Department of Labor Seal photos representing the workforce - digital imagery© copyright 2001 photodisc, inc.
Department of Labor Seal www.osha.gov  [skip navigational links] Search    Advanced Search | A-Z Index
eTools Home : Lockout/Tagout Standard | Preamble | Directive | Interps | Case Law | Viewing / Printing Inst. | Credits
lock Lockout/Tagout
LOTO HomeTutorialHot TopicsInteractive Case StudiesAbout This Tool
 
 Links to other
 Web sites with
 information on
 LOTO
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Tutorial

Additional Training (Tagout System)

What additional training is required when tagout systems are used?

Employers must train employees in the following limitations of tags
[29 CFR 1910.147(c)(7)(ii)]:
  • Tags are essentially warning devices affixed to energy isolating devices and do not provide the physical restraint on those devices that is provided by a lock
    [29 CFR 1910.147(c)(7)(ii)(A)].
  • When a tag is attached to an energy isolating means, it is not to be removed without authorization of the authorized person responsible for it, and it is never to be bypassed, ignored, or otherwise defeated [29 CFR 1910.147(c)(7)(ii)(B)].
  • Tags and their means of attachment must be made of materials which will withstand the environmental conditions encountered in the workplace
    [29 CFR 1910.147(c)(7)(ii)(D)].
  • Tags may evoke a false sense of security and their meaning needs to be understood as part of the overall energy control program
    [29 CFR 1910.147(c)(7)(ii)(E)].
  • Tags must be securely attached to energy isolating devices so that they cannot be inadvertently or accidentally detached during use
    [29 CFR 1910.147(c)(7)(ii)(F)].

Go Togray rule
bullet Overview
bullet Scope and Application
bullet Purpose
bullet Definitions
bullet Energy Control Program
bullet Energy Control Procedures
   - Documentation
bullet Energy Control Procedures
   - Required Content
bullet Periodic Inspection
bullet Employee Training and
   Communication
bullet Additional Training  (Tagout System)
  
bullet Employee Retraining
bullet Lockout/Tagout
bullet New or Modified Equipment
bullet Full Employee Protection
bullet Materials and Hardware
bullet Application of Energy Control
bullet Release from Lockout/Tagout
bullet Testing of Machines
bullet Outside Personnel (Contractors)
bullet Group Lockout/Tagout
   Requirements
bullet Shift & Personnel Changes

gray rule
  LOTO Home | Tutorial | Hot Topics | Case Studies | About This Tool | Credits

eTools Home : Lockout/Tagout Standard | Preamble | Directive | Interps | Case Law | Viewing / Printing Inst. | Credits
 
Back to TopBack to Top www.osha.gov www.dol.gov

Contact Us | Freedom of Information Act | Customer Survey
Privacy and Security Statement | Disclaimers
Occupational Safety & Health Administration
200 Constitution Avenue, NW
Washington, DC 20210
Page last updated: 03/17/2008