Tri-Party Agreement Change Requests

1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 
REQUEST APPROVAL DATE CHANGE REQUEST TITLE
M-14-92-01   01/11/1993  Provide low-level mixed waste laboratory services  
M-15-92-02A   01/21/1993  100-KR-1 RI/FS interim milestone  
M-15-92-03A   01/21/1993  100-FR-1 RI/FS interim milestones  
M-15-92-04A   01/21/1993  100-BC-1 RI/FS interim milestones  
M-05-92-04A   01/21/1993  Tank 241-C-106 interim milestone additions to milestone M-05  
M-15-92-7   01/21/1993  100-HR-3 RI/FS interim milestones  
M-15-92-08   01/21/1993  100-FR-3 RI/FS interim milestones 
M-15-92-09   01/21/1993  100-KR-4 RI/FS interim milestones  
M-15-92-10   01/21/1993  100-BC-5 RI/FS interim milestones  
M-15-92-11   01/21/1993  100-HR-1 RI/FS interim milestones  
M-17-92-04  01/21/1993  U03/U Plant waste water discharge flow rate reduction  
M-20-92-3  01/21/1993  Modify PUREX Plant Part B Permit application Interim Milestone M-20-24 
M-05-92-05E   01/23/1993  Remedial actions necessary for assumed leaking single-shell tank T-101  
C-92-1   02/18/1993  Consolidate Operable Units 100-BC-2, 100-BC-3, and 100-BC-4  
M-13-92-2   02/18/1993  Extend Milestone M-13-01 to reflect consolidation of Operable Units 100-BC-2, 100-BC-3, and 100-BC-4  
M-17-93-02  03/30/1993  Revisions to the B Plant chemical sewer and cooling water sampling and analysis plans 
M-17-93-01A  05/20/1993  Liquid Effluent Sampling and Analysis Quality Assurance Program Plan revision 
M-11-92-02A   05/24/1993  Revise target date M-11-00-T1 
M-15-92-06   05/28/1993  100-DR-1 RI/FS interim milestones  
C-93-03B   05/28/1993  Reassignment of Waste Management Units (WMUs) associated with the 200-UP-2 Operable Unit (OU) 
C-93-04   05/28/1993  Redesignation of the 200-ZP-1 and 200-ZP-2 Operable Units and redefinition of the 200 West Area groundwater operable units  
M-20-92-8  05/28/1993  Establish new interim milestone T Plant Complex Part B Permit Application (M-20-51) 
M-20-93-01  05/28/1993  Establish new TPA Milestone Submit The 241-Z Treatment and Storage Tanks Part B Permit Application to Ecology and The EPA (M-20-48)  
M-17-93-05  07/15/1993  Sampling and analysis plans, revisions of analytical methods 
M-17-93-03  07/21/1993  Interim operating restrictions for the 300 Area process sewer discharge to the 300 Area process trenches 
M-13-93-01 & C-93-07   08/03/1993  Integrate 200-BP-11 Source Operable Unit and 216-B-3 Pond work/closure plans 
M-20-92-7  08/03/1993  Delay in submittal for TPA Milestone M-20-42 to December 31, 1994 
C-93-05   08/03/1993  Miscellaneous underground tanks  
C-93-06   08/03/1993  Redesignation of 200-BP-5 and 200-PO-2 groundwater operable units and reassignment of associated groundwater investigations, waste management units, and unplanned releases  
C-93-07   08/03/1993  Integrate 200-BP-11 source operable unit and 216-B-3 pond work/closure plans 
M-03-93-01B   08/03/1993  Temporary suspension of Interim Milestone M-03-05, Initiate construction of the vitrification building foundation  
M-24-93-1  08/03/1993  Eliminate one well from Interim Milestone M-24-30  
M-13-93-02   08/10/1993  200 Area groundwater operable units milestone revision 
M-05-93-02B   08/19/1993  Defer milestone M-05-05 Interim Stabilize an Additional 11 Single-Shell Tanks 
M-10-93-01   09/22/1993  Modification to the fiscal year 1993 tank characterization milestone  
M-02-93-01   09/22/1993  Defer milestones M-02-03 and M-02-05 to be consistent with ongoing Tank Waste Remediation System (TWRS) negotiations  
M-10-93-02   09/29/1993  Modification to the fiscal year 1993 rotary mode sampling milestone 
M-17-93-09  11/02/1993  Revisions to 300 Area Process Sewer Sampling and Analysis Plan 
M-03-93-02   11/17/1993  Administrative delay to Hanford Waste Vitrification Plant Milestones M-03-05 and M-03-06-T1 to allow time for approval of renegotiated agreements  
M-01-93-01   11/19/1993  Defer grout milestones M-01-01A, M-01-01B, and M-01-3A pending final signature of negotiated agreements  
M-17-93-12  12/02/1993  Revisions to the Plutonium Finishing Plant Wastewater Sampling and Analysis Plan 
M-20-92-05  12/15/1993  Delete 303-M Oxide Facility Milestone M-20-30, and incorporate 303-M into the 300-FF-2 Operable Unit 
M-17-93-07  12/16/1993  Revise due date for completion of Milestones M-17-14 and M-17-29 