Exhibit 300 (BY2009) - Information Technology Infrastructure, Centers for Disease Control and Prevention

PART ONE


OVERVIEW


1. Date of Submission:
2008-02-04
2. Agency:
009
3. Bureau:
20
4. Name of this Capital Asset:
CDC Information Technology Infrastructure
5. Unique Project Identifier:
009-20-02-00-01-1152-00
6. What kind of investment will this be in FY2009?
Operations and Maintenance
7. What was the first budget year this investment was submitted to OMB?
FY2002
8. Provide a brief summary and justification for this investment, including a brief description of how this closes in part or in whole an identified agency performance gap.
CDC's IT infrastructure provides the foundation which enables CDC to perform it's critical mission of public health monitoring, research, communications, resource management, and surveillance. The goal is to provide service that is designed, deployed, operated and managed to meet the needs of CDC's public health mission. It must be flexible enough to respond to increased levels of service and rapid deployment of IT infrastructure for public health emergencies and support the day to day business functions. CDC with OMB approval has "restructured" CDC's Information Technology Service Office (ITSO). ITSO operates as a single enterprise office structured as a Restructured Organization (Formerly referred to as High Performing Organization (HPO)).ITSO is a consolidation of all IT infrastructure management and operations into a single organization reporting to the CDC Chief Information Officer and operating as a HPO in line with competitive sourcing policy exempt from a standard or streamlined competition for a period of five years (FY05- FY09) as long as all Key Performance Indicators (KPIs) are met or exceeded. Supporting 13,500 IT infrastructure users of CDC data and services, this investment include all CDC IT infrastructure services and costs. Infrastructure functions include acquisition, installation, and support of the following: Desktop workstations, Directory services, E-mail , Tier-one helpdesk, Infrastructure software, Internet/, IT security, Networking, Remote access, Server support , Telecommunications, Videoconferencing. Other alternatives evaluated include (1) continuation of the previous CDC infrastructure management distributed among 18 CDC programs in over 36 geographic locations; (2) consolidation of all IT infrastructure management and operations into a single organization without additional aggressive business process re-engineering. The current "restructured organization" continues to outperform the other alternatives. As of 3rd quarter FY07, all KPIs for cost efficiency, staffing efficiency, service offerings, and service quality have been exceeded. This investment was approved by the CDC TRB and CDC ITIRB in June 2006. This initiative is steady state; has conducted the first operational analysis; and as a result of the analysis will remain in steady state. This initiative supports HHS Goal 8: Achieve excellence in management practices and PMA Initiatives, Expanded Electronic government and Competitive Sourcing.
9. Did the Agency's Executive/Investment Committee approve this request?
yes
9.a. If "yes," what was the date of this approval?
2007-06-26
10. Did the Project Manager review this Exhibit?
yes
11.a. What is the current FAC-P/PM certification level of the project/program manager?
Senior/Expert-level
12. Has the agency developed and/or promoted cost effective, energy-efficient and environmentally sustainable techniques or practices for this project.
yes
12.a. Will this investment include electronic assets (including computers)?
yes
12.b. Is this investment for new construction or major retrofit of a Federal building or facility? (answer applicable to non-IT assets only)
no
13. Does this investment directly support one of the PMA initiatives?
yes
If yes, select the initiatives that apply:
Initiative Name
Competitive Sourcing
Expanded E-Government
13.a. Briefly and specifically describe for each selected how this asset directly supports the identified initiative(s)? (e.g. If E-Gov is selected, is it an approved shared service provider or the managing partner?)
Competitive Sourcing is supported by OMB approval of ITSO as a Restructured Organization (HPO) which provides exemption from a standard competition for 5 years (FY05-09). Using a combination of contractor and government staff, a 38% cost savings and 26% reduction in FTEs have been realized. Expanded e-Gov is supported by providing the IT foundation for infrastructure functions; quality services while assuring transparency and accountability for our customers; and reducing operating costs.
14. Does this investment support a program assessed using the Program Assessment Rating Tool (PART)?
no
15. Is this investment for information technology?
yes
16. What is the level of the IT Project (per CIO Council's PM Guidance)?
Level 2
17. What project management qualifications does the Project Manager have? (per CIO Council's PM Guidance)
(1) Project manager has been validated as qualified for this investment
18. Is this investment identified as high risk on the Q4 - FY 2007 agency high risk report (per OMB memorandum M-05-23)?
no
19. Is this a financial management system?
no
19.a.1. If yes, which compliance area:
Not Applicable
20. What is the percentage breakout for the total FY2009 funding request for the following? (This should total 100%)
AreaPercentage
Hardware25
Software11
Services64
Other1
21. If this project produces information dissemination products for the public, are these products published to the Internet in conformance with OMB Memorandum 05-04 and included in your agency inventory, schedules and priorities?
n/a
22. Contact information of individual responsible for privacy related questions.
NameAlice M. Brown
Phone Number770-488-8223
TitleIT Security Project Manager
EmailAMBrown1@cdc.gov
23. Are the records produced by this investment appropriately scheduled with the National Archives and Records Administration's approval?
no
24. Does this investment directly support one of the GAO High Risk Areas?
no

SUMMARY OF SPEND


1. Provide the total estimated life-cycle cost for this investment by completing the following table. All amounts represent budget authority in millions, and are rounded to three decimal places. Federal personnel costs should be included only in the row designated Government FTE Cost, and should be excluded from the amounts shown for Planning, Full Acquisition, and Operation/Maintenance. The total estimated annual cost of the investment is the sum of costs for Planning, Full Acquisition, and Operation/Maintenance. For Federal buildings and facilities, life-cycle costs should include long term energy, environmental, decommissioning, and/or restoration costs. The costs associated with the entire life-cycle of the investment should be included in this report.

All amounts represent Budget Authority

Note: For the cross-agency investments, this table should include all funding (both managing partner and partner agencies).

Government FTE Costs should not be included as part of the TOTAL represented.
Cost TypePy-1 & Earlier
-2006
PY
2007
CY
2008
BY
2009
Planning Budgetary Resources0.0000.0000.0000.000
Acquisition Budgetary Resources0.5000.0000.0000.000
Maintenance Budgetary Resources356.46756.41554.87054.540
Government FTE Cost18.44519.65520.53021.560
# of FTEs377195190190
2. Will this project require the agency to hire additional FTE's?
no
3. If the summary of spending has changed from the FY2008 President's budget request, briefly explain those changes.
No change.

PERFORMANCE


In order to successfully address this area of the exhibit 300, performance goals must be provided for the agency and be linked to the annual performance plan. The investment must discuss the agency's mission and strategic goals, and performance measures (indicators) must be provided. These goals need to map to the gap in the agency's strategic goals and objectives this investment is designed to fill. They are the internal and external performance benefits this investment is expected to deliver to the agency (e.g., improve efficiency by 60 percent, increase citizen participation by 300 percent a year to achieve an overall citizen participation rate of 75 percent by FY 2xxx, etc.). The goals must be clearly measurable investment outcomes, and if applicable, investment outputs. They do not include the completion date of the module, milestones, or investment, or general goals, such as, significant, better, improved that do not have a quantitative measure.
Agencies must use the following table to report performance goals and measures for the major investment and use the Federal Enterprise Architecture (FEA) Performance Reference Model (PRM). Map all Measurement Indicators to the corresponding Measurement Area and Measurement Grouping identified in the PRM. There should be at least one Measurement Indicator for each of the four different Measurement Areas (for each fiscal year). The PRM is available at www.egov.gov. The table can be extended to include performance measures for years beyond FY 2009.
RowFiscal YearStrategic Goal SupportedMeasurement AreaMeasurement GroupingMeasurement IndicatorBaselinePlanned Improvement to the BaselineActual Results
12006Effective Management of Human Capital/Information Technology/ResourcesMission and Business ResultsInformation Management# of new or expanded service offeringsNA+23
22006Effective Management of Human Capital/Information Technology/ResourcesProcesses and ActivitiesCostscost per user supported$6772/user$6839/user$5439/user
32006Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsService Efficiency# users supported per ITSO staff66.4 users/ITSO staff68.1 users/ITSO staff71.9 users/ITSO staff
42006Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsDelivery Time% of services that achieve SLA timeliness goals70%80%92.9%
52006Effective Management of Human Capital/Information Technology/ResourcesTechnologyReliability% of time is available in accordance with SLA99.8%99.8%99.94%
62007Effective Management of Human Capital/Information Technology/ResourcesMission and Business ResultsInformation Management# of new or expanded service offerings+2+2+6
72007Effective Management of Human Capital/Information Technology/ResourcesProcesses and ActivitiesCostscost per user supported$6839/user6908/user$5729/user
82007Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsService Efficiency# users supported per ITSO staff68.1 users/ITSO staff69.8 users/ITSO Staff73.9/users/ITSO staff
92007Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsDelivery Time% of services that achieve SLA timeliness goals80%85%83.6%
102007Effective Management of Human Capital/Information Technology/ResourcesTechnologyReliability% of time is available in accordance with SLA99.8%99.93%TBD
112008Effective Management of Human Capital/Information Technology/ResourcesMission and Business ResultsInformation Management# of new or expanded service offerings+2+2TBD
122008Effective Management of Human Capital/Information Technology/ResourcesProcesses and ActivitiesCostscost per user supported$6908/user$6977/userTBD
132008Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsService Efficiency# users supported per ITSO staff69.8 users/ITSO staff71.7 users/ITSO staffTBD
142008Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsDelivery Time% of services that achieve SLA timeliness goals85%90%TBD
152008Effective Management of Human Capital/Information Technology/ResourcesTechnologyReliability% of time is available in accordance with SLA99.8%99.8%TBD
162009Effective Management of Human Capital/Information Technology/ResourcesMission and Business ResultsInformation Management# of new or expanded service offerings+2+2TBD
172009Effective Management of Human Capital/Information Technology/ResourcesProcesses and ActivitiesCostscost per user supported$6977/user$7047/userTBD
182009Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsService Efficiency# users supported per ITSO staff71.7 users/ITSO staff71.7 users/ITSO staffTBD
192009Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsDelivery Time% of services that achieve SLA timeliness goals90%95%TBD
202009Effective Management of Human Capital/Information Technology/ResourcesTechnologyReliability% of time is available in accordance with SLA99.8%99.8%TBD
212010Effective Management of Human Capital/Information Technology/ResourcesMission and Business ResultsIT Infrastructure Maintenance# of new or expanded service offerings+2+2TBD
222010Effective Management of Human Capital/Information Technology/ResourcesProcesses and ActivitiesCostscost per user supported$7047/user$7047/userTBD
232010Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsService Efficiency# users supported per ITSO staff71.7 users/ITSO staff71.7 users/ITSO staffTBD
242010Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsDelivery Time% of services that achieve SLA timeliness goals95%95%TBD
252010Effective Management of Human Capital/Information Technology/ResourcesTechnologyReliability% of time is available in accordance with SLA99.8%99.8%TBD
262011Effective Management of Human Capital/Information Technology/ResourcesMission and Business ResultsInformation Management# of new or expanded service offerings+2+2TBD
272011Effective Management of Human Capital/Information Technology/ResourcesProcesses and ActivitiesCostscost per user supported$7047/user$7047/userTBD
282011Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsService Efficiency# users supported per ITSO staff71.7 users/ITSO staff71.7 users/ITSO staffTBD
292011Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsDelivery Time% of services that achieve SLA timeliness goals95%95%TBD
302011Effective Management of Human Capital/Information Technology/ResourcesTechnologyReliability% of time is available in accordance with SLA99.8%99.8%TBD
312012Effective Management of Human Capital/Information Technology/ResourcesMission and Business ResultsInformation Management# of new or expanded service offerings+2+2TBD
322012Effective Management of Human Capital/Information Technology/ResourcesProcesses and ActivitiesCostscost per user supported$7047/user$7047/userTBD
332012Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsService Efficiency# users supported per ITSO staff71.7 users/ITSO staff71.7 users/ITSO staffTBD
342012Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsDelivery Time% of services that achieve SLA timeliness goals95%95%TBD
352012Effective Management of Human Capital/Information Technology/ResourcesTechnologyReliability% of time is available in accordance with SLA99.8%99.8%TBD
362013Effective Management of Human Capital/Information Technology/ResourcesProcesses and ActivitiesCosts# of new or expanded service offerings+2+2TBD
372013Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsService Efficiencycost per user supported$7047/user$7047/userTBD
382013Effective Management of Human Capital/Information Technology/ResourcesCustomer ResultsDelivery Time# users supported per ITSO staff71.7 users/ITSO staff71.7 users/ITSO staffTBD
392013Effective Management of Human Capital/Information Technology/ResourcesTechnologyReliability% of services that achieve SLA timeliness goals95%95%TBD

Enterprise Architecture


In order to successfully address this area of the business case and capital asset plan you must ensure the investment is included in the agency's EA and Capital Planning and Investment Control (CPIC) process, and is mapped to and supports the FEA. You must also ensure the business case demonstrates the relationship between the investment and the business, performance, data, services, application, and technology layers of the agency's EA.
1. Is this investment included in your agency's target enterprise architecture?
yes
2. Is this investment included in the agency's EA Transition Strategy?
yes
2.a. If yes, provide the investment name as identified in the Transition Strategy provided in the agency's most recent annual EA Assessment.
CDC Information Technology Infrastructure
3. Is this investment identified in a completed (contains a target architecture) and approved segment architecture?
no
4. Identify the service components funded by this major IT investment (e.g., knowledge management, content management, customer relationship management, etc.). Provide this information in the format of the following table. For detailed guidance regarding components, please refer to http://www.whitehouse.gov/omb/egov/.

Component: Use existing SRM Components or identify as NEW. A NEW component is one not already identified as a service component in the FEA SRM.

Reused Name and UPI: A reused component is one being funded by another investment, but being used by this investment. Rather than answer yes or no, identify the reused service component funded by the other investment and identify the other investment using the Unique Project Identifier (UPI) code from the OMB Ex 300 or Ex 53 submission.

Internal or External Reuse?: Internal reuse is within an agency. For example, one agency within a department is reusing a service component provided by another agency within the same department. External reuse is one agency within a department reusing a service component provided by another agency in another department. A good example of this is an E-Gov initiative service being reused by multiple organizations across the federal government.

Funding Percentage: Please provide the percentage of the BY requested funding amount used for each service component listed in the table. If external, provide the funding level transferred to another agency to pay for the service.
RowAgency Component NameAgency Component DescriptionService TypeComponentReused Component NameReused UPIInternal or External Reuse?Funding %
1Digital Signature ManagementDefines the set of capabilities that guarantee the unaltered state of a file.Security ManagementDigital Signature Management  No Reuse5
2Identification and AuthenticationDefines the set of capabilities that support obtaining information about those parties attempting to log on to a system or application for security purposes and the validation of those users.Security ManagementIdentification and Authentication  No Reuse5
3Access ControlAccess Control - Support the management of permissions for logging onto a computer, application, service, or network; includes user management and role/privilege management.Security ManagementAccess Control  No Reuse3
4Video ConferencingDefines the set of capabilities that support video communications sessions among people who are geographically dispersed.CommunicationVideo Conferencing  No Reuse3
5System Resource MonitoringDefines the set of capabilities that support the balance and allocation of memory, usage, disk space and performance on computers and their applications.Systems ManagementSystem Resource Monitoring  No Reuse5
6EmailDefines the set of capabilities that support the transmission of memos and messages over a network.CollaborationEmail  No Reuse10
7Data ExchangeDefines the set of capabilities that support the interchange of information between multiple systems or applications; includes verification that transmitted data was received unaltered.Data ManagementData Exchange  No Reuse5
8Network ManagementDefines the set of capabilities that monitor and maintain a communications network in order to diagnose problems, gather statistics and provide general usage.Organizational ManagementNetwork Management  No Reuse15
9Call Center ManagementDefines the set of capabilities that handle telephone sales and/or service to the end customer.Customer Relationship ManagementCall Center Management  No Reuse5
10Voice CommunicationsDefines the set of capabilities that provide telephony or other voice communicationsCommunicationVoice Communications  No Reuse10
5. To demonstrate how this major IT investment aligns with the FEA Technical Reference Model (TRM), please list the Service Areas, Categories, Standards, and Service Specifications supporting this IT investment.

FEA SRM Component: Service Components identified in the previous question should be entered in this column. Please enter multiple rows for FEA SRM Components supported by multiple TRM Service Specifications.

Service Specification: In the Service Specification field, Agencies should provide information on the specified technical standard or vendor product mapped to the FEA TRM Service Standard, including model or version numbers, as appropriate.
RowSRM Component>Service AreaService CategoryService StandardService Specification (i.e., vendor and product name)
1Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / Standards62.5 micron multi-mode fiber
2Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsACF/NCP V7R5
3Video ConferencingService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsAllied network media converter
4Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsATM Switch, Cisco
5EmailService Access and DeliveryAccess ChannelsWireless / PDABlackberry
6Access ControlComponent FrameworkPresentation / InterfaceStatic DisplayBlueZone Access Server
7System Resource MonitoringService Platform and InfrastructureSupport PlatformsPlatform DependentCA90S
8Data ExchangeService Access and DeliveryAccess ChannelsCollaboration / CommunicationsCaptaris RightFax
9Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsCategory 6 cable
10Access ControlComponent FrameworkSecuritySupporting Security ServicesCheck Point Firewall
11Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsCisco Catalyst Operating System
12Access ControlComponent FrameworkSecuritySupporting Security ServicesCISCO Firewall services module
13Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsCisco IOS
14Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsCisco Network switch
15Access ControlComponent FrameworkSecuritySupporting Security ServicesCisco PIX Firewall
16Access ControlService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsCisco Universal Access Server
17EmailService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsCitrix Systems
18Data ExchangeService Platform and InfrastructureDatabase / StorageStorageEMC Centera
19Identification and AuthenticationComponent FrameworkSecuritySupporting Security ServicesGSI LANguard
20Network ManagementComponent FrameworkSecuritySupporting Security ServicesIIS Internet Scanner vulnerability analysis
21Network ManagementService Platform and InfrastructureHardware / InfrastructureWide Area Network (WAN)Integrated Services Digital Network (ISDN) - Core Aspects of Frame Protocol for Use with Frame Relay Bearer Service
22Video ConferencingService Access and DeliveryAccess ChannelsOther Electronic ChannelsIPTV
23System Resource MonitoringService Platform and InfrastructureSoftware EngineeringSoftware Configuration ManagementMicrosoft Systems Management Server
24EmailService Platform and InfrastructureSupport PlatformsPlatform DependentMicrosoft Windows 2003 Server
25Network ManagementService Platform and InfrastructureSupport PlatformsPlatform IndependentNetCool Service Management
26Network ManagementService Platform and InfrastructureSupport PlatformsPlatform IndependentNetIQ
27Network ManagementService Platform and InfrastructureSupport PlatformsPlatform DependentNetOp
28Voice CommunicationsService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsNortel Communciation Server 1000E
29Voice CommunicationsService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsNortel PBX
30Call Center ManagementService Platform and InfrastructureSupport PlatformsPlatform IndependentPeregrine
31Video ConferencingService Platform and InfrastructureHardware / InfrastructureVideo ConferencingPolycom Viavideo
32Video ConferencingService Platform and InfrastructureHardware / InfrastructureVideo ConferencingPolycom Video Conference Switch
33System Resource MonitoringService Platform and InfrastructureSupport PlatformsPlatform DependentRMF
34Digital Signature ManagementComponent FrameworkSecurityCertificates / Digital SignaturesRSA SecurID Key Fobs
35Network ManagementService Platform and InfrastructureSupport PlatformsPlatform DependentServer, Configuration Management
36System Resource MonitoringService Platform and InfrastructureSupport PlatformsPlatform DependentServer, Event Log Management
37Network ManagementService Platform and InfrastructureHardware / InfrastructureWide Area Network (WAN)SONET, Bellsouth
38Data ExchangeService Platform and InfrastructureDatabase / StorageStorageStorage, EMC
39System Resource MonitoringService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsSwitch, Server Monitoring
40Network ManagementService Access and DeliveryService TransportSupporting Network ServicesT1
41Network ManagementService Access and DeliveryService TransportSupporting Network ServicesT3
42Data ExchangeService Platform and InfrastructureHardware / InfrastructurePeripheralsTape Drive, 9940B, StorageTek
43Data ExchangeService Platform and InfrastructureHardware / InfrastructurePeripheralsTape Drive,1600/6250 bpi, IBM
44Data ExchangeService Platform and InfrastructureHardware / InfrastructurePeripheralsTape, Automated Library
45Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsVisara Concentrator
46System Resource MonitoringComponent FrameworkSecuritySupporting Security ServicesWatchfire AppScan
47Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsWireless Networking Infrastructure, 3ETI
48Network ManagementService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsWireless, Common Carrier
6. Will the application leverage existing components and/or applications across the Government (i.e., FirstGov, Pay.Gov, etc)?
yes
6.a. If yes, please describe.
This investment leverages: Federal Health Architecture (FHA), IT Infrastructure Optimization Line of Business, Internet Protocol Version 6 (IPv6). Yes, this investment will host existing applications across the Government, specifically HHS applications such as EHRP, UFMS (which aligns with the Presidential initiative for financial management), standard HHS Tier-1 Helpdesk, HHS.Net, and standard HHS E-mail system. The IT infrastructure will support or will integrate with all of these applications by providing the hardware/software platforms necessary to process the application, develop the applications, or process the applications. Additionally, as an OMB approved Restructured Organization (HPO), the infrastructure must function and is functioning as efficiently as possible. Further, this initiative complies with teh Federal Health Architecture, leveraging the Consolidated Health Informatics standards, the IT Infrastructure Line of Business standards, and the IT Security Line of Business and Nist security standards. Effective use of government funding is demonstrate by our ability to reduce the cost per customer supported and the ability to continue to expand service offerings, to maintain service timeliness and availability as our annual budget decreases.

PART THREE


RISK


You should perform a risk assessment during the early planning and initial concept phase of the investment's life-cycle, develop a risk-adjusted life-cycle cost estimate and a plan to eliminate, mitigate or manage risk, and be actively managing risk throughout the investment's life-cycle.

Answer the following questions to describe how you are managing investment risks.
1. Does the investment have a Risk Management Plan?
yes
1.a. If yes, what is the date of the plan?
2007-07-13
1.b. Has the Risk Management Plan been significantly changed since last year's submission to OMB?
no

COST & SCHEDULE


1. Was operational analysis conducted?
yes
1.a. If yes, provide the date the analysis was completed.
2007-06-30
What were the results of your operational analysis?
Performance was acceptable as determined meeting or exceeding all by key performance indicators (KPIS) and indicated no reason to discontinue steady state. ITSO's Restructuring initiative (HPO) established a series of performance metrics with KPIs and additional performance measures that are used to ensure designated quality, availability, and timeliness of services while achieving operational efficiencies. The Restructuring Initiative established a foundation for a comprehensive service level agreement (SLA) for the range of services. The SLA covers the major services offerings categories: Application Server Hosting, Customer Service, E-Mail, Directory Services, IT Infrastructure Security, Mainframe, Networking PC Hardware/software, Remote Access Telecommunications and Videoconferencing. The accountability of the initiative is based on the KPIs which include: Cost per customer/year; Customers supported/ITSO staff; Provision of new/expanded service offerings; Customer satisfaction; Service timeliness; and Service availability. The 3rd quarter FY07 report shows all KPIs exceeded the goals. Cost per customer/year: Goal=$6601, Actual=$5686; Customers supported/ITSO staff: Goal=68.1, Actual=73.5; Provision of new/expanded service offerings: Goal=+2, Actual=+6; Customer satisfaction (% of customers indicating good or excellent service provided): Goal=70%, Actual=83.6%; Service timeliness (%of services that achieve SLA timeliness goals): Goal=80%, Actual=100%; and Service availability (1-(person-hrs outage/total person-hours)): Goal=99.8%, Actual=99.93%.