CVC Construction Summary Photos -- Week of 5/21/2007
Please click on the photo to enlarge the image
 
View of the Capitol Dome through the south skylight in the Great Hall
Even from 35 feet below ground, on the floor of the CVC's Great Hall, visitors will be able to see the Capitol Dome in full view.
The painting in the Virtual Senate Theater is complete
The faux marble painting is complete on the decorative columns and plaster elements in the Virtual Senate Theater in the CVC Exhibition Hall.
 
CVC Construction Summary Photos -- Week of 5/14/2007
Please click on the photo to enlarge the image
 
Photo taken from the top of the Jefferson building dome
This photo taken on Friday, May 7, 2007 from the top of the Jefferson Building dome shows the exterior features of the CVC.
Masons install sandstone in the third floor of the East Front
A mason installs a decorative piece of sandstone near the ceiling of the third floor within the East Front of the Capitol.
 
CVC Construction Summary Photos -- Week of 5/7/2007
Please click on the photo to enlarge the image
 
Workers secure drywall to the ceiling grid inside one of the CVC's two gift shops
Workers secure drywall to the ceiling grid inside one of the CVC's two gift shops.
Inside the CVC Exhibition Hall, a painter applies a faux marble finish to columns inside the Virtual House Theater
Inside the CVC Exhibition Hall, a painter applies a faux marble finish to columns inside the Virtual House Theater.
 
CVC Construction Summary Photos -- Week of 4/30/2007
Please click on the photo to enlarge the image
 
In the CVC Exhibition Hall, a painter applies a faux marble finish to molding in the Virtual Senate Theater
In the CVC Exhibition Hall, a painter applies a faux marble finish to ornamental molding in the Virtual Senate Theater.
A welder secures two pieces of metal railing in the Senate Expansion Space
A welder secures two pieces of metal railing for a spiral staircase in the Senate Expansion Space.
Workers install 12-foot-high bronze doors at the CVC's north entrance zone
Workers install 12-foot-high bronze doors at the CVC's north entrance zone.
 
CVC Construction Summary Photos -- Week of 4/23/2007
Please click on the photo to enlarge the image
 
Workers level off newly placed concrete for the north pedestrian ramp
Workers level off newly placed concrete for the north pedestrian ramp.
Millwork installation is progressing on both levels in the Congressional Auditorium
Millwork installation is progressing on both levels in the Congressional Auditorium.
A curving upper level wall at the front of the Congressional Auditorium
A curving upper level wall at the front of the Congressional Auditorium houses the bulk of the theater's robust speaker system.
 
CVC Construction Summary Photos -- Week of 4/16/2007
Please click on the photo to enlarge the image
 
Workers install a glass panel on the south side of the East Front Carriageway
Workers install a thick glass panel to a steel support structure on the south side of the East Front Carriageway.
Work continues in the Virtual Senate Theater
In the CVC Exhibition Hall, a worker installs a pre-fabricated plaster panel to a wall inside the Virtual Senate Theater.
Worker installing a lamppost
A worker installs a glass fixture to a newly installed lamppost on the East Front Plaza.
 
CVC Construction Summary Photos -- Week of 4/9/2007
Please click on the photo to enlarge the image
 
Virtual House Theater in Exhibition Hall
In the CVC Exhibition Hall, plaster columns and ceiling details are nearly complete in the Virtual House Theater.
A mason setting stone in one of two CVC gift shops
A mason continues setting stone in one of two CVC gift shops.
North CVC Entrance Zone
The CVC entrance zones are now being cleared and graded to make way for final sidewalk work, landscaping, installation of lampposts and other restoration activities, which will occur into the summer.
 
CVC Construction Summary Photos -- Week of 3/26/2007
Please click on the photo to enlarge the image
 
The transition zone between the CVC entrance lobby and the Congressional Auditorium
Stone walls and stone steps, decorative light fixtures and bronze hand railings ornament this transition zone between the CVC entrance lobby and the Congressional Auditorium.
Wood doors at the top of the North and Orientation Theater
Wood doors have been installed at the top of the North and South Orientation Theaters.
Masons install a sandstone column in the CVC Gift Shop
Masons install a sandstone column in the CVC Gift Shop.
 
CVC Construction Summary Photos -- Week of 3/19/2007
Please click on the photo to enlarge the image
 
Aerial photo of the CVC project site as it appeared Wednesday, March 14, 2007
Aerial photo of the CVC project site as it appeared Wednesday, March 14, 2007.
Masons are nearly complete with stonework at the face of the CVC entrance zone
Masons are nearly complete with stonework at the face of the CVC entrance zone.
 
CVC Construction Summary Photos -- Week of 3/12/2007
Please click on the photo to enlarge the image
 
Masons set floor stone in a lobby at the base of the transition zone
Masons set floor stone in a lobby at the base of the transition zone (center of photo) between the CVC and the Capitol.
Bronze railings, millwork, and stone work are complete in the North Orientation Theater
Bronze railings, millwork, and stone work are complete in the North Orientation Theater.
A gravel bed has been placed along the north entrance ramp
A gravel bed has been placed along the north entrance ramp in preparation for the placement of an aggregate concrete sidewalk.
 
CVC Construction Summary Photos -- Week of 3/5/2007
Please click on the photo to enlarge the image
 
Masons set floor stone in one of the CVC's two gift shops
Masons set floor stone in one of the CVC's two gift shops, which are located on the visitor out-flow corridors on the upper level.
Workers set a glass floor panel on a steel grid inside the CVC Exhibition Hall
Workers set a glass floor panel on a steel grid inside the CVC Exhibition Hall.  The panels will be illuminated from below, providing a soft glow around the central Wall of Aspirations.
Masons install sandstone blocks
Masons install new sandstone that now flanks the original 1824 sandstone inside the East Front Extension of the Capitol.
 
CVC Construction Summary Photos -- Week of 2/26/2007
Please click on the photo to enlarge the image
 
A spiral staircase winds down through all three floors of the Senate Expansion Space
A spiral staircase winds down through all three floors of the Senate Expansion Space.  The House Expansion Space features a similar staircase.
A carpenter installs cabinetry components in the Food Service Area
In the CVC's Food Service Area, a carpenter installs cabinetry components.
Stone masons set marble in an atrium space near the Congressional Auditorium
A mason guides a large block of granite into position near the CVC's south side entrance zone.
 
CVC Construction Summary Photos -- Week of 2/20/2007
Please click on the photo to enlarge the image
 
A worker positions an escalator truss into place within the East Front transition zone
A worker uses a forklift to position an escalator truss into place within the East Front transition zone between the Capitol and the CVC.
A mason aligns a block of sandstone to a wall inside the East Front
A mason aligns a block of sandstone to a wall inside the East Front of the Capitol.
 
CVC Construction Summary Photos -- Week of 2/5/2007
Please click on the photo to enlarge the image
 
A worker vacuums newly laid carpeting in one of the Food Service seating areas
A worker vacuums newly laid carpeting in one of the Food Service seating areas.
Workers measure connections points for a bronze railing in the Great Hall
Near a stair leading to the Great Hall, workers measure connections points for a bronze railing.
Stone masons set marble in an atrium space near the Congressional Auditorium
Stone masons set Tennessee Valley marble in a basket-weave pattern in an atrium space near the Congressional Auditorium.
 
CVC Construction Summary Photos -- Week of 1/29/2007
Please click on the photo to enlarge the image
 
A worker installs a seat cushion for a chair inside the North Orientation Theater
A worker installs a seat cushion for a chair inside the North Orientation Theater.
Workers set a 500-pound glass floor panel to a support grid in the CVC's Exhibition Hall
With the aid of an electronic suction machine, workers set a 500-pound glass floor panel to a steel support grid in the CVC's Exhibition Hall.
 
CVC Construction Summary Photos -- Week of 1/22/2007
Please click on the photo to enlarge the image
 
Workers install carpet in the North Orientation Theater
Workers install carpet in the North Orientation Theater.
A stone mason sets a block of granite to the wall along the north entrance ramp
A stone mason sets a block of gray granite to the retaining wall along the CVC's north entrance ramp.
Floor below the "Wall of Aspirations"
Below the marble "Wall of Aspirations" in the Exhibition Hall, a steel framework is ready to receive thick glass floor panels, which will be illuminated from below.
 
CVC Construction Summary Photos -- Week of 1/15/2007
Please click on the photo to enlarge the image
 
Inside the North Orientation Theater, carpet installers lay padding for carpeting
Inside the North Orientation Theater, carpet installers lay padding for carpeting on the uppermost seat tier.
A stone mason lays tile in the Food Service servery area
A stone mason lays tile in the Food Service servery area.
Workers assemble some of the steel support structure for one of two glass walls that will enclose the central carriageway below the East Front Center Steps
Workers assemble some of the steel support structure for one of two glass walls that will enclose the central carriageway below the East Front Center Steps.
 
CVC Construction Summary Photos -- Week of 1/8/2007
Please click on the photo to enlarge the image
 
Workers place concrete for a curving retaining wall that will be lined with granite stone
At the eastern end of the CVC project site, workers place concrete for a curving retaining wall that will be lined with granite stone.
Workers install a bronze railing to a staircase in the Great Hall
Workers install a bronze railing to a staircase in the Great Hall.

 

Architect of the Capitol · Feedback Form