DEPARTMENT OF AGRICULTURE



Rural Utilities Service



 

Georgia Transmission Corporation; Notice of Finding of No 

Significant Impact



AGENCY: Rural Utilities Service, USDA.



ACTION: Notice of finding of no significant impact.



-----------------------------------------------------------------------



SUMMARY: Notice is hereby given that the Rural Utilities Service (RUS) 

has made a finding of no significant impact (FONSI) with respect to a 

request from Georgia Transmission Corporation for assistance from the 

RUS to finance the construction of a 230/115 kV transmission line in 

Gwinnett and Hall Counties, Georgia.



FOR FURTHER INFORMATION CONTACT: Bob Quigel, Environmental Protection 

Specialist, Engineering and Environmental Staff, RUS, Stop 1571, 1400 

Independence Avenue, SW., Washington, DC 20250-1571, telephone (202) 

720-0468, fax (202) 720-0820, 

e-mail at bquigel@rus.usda.gov.



SUPPLEMENTARY INFORMATION: Georgia Transmission Corporation proposes to 

construct a 230 kV electric transmission line from the Spout Springs 

Road Substation to be located in Hall County 2000 feet East of the 

intersection of Williams Road and Spout Springs Road, and traverse 

southwest paralleling an existing Georgia Power Company 500 kV 

transmission line for approximately 4 miles. Approximately \1/2\ mile 

of this line will deviate from the existing right-of-way to minimize 

impacts to local residences. The right-of-way for this portion of the 

transmission line will be widened 100 feet. At about \1/2\ mile 

southwest of Hamilton Mill Road in Gwinnett County the transmission 

line



[[Page 10890]]



will turn to the northwest on an existing Georgia Power Company 115 kV 

transmission line right-of-way for approximately 5 miles. The existing 

115 kV transmission line will be reconstructed as an underbuild of the 

230 kV transmission line. (The 230 kV and 115 kV transmission lines 

would share the same transmission line support structures.) The 

existing right-of-way will not need to be widened. The transmission 

line would then turn to the southwest on a new right-of-way along 

Peachtree Industrial Boulevard for approximately 1.6 miles to the Shoal 

Creek Substation to be located in Gwinnett County southwest of the 

intersection of Tuggle Greer Road and Peachtree Industrial Boulevard. 

(Georgia Power Company will construct the Shoal Creek Substation.) The 

new right-of-way will be forty (40) feet in width. This portion of the 

transmission line will also be underbuilt with a 115 kV transmission 

line. Both the 230 kV and the 115 kV transmission lines will connect to 

the Shoal Creek Substation. The portion of the 230 kV transmission line 

to parallel the 500 kV transmission line will be supported by single 

pole concrete structures. The 230 kV portion of the transmission line 

to be underbuilt with the 115 kV transmission line will be supported by 

single pole steel or concrete structures. It is anticipated that the 

transmission lines will be completed and energized by May 2003.

    Copies of the FONSI are available for review at, or can be obtained 

from, RUS at the address provided herein or from Ms. Wende Martin, 

Georgia Transmission Corporation, 2100 East Exchange Place, Tucker, 

Georgia 30085-2088, telephone (770) 270-7591. Ms. Martin's e-mail 

address is wende.martin@gatrans.com.



    Dated: March 5, 2002.

Blaine D. Stockton,

Assistant Administrator, Electric Program, Rural Utilities Service.