Item No. | Description | Points Deducted |
08 | PW filling hoses, caps, connections, procedures; Sample records, valves; PW system constructed, maintained | 0 |
11 | Food handlers infections, communicable diseases | 0 |
20 | PHF temperature maintenance facilities; Food-contact surfaces designed, constructed, installed, maintained; TMD=s provided, located, calibrated | 0 |
22 | Dishwashing / equipment washing facilities designed, constructed, maintained, installed, located, operated, TMDs, test kits | 0 |
24 | Sanitizing rinse temperature, concentration, time | 0 |
27 | Equipment / utensils non-food-contact surfaces clean | 0 |
29 | Facilities convenient, accessible, designed, installed | 0 |
33 | Decks / bulkheads / deckheads construction, repair, clean | 1 |
37 | Rooms / equipment vented, humidity, condensation | 0 |
40 | IPM procedures developed; followed; outer openings protected | 0 |
|
Selected Item Details
|
Item No.:
08
|
|
Site:
Potable Water-DECK 5 MAIN GALLEY PORTSIDE BEVERAGE PANTRY |
Violation:
THE CONTINUOUS PRESSURE BACKFLOW PREVENTION DEVICE ON THE COFFEE MACHINE WAS LEAKING INDICATING A FAILED INTERNAL SEAL. |
Recommendation:Ensure that backflow preventers are maintained in good repair. |
|
Site:
Potable Water-CROSS-CONNECTION CONTROL PROGRAM |
Violation:
AIR-GAPS INSTALLED IN EQUIPMENT, SUCH AS DISHWASHERS AND CHEMICAL DISPENSER STATIONS ARE NOT LISTED IN THE CROSS-CONNECTION CONTROL PROGRAM. ALL OTHER MECHANICAL DEVICES APPEAR TO BE LISTED IN THE PROGRAM.
THIS IS A NEW REQUIREMENT IN THE 2005 VSP OPERATIONS MANUAL
|
Recommendation:Ensure that the cross-connection control program includes at minimum: a complete listing of cross-connections and the backflow prevention method/device for each, so that there is a match to the plumbing system component and location, and an inspection frequency. Ensure that air-gaps are include din the listing. |
|
|