Tri-Party Agreement Change Requests

1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 
REQUEST APPROVAL DATE CHANGE REQUEST TITLE
M-15-04-01   05/20/2004  Modify the Waste Control Plan for the 200-PW-2 Operable Unit (CP-13935).  
M-16-03-03   06/29/2004  M-016 Submission and Implementation of a work plan for acquisition of TRU and TRU Mixed-Waste management Capabilities to Support CERCLA Actions at the Hanford Site.  
C-03-01   06/29/2004  Modify Tri-Party Agreement Appendices B and C, establish a new operable unit for selected U Plan Area waste sites (200-UW-1) and designate Ecology as the Lead Regulatory Agency.  
C-03-02   06/29/2004  Modify regulatory designation and Lead Agency for selected 200-LW-1 waste sites (Appendix C).  
M-15-01-05   06/29/2004  Establish interim milestones for the 200-PW-1 Plutonium/Organic-Rich, 200-PW-3 Organic-Rich, and 200-PW-6 Plutonium-Rich Process Condensate/Process Waste Group Operable Units RI/FS.  
M-20-04-01  06/29/2004  Integrated closure of the 1706-KE Waste Treatment System and 303-M Oxide Facility and completion of Major Milestone M-20-00A. 
M-23-04-01  06/29/2004  Modification of Hanford Federal Facility Agreement and Consent Order (HFFACO) M-023-25 and M-023-25G Milestones to realign installation of liquid observation wells (LOWS) with current retrieval schedule for Single-Shell Tanks (SSTs) C-103, C-105, C-102, and C-112. 
M-24-02-02  06/29/2004  Overall strategy and approach for groundwater protection, monitoring and remediation under Tri-Party Agreement Milestone Series M-024. 
M-35-04-01  06/29/2004  Extend due date for Interim Milestone M-35-09D to allow time for finalization of biennial assessment. 
M-45-04-02  06/29/2004  Hanford Federal Facility Agreement and Consent Order (HAFFCO or Agreement) modifications of Milestone M-45-05H and M-45-05N-T01. 
M-46-04-01  06/29/2004  Modification of Hanford Federal Facility Agreement and Consent Order (HFFACO) Milestone M-46-01J to allow for public review and signature of the M-45-00C milestone and the revision of DOEs Single-Shell Tank Retrieval Sequence and Double Shell tank Space Evaluation Report (RPP-8554, Rev. 2) to reflect M-45-00C negotiations. 
M-83-03-01  06/29/2004  PFP M-83-13 Interim Milestone residues storage modification. 
M-91-03-01  06/29/2004  Modification of Hanford Federal Facility Agreement and Consent Order M-91 Series Provisions. 
M-45-04-03  07/28/2004  Realign completion dates for Tri-Party Agreement Target Milestones M-45-55-T03 and M-45-55-T04. 
M-16-04-01   08/04/2004  Modify Tri-Party Agreement milestones associated with the 618-10 and 618-11 Burial Grounds (M-016-66, M-016-67).  
M-16-04-05   08/10/2004  Establish Tri-Party Agreement interim milestones under the M-016 series milestones to address groundwater contamination in the 300-FF-5 Operable Unit.  
M-45-04-01  08/17/2004  Hanford Federal Facility Agreement and Consent Order (HFFACO or Agreement) modifications pursuant to Milestone M-45-00C including Appendix D work schedule modifications governing single-shell tank (SST) system waste retrieval and closure, and the establishment of new Agreement Appendix I, Single-Shell Tank System Waste Retrieval and Closure Process. 
M-46-04-02  08/17/2004  Hanford Federal Facility Agreement and Consent Order (HFFACO or Agreement) modifications to Milestone M-46-00 for Double Shell Tank Space Evaluation and Milestone M-46-01 for Ecology concurrence of additional tank acquisition. 
D-04-01   08/18/2004  Modify Lead Regulatory Agency designation for the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) for the Uranium Trioxide Complex Disposition Project.  
M-16-04-04   08/30/2004  Establish Tri-Party Agreement interim milestones under the M-016 series milestones to support K Basin Remediation Acceleration.  
M-34-04-01  08/31/2004  Acceleration of K Basins sludge treatment, and disposal, basin remediation, and delay in sludge retrieval. 
M-23-04-02  09/07/2004  Modification of Hanford Federal Facility Agreement and Consent Order (HFFACO) M-23-25 and M-23-25G milestones to delete the required installation of liquid observation wells (LOWS) for Single-Shell Tanks (SSTs) C-103, C-105, C-102, and C-112. 
M-16-04-02   09/20/2004  Modify completion date and Tri-Party Agreement Milestones for the 300 Area remedial actions (Tri-Party Agreement Milestone Series M-016).  
M-94-04-01  09/20/2004  Modify the deliverables and completion date for the 300 Area surplus facilities under Tri-Party Agreement Milestone Series M-094. 
M-24-04-01  09/28/2004  Groundwater protection, monitoring and remediation well installation priority list for CY 2004-CY2007 and modify Tri-Party Agreement Interim Milestone M-024-57. 
M-91-03-05  10/04/2004  Modify due dates fro Interim Milestones M-91-12 and M-91-12A. 
C-04-01   10/05/2004  Modify Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Appendix C moving the 216-N-8 Waste Site from the 200-CW-1 Operable Unit (OU) to the 200-UR-01 OU.  
M-15-04-02   10/12/2004  200-ZP-1 CERCLA remedial investigation/feasibility study process.  
M-16-04-08   10/26/2004  Establish Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Interim Milestone M-016-28B to begin treatability test at the 100-KR-4 Operable Unit.  