease Line |
NTL 97-4N |
September 1, 1997 |
Outer Continental Shelf (OCS) Civil Penalties Program Annual Summary to be Published |
NTL 96-08 |
November 25, 1996 |
Time Allowed for the Correction of Incidents of Noncompliance (INC's) and for the
Return of Notification of INC Forms |