Keel Laying Ceremony for First NSC | ||
USCG Bertholf Takes Shape | ||
First NSC Prepares for Christening | ||
USCG Bertholf Christening | ||
USCG Bertholf Nears Completion | ||
USCG Bertholf at Sea |
Cutter Waesche Takes Shape | ||
Cutter Waesche Prepares for Christening |
Re-enginged HH-65C Helicopters Delivered |
MRS Construction and First Flight | ||
MRS Mission System Pallet Integration |
Long Range Surveillance |
Launching of the RB-M 45601 |
In-Water Testing of the 45601 |
Shipment of the 45601 |
Interior of the 45601 |