Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Dataweb
Title:
Delta-Mendota Canal 2008 Approval of One-Year Temporary Warren Act Contracts for the Conveyance of Non-CVP Water 2008
Site:
Summary:
Reclamation proposes to issue one-year temporary Warren Act Contracts to requesting Central Valley Project (CVP) contractors within the Delta Division and San Luis Unit (limited to those listed below) for a combined total of up to 50,000 AF for the 2008 contract year ending February 28, 2009 for the delivery of non-CVP water in the Delta-Mendota Canal (DMC). Conveyance of non-CVP water under a Warren Act Contract would be subject to available capacity. The source of non-CVP water would be contractors' groundwater pumping. The contractors would pump groundwater from wells close to the DMC directly into the DMC.

Status:
04/15/2008:
Draft EA/FONSI released for a 30-day public review on January 25, 2008. Comments are due February 24, 2008. FONSI signed and final EA completed March 10, 2008.

Contacts:
Patti  Clinton
Phone: 559-487-5127
Fax: 559-487-5397

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Signed FONSI,DMC Warren Act Contract 2008 .pdf 351.37KB 
File with .pdf extension Final EA, DMC Warren Act Contract 2008 .pdf 3,274.75KB 
File with .pdf extension Draft FONSI, DMC Warren Act Contract 2008 .pdf 24.35KB 
File with .pdf extension Draft EA, DMC Warren Act Contract 2008 .pdf 3,271.08KB