PART ONE


OVERVIEW


1. Date of Submission:
2008-02-04
2. Agency:
009
3. Bureau:
38
4. Name of this Capital Asset:
CMS Q-net
5. Unique Project Identifier:
009-38-01-02-01-2200-00
6. What kind of investment will this be in FY2009?
Operations and Maintenance
7. What was the first budget year this investment was submitted to OMB?
FY2001 or earlier
8. Provide a brief summary and justification for this investment, including a brief description of how this closes in part or in whole an identified agency performance gap.
QualityNet (QNET), formerly the Standard Data Processing System (SDPS), was developed in response to the ongoing information requirements of the Quality Improvement Organizations (QIOs) and other affiliated partners (e.g., Clinical Data Abstraction Centers (CDAC)) to fulfill their contractual requirements. QIOs contract with CMS to improve the quality of care for beneficiaries by ensuring that this care meets professionally-recognized standards of health care. These partners are awarded contracts based on agency and legislative statements of work which directly reflect goals in the PMA Initiative "Expanded E-Government" and the HHS strategic plan of "Improving Health Care Quality, Safety, Cost and Value." The contract statements of work (SOW) cover 3-year periods. They include data center operations, application development, telecommunication fees, and all other IT infrastructure such as servers, racks, and backup. QNET provides the application, data, and physical infrastructure to support the SOW with the efficient collection, analysis, dissemination, and management of data guiding policy and intervention, as well as SOW evaluation. QNET, which became operational in May 1997, interfaces with CMS Central Office, the QIES systems, the ESRD system, 53 QIOs, and a CDAC. QNET is an information system solution that provides a common platform for users to share applications and databases to promote efficiency and increase production for all the contractors performing work on the SOW. The overall goal is to provide an IT infrastructure to support QIO operations, promote information sharing, and support management information, all in direct response to the 3- year SOW. As CMS has moved development to the Web, and as the QIO program mission has changed and legislative requirements have developed, QNET has expanded greatly to meet the needs its external communities, as well. In FY06, the QNET system began supporting the CMS' Pay for Performance program in its initial phase, The Physician Voluntary Reporting phase. QNET includes QualityNet.org which is the initial web portal for all external customers. Information resides primarily at QNet Complex 3 located at the BCSSI Data Center in Warrenton, VA on dedicated QNet servers and networks. In addition, the CMS claims warehouse and enrollment database resides at Complex 1, CMS Data Center in Baltimore, Maryland on CMS Office of Information Systems servers and networks. QNET is in the CPIC Steady State phase.
9. Did the Agency's Executive/Investment Committee approve this request?
yes
9.a. If "yes," what was the date of this approval?
2007-06-26
10. Did the Project Manager review this Exhibit?
yes
11.a. What is the current FAC-P/PM certification level of the project/program manager?
TBD
12. Has the agency developed and/or promoted cost effective, energy-efficient and environmentally sustainable techniques or practices for this project.
yes
12.a. Will this investment include electronic assets (including computers)?
yes
12.b. Is this investment for new construction or major retrofit of a Federal building or facility? (answer applicable to non-IT assets only)
no
13. Does this investment directly support one of the PMA initiatives?
yes
If yes, select the initiatives that apply:
Initiative Name
Expanded E-Government
13.a. Briefly and specifically describe for each selected how this asset directly supports the identified initiative(s)? (e.g. If E-Gov is selected, is it an approved shared service provider or the managing partner?)
QNET (formally SDPS) directly supports the Expanded E-Government Initiative, since QNET supports QualityNet Exchange and web e-government activities. QualityNet Exchange is a web interface that allows the public secure registration and the exchange of program-required data over the Internet, lowering costs for data collection and allowing greater outreach to provider and beneficiary communities. QualityNet Exchange is the primary application that is part of the QNET investment.
14. Does this investment support a program assessed using the Program Assessment Rating Tool (PART)?
yes
14.a. If yes, does this investment address a weakness found during the PART review?
yes
14.b. If yes, what is the name of the PARTed program?
2003: CMS - Medicare Program
14.c. If yes, what rating did the PART receive?
Moderately Effective
15. Is this investment for information technology?
yes
16. What is the level of the IT Project (per CIO Council's PM Guidance)?
Level 3
17. What project management qualifications does the Project Manager have? (per CIO Council's PM Guidance)
(1) Project manager has been validated as qualified for this investment
18. Is this investment identified as high risk on the Q4 - FY 2007 agency high risk report (per OMB memorandum M-05-23)?
no
19. Is this a financial management system?
no
20. What is the percentage breakout for the total FY2009 funding request for the following? (This should total 100%)
AreaPercentage
Hardware3
Software4
Services90
Other3
21. If this project produces information dissemination products for the public, are these products published to the Internet in conformance with OMB Memorandum 05-04 and included in your agency inventory, schedules and priorities?
yes
22. Contact information of individual responsible for privacy related questions.
NameMaribel Franey
Phone Number410-786-0757
TitleDirector, Privacy Compliance
EmailMaribel.Franey@cms.hhs.gov
23. Are the records produced by this investment appropriately scheduled with the National Archives and Records Administration's approval?
yes
24. Does this investment directly support one of the GAO High Risk Areas?
yes

SUMMARY OF SPEND


1. Provide the total estimated life-cycle cost for this investment by completing the following table. All amounts represent budget authority in millions, and are rounded to three decimal places. Federal personnel costs should be included only in the row designated Government FTE Cost, and should be excluded from the amounts shown for Planning, Full Acquisition, and Operation/Maintenance. The total estimated annual cost of the investment is the sum of costs for Planning, Full Acquisition, and Operation/Maintenance. For Federal buildings and facilities, life-cycle costs should include long term energy, environmental, decommissioning, and/or restoration costs. The costs associated with the entire life-cycle of the investment should be included in this report.

All amounts represent Budget Authority

Note: For the cross-agency investments, this table should include all funding (both managing partner and partner agencies).

Government FTE Costs should not be included as part of the TOTAL represented.
Cost TypePy-1 & Earlier
-2006
PY
2007
CY
2008
BY
2009
Planning Budgetary Resources0.0000.0000.0000.000
Acquisition Budgetary Resources0.0000.0000.0000.000
Maintenance Budgetary Resources29.66126.83669.05652.210
Government FTE Cost1.8233.0003.1003.200
# of FTEs16181818
2. Will this project require the agency to hire additional FTE's?
yes
2.a. If "yes," how many and in what year?
8 new FTEs to support new requirements and growth of system. Proper federal oversight of this system will require addtional FTE resources.If the agency is not given the addtional FTE's proper managment and oversight may lax. These should be added starting in FY08. This is due to a new scope of work and increase in effort. A zero base budget drill was performed and showed the need for at least 8 new FTE's to keep all work moving and properly managed.
3. If the summary of spending has changed from the FY2008 President's budget request, briefly explain those changes.
Spending has increased from the FY2008 President's budget request since the Q-NET exhibit E300 now includes the costs needed to suppport the QIO 9th Scope of Work (SOW).

PERFORMANCE


In order to successfully address this area of the exhibit 300, performance goals must be provided for the agency and be linked to the annual performance plan. The investment must discuss the agency's mission and strategic goals, and performance measures (indicators) must be provided. These goals need to map to the gap in the agency's strategic goals and objectives this investment is designed to fill. They are the internal and external performance benefits this investment is expected to deliver to the agency (e.g., improve efficiency by 60 percent, increase citizen participation by 300 percent a year to achieve an overall citizen participation rate of 75 percent by FY 2xxx, etc.). The goals must be clearly measurable investment outcomes, and if applicable, investment outputs. They do not include the completion date of the module, milestones, or investment, or general goals, such as, significant, better, improved that do not have a quantitative measure.
Agencies must use the following table to report performance goals and measures for the major investment and use the Federal Enterprise Architecture (FEA) Performance Reference Model (PRM). Map all Measurement Indicators to the corresponding Measurement Area and Measurement Grouping identified in the PRM. There should be at least one Measurement Indicator for each of the four different Measurement Areas (for each fiscal year). The PRM is available at www.egov.gov. The table can be extended to include performance measures for years beyond FY 2009.
RowFiscal YearStrategic Goal SupportedMeasurement AreaMeasurement GroupingMeasurement IndicatorBaselinePlanned Improvement to the BaselineActual Results
12005S.O. 1.3 - Improve health care quality, safety, cost and valueMission and Business ResultsHealth Care Administration% of QIO Quality Targets Established0% established100%75%
22005S.O. 1.3 - Improve health care quality, safety, cost and valueCustomer ResultsService Efficiency% of helpdesk tickets closed within 10 days0%90% closed50%
32005S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyAvailability% of CART Hospital Measures Established0%100%75%
42005S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyData Reliability and Quality% of HL7 Standards Used0% standards used0%100%
52005S.O. 1.3 - Improve health care quality, safety, cost and valueProcesses and ActivitiesErrors% of required patches/bug fixes to code0%10%25%
62006S.O. 1.3 - Improve health care quality, safety, cost and valueMission and Business ResultsHealth Care Administration% of QIO Quality Targets Established75%100%90%
72006S.O. 1.3 - Improve health care quality, safety, cost and valueCustomer ResultsService Efficiency% of helpdesk tickets closed within 10 days50%100%75%
82006S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyAvailability% of CART Hospital Measures Established75%100%100%
92006S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyResponse Time% of custom applications delivered on time60%90%50%
102006S.O. 1.3 - Improve health care quality, safety, cost and valueProcesses and ActivitiesErrors% of required patches/bug fixes to code25%10%20%
112007S.O. 1.3 - Improve health care quality, safety, cost and valueMission and Business ResultsHealth Care Administration% of QIO Quality Targets Established90%100%98% as of Q3
122007S.O. 1.3 - Improve health care quality, safety, cost and valueCustomer ResultsService Efficiency% of helpdesk tickets closed within 10 days75%90%98% as of Q3
132007S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyAvailability% of NEW CART Hospital Measures Established for HQA and APU0%75%75% as of Q3
142007S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyResponse Time% of custom applications delivdered on time50%75%40% as of Q3
152007S.O. 1.3 - Improve health care quality, safety, cost and valueProcesses and ActivitiesErrors% of required patches/bug fixes to code20%10%85% as of Q3
162008S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyResponse Time% of custom applications delivered on time40%75%TBD
172008S.O. 1.3 - Improve health care quality, safety, cost and valueCustomer ResultsService Efficiency% of QIO Quality Targets Established98%100%TBD
182008S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyAvailability% of NEW CART Hospital Measures Established for HQA and APU75%100%TBD
192009S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyResponse Time% of custom applications delivered on time40%85%TBD
202008S.O. 1.3 - Improve health care quality, safety, cost and valueProcesses and ActivitiesErrors% of required patches/bug fixes to code85%20%TBD
212009S.O. 1.3 - Improve health care quality, safety, cost and valueMission and Business ResultsHealth Care Administration% of QIO 9 SOW Quality Targets Established0%100%TBD
222009S.O. 1.3 - Improve health care quality, safety, cost and valueCustomer ResultsService Efficiency% of helpdesk tickets closed within 10 days98%100%TBD
232009S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyAvailability% of NEW 9 SOW CART Hospital Measures Established for HQA and APU0%75%TBD
242009S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyData Reliability and Quality% of HL7 Standards established within EHR systems0%100%TBD
252009S.O. 1.3 - Improve health care quality, safety, cost and valueProcesses and ActivitiesErrors% of required patches/bug fixes to code85%10%TBD
262010S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyResponse Time% of custom applications delivered on time40%90%TBD
272010S.O. 1.3 - Improve health care quality, safety, cost and valueCustomer ResultsService Efficiency% of helpdesk tickets closed within 10 days98%100%TBD
282010S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyAvailability% of NEW 9 SOW CART Hospital Measures Established for HQA and APU0%100%TBD
292010S.O. 1.3 - Improve health care quality, safety, cost and valueTechnologyData Reliability and Quality% of HL7 Standards established within EHR systems0%100%TBD
302010S.O. 1.3 - Improve health care quality, safety, cost and valueProcesses and ActivitiesErrors% of required patches/bug fixes to code85%5%TBD
312010S.O. 1.3 - Improve health care quality, safety, cost and valueMission and Business ResultsHealth Care Administration% of 9 SOW measures monitored in the New MIS systems0%100%TBD
322008S.O. 1.3 - Improve health care quality, safety, cost and valueMission and Business ResultsHealth Care Administration% of 9 SOW measures monitored in the New MIS systems0%75%TBD

Enterprise Architecture


In order to successfully address this area of the business case and capital asset plan you must ensure the investment is included in the agency's EA and Capital Planning and Investment Control (CPIC) process, and is mapped to and supports the FEA. You must also ensure the business case demonstrates the relationship between the investment and the business, performance, data, services, application, and technology layers of the agency's EA.
1. Is this investment included in your agency's target enterprise architecture?
yes
2. Is this investment included in the agency's EA Transition Strategy?
yes
2.a. If yes, provide the investment name as identified in the Transition Strategy provided in the agency's most recent annual EA Assessment.
CMS Q-net
3. Is this investment identified in a completed (contains a target architecture) and approved segment architecture?
no
4. Identify the service components funded by this major IT investment (e.g., knowledge management, content management, customer relationship management, etc.). Provide this information in the format of the following table. For detailed guidance regarding components, please refer to http://www.whitehouse.gov/omb/egov/.

Component: Use existing SRM Components or identify as NEW. A NEW component is one not already identified as a service component in the FEA SRM.

Reused Name and UPI: A reused component is one being funded by another investment, but being used by this investment. Rather than answer yes or no, identify the reused service component funded by the other investment and identify the other investment using the Unique Project Identifier (UPI) code from the OMB Ex 300 or Ex 53 submission.

Internal or External Reuse?: Internal reuse is within an agency. For example, one agency within a department is reusing a service component provided by another agency within the same department. External reuse is one agency within a department reusing a service component provided by another agency in another department. A good example of this is an E-Gov initiative service being reused by multiple organizations across the federal government.

Funding Percentage: Please provide the percentage of the BY requested funding amount used for each service component listed in the table. If external, provide the funding level transferred to another agency to pay for the service.
RowAgency Component NameAgency Component DescriptionService TypeComponentReused Component NameReused UPIInternal or External Reuse?Funding %
1Identification and AuthenticationDefines the set of capabilities that support obtaining information about those parties attempting to log on to a system or application for security purposes and the validation of those users.Security ManagementIdentification and Authentication  No Reuse5
2Access ControlAccess Control - Support the management of permissions for logging onto a computer, application, service, or network; includes user management and role/privilege management.Security ManagementAccess Control  No Reuse5
3Standardized / CannedDefines the set of capabilities that support the use of pre-conceived or pre-written reports.ReportingStandardized / Canned  No Reuse5
4Ad HocDefines the set of capabilities that support the use of dynamic reports on an as needed basis.ReportingAd Hoc  No Reuse5
5Data WarehouseDefines the set of capabilities that support the archiving and storage of large volumes of data.Data ManagementData Warehouse  No Reuse10
6Meta Data ManagementDefines the set of capabilities that support the maintenance and administration of data that describes data.Data ManagementMeta Data Management  No Reuse5
7Data ExchangeDefines the set of capabilities that support the interchange of information between multiple systems or applications; includes verification that transmitted data was received unaltered.Data ManagementData Exchange  No Reuse20
8Data IntegrationDefines the set of capabilities that support the organization of data from separate data sources into a single source using middleware or application integration and the modification of system data models to capture new information within a single system.Development and IntegrationData Integration  No Reuse10
9Software DevelopmentDefines the set of capabilities that support the creation of both graphical and process application or system software.Development and IntegrationSoftware Development  No Reuse30
10Business Rule ManagementDefines the set of capabilities that manage the enterprise processes that support an organization and its policies.Management of ProcessesBusiness Rule Management  No Reuse5
5. To demonstrate how this major IT investment aligns with the FEA Technical Reference Model (TRM), please list the Service Areas, Categories, Standards, and Service Specifications supporting this IT investment.

FEA SRM Component: Service Components identified in the previous question should be entered in this column. Please enter multiple rows for FEA SRM Components supported by multiple TRM Service Specifications.

Service Specification: In the Service Specification field, Agencies should provide information on the specified technical standard or vendor product mapped to the FEA TRM Service Standard, including model or version numbers, as appropriate.
RowSRM Component>Service AreaService CategoryService StandardService Specification (i.e., vendor and product name)
1Software DevelopmentComponent FrameworkData ManagementDatabase ConnectivityActive Data Objects
2Software DevelopmentComponent FrameworkData InterchangeData ExchangeAltova XMLSpy
3Software DevelopmentService Platform and InfrastructureSupport PlatformsPlatform DependentAltova XMLSpy
4Ad HocComponent FrameworkPresentation / InterfaceDynamic Server-Side DisplayCognos
5Data WarehouseComponent FrameworkPresentation / InterfaceDynamic Server-Side DisplayCognos
6Ad HocComponent FrameworkData ManagementReporting and AnalysisCognos
7Data WarehouseComponent FrameworkData ManagementReporting and AnalysisCognos
8Software DevelopmentService Platform and InfrastructureSoftware EngineeringIntegrated Development EnvironmentEclipse
9Software DevelopmentComponent FrameworkBusiness LogicPlatform IndependentEnteprise Java Beans
10Data ExchangeService Interface and IntegrationInteroperabilityData Format / ClassificationExtensible Markup Language (XML) 1.1
11Software DevelopmentService Interface and IntegrationInteroperabilityData Format / ClassificationExtensible Markup Language (XML) 1.1
12Software DevelopmentComponent FrameworkPresentation / InterfaceStatic DisplayHyper Text Markup Language
13Data ExchangeService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsInternet Message Access Protocol
14Data ExchangeService Access and DeliveryService TransportSupporting Network ServicesInternet Message Access Protocol
15Software DevelopmentComponent FrameworkBusiness LogicPlatform IndependentJava
16Software DevelopmentComponent FrameworkBusiness LogicPlatform IndependentJava 2 Enterprise Edition
17Software DevelopmentService Platform and InfrastructureSupport PlatformsPlatform IndependentJava 2 Enterprise Edition
18Software DevelopmentComponent FrameworkPresentation / InterfaceDynamic Server-Side DisplayJava Server Pages
19Software DevelopmentComponent FrameworkBusiness LogicPlatform IndependentJavaScript
20Software DevelopmentService Interface and IntegrationInteroperabilityData Types / ValidationJAXP
21Software DevelopmentService Platform and InfrastructureSoftware EngineeringTest ManagementLoadRunner
22Software DevelopmentService Platform and InfrastructureSoftware EngineeringTest ManagementMercury Interactive Test Director
23Software DevelopmentService Platform and InfrastructureSupport PlatformsPlatform DependentMindreef SOAP Scope
24Software DevelopmentService Platform and InfrastructureSoftware EngineeringTest ManagementMindreef SOAP Scope
25Data IntegrationComponent FrameworkData ManagementDatabase ConnectivityObject Linking and Embedding, Database
26Software DevelopmentComponent FrameworkData ManagementDatabase ConnectivityObject Linking and Embedding, Database
27Standardized / CannedComponent FrameworkData ManagementDatabase ConnectivityODBC, JDBC, ADO, OLE/DB, DAO
28Data IntegrationComponent FrameworkData ManagementDatabase ConnectivityOpen Database Connectivity
29Software DevelopmentComponent FrameworkData ManagementDatabase ConnectivityOpen Database Connectivity
30Ad HocService Platform and InfrastructureSoftware EngineeringModelingOracle XML Query Service
31Software DevelopmentService Platform and InfrastructureSoftware EngineeringIntegrated Development EnvironmentPowerBuilder
32Software DevelopmentService Platform and InfrastructureSoftware EngineeringSoftware Configuration ManagementSerena PVCS - Dimensions
33Data ExchangeComponent FrameworkData InterchangeData ExchangeSOAP
34Identification and AuthenticationService Access and DeliveryService RequirementsAuthentication / Single Sign-onSun Identity Manager
35Access ControlService Access and DeliveryService RequirementsAuthentication / Single Sign-onSun Identity Manager
36Software DevelopmentComponent FrameworkPresentation / InterfaceDynamic Server-Side DisplaySWING
37Software DevelopmentService Platform and InfrastructureSoftware EngineeringModelingUnified Modeling Language
38Business Rule ManagementService Interface and IntegrationInteroperabilityData Types / ValidationXML , UML, EMF, JAXP, JDOM
39Meta Data ManagementService Interface and IntegrationInteroperabilityData Format / ClassificationXML, ORACLE, Power Designer
6. Will the application leverage existing components and/or applications across the Government (i.e., FirstGov, Pay.Gov, etc)?
no

PART THREE


RISK


You should perform a risk assessment during the early planning and initial concept phase of the investment's life-cycle, develop a risk-adjusted life-cycle cost estimate and a plan to eliminate, mitigate or manage risk, and be actively managing risk throughout the investment's life-cycle.

Answer the following questions to describe how you are managing investment risks.
1. Does the investment have a Risk Management Plan?
yes
1.a. If yes, what is the date of the plan?
2007-07-07
1.b. Has the Risk Management Plan been significantly changed since last year's submission to OMB?
no

COST & SCHEDULE


1. Was operational analysis conducted?
yes
1.a. If yes, provide the date the analysis was completed.
2007-07-31
What were the results of your operational analysis?
Some planned milestones actually started a month or two behind schedule, the actual costs compared to the planned costs decreased. Other planned milestones start/end dates were on schedule when compared to actual milestone start/end dates and costs were also on target. New milestones were added to the investment and were approved by HHS.Two major audits were performed, one from the Senate Finance Committee (Grassley) and one from IOM , all issues are being addressed in the 9 SOW. The issues were reviewed and approved by OMB for future funding to continue.
1.c. If no, please explain why it was not conducted and if there are any plans to conduct operational analysis in the future.
Not Applicable.