Table
2-2. BNL Pollution Prevention, Waste Reduction, and Recycling Programs. |
|
|
|
|
|
|
WASTE DESCRIPTION |
TYPE OF PROJECT |
POUNDS REDUCED, REUSED, RECYCLED
OR CONSERVED IN 2007 |
WASTE TYPE |
POTENTIAL COSTS FOR TREATMENT
& DISPOSAL |
COST OF RECYCLE, PREVENTION |
ESTIMATED COST SAVINGS |
PROJECT DESCRIPTION DETAILS * |
|
Aerosol can disposal system |
Recycling |
528 |
Hazardous waste |
$12,000 |
$0 |
$12,000 |
Empty aerosol cans can now are
recycled as scrap, rather then sent to the Waste Management Division as
hazardous waste. Eight units (F&O=5; CA=1; NSLS=1; BES =1) each handle 66
lbs of hazardous waste. |
|
Portable closed-head drum mixer |
Neutralization |
1,600 |
Hazardous waste |
$0 |
$1,450 |
-$1,450 |
The
National Synchrotron Light Source (NSLS) bought a closed drum mixer to
neutralize Rydlyme, used to descale cooling pipes. |
|
Relocation of hazardous storage
sheds |
Reuse |
3,200 |
Industrial waste |
$0 |
$500 |
$26,500 |
Recycled two hazardous storage
material sheds for reuse in Plant Engineering. Relocation cost $550, but
avoided the purchase of new sheds. |
|
Formaldetox |
Source reduction |
8 |
Non-hazardous
waste (neutralized approximately 1 gallon)
|
$25 |
$0 |
$25 |
Neutralizes nonhazardous
para-formaldehyde, chlorix, bleach, and rat blood. |
|
HPLC solvent recycler |
Reuse |
110 |
Hazardous waste |
$2,500 |
$0 |
$6,755 |
Allows reuse of approximately 50
liters of solvent and saves
approximately 50 labor hours. |
|
Propane cylinder de-valver |
Recycling |
50 |
Hazardous waste |
$3,750 |
$0 |
$3,750 |
The Collider Accelerator
Division (CA-D) bought a propane cylinder de-valver to avoid sending
cylinders to a disposal vendor at $75 each; instead they are now recycled as
scrap. |
|
Fluorescently labeled
oligonucleotides |
Waste minimization |
3,144 |
Radiological waste (396 ft3); Mixed waste (35 gallons);
Hazardous Waste (108 gallons) |
$67,600 |
$0 |
$67,600 |
This project was cost-shared
with Biology. The process avoids the use of radioactivity, thus avoiding
radiological waste generation. |
|
Electronic recycling |
Recycling |
140,600 |
E-waste |
N/A |
$2,300 |
N/A |
BNL e-waste was formerly
collected by a scrap metal dealer, but the recycling process was
questionable. The Laboraoty has now partnered with a government-based e-waste
recycler and now pays shipping fees only. |
|
Building demolition recycling |
Recycling |
12,350,000 |
Industrial waste |
$561,925 |
$32,000 |
$529,925 |
On-site demolition products
(steel and concrete) are segregated, recycled, and reused. |
|
System One parts cleaner |
Substitution |
640 |
Hazardous waste |
$10,000 |
$0 |
$10,000 |
Plant
Engineering bought a System One parts washer to re-distill dirty solvent,
eliminating the need for a vendor such as Safety Kleen. Removed grit and
sludge are mixed with the waste oil. |
|
Photon-counting
spectrofluorimeter |
Substitution |
54 |
Mixed waste (2 ft3) |
$0 |
$0 |
$50,000 |
Eliminated the need for
radioactive assays and thus their radioactive waste. Savings include 1,000
work-hours plus savings on material costs. |
|
Replacement of mercury utility
devices |
Substitution |
40 |
Mercury |
$2,350 |
$4,000 |
$2,350 |
Approximately 36 lb of
mercury-containing devices were removed from utility devices during 2007.
Savings are based on the cost of one mercury spill and cleanup. |
|
Animal bedding conveying system |
Composing |
|
Low-level Radiological Waste (76 yds3) |
$0 |
$0 |
$0 |
Animal bedding material is no
longer sent to sanitary landfill. It is now conveyed to a dumpster that is
emptied or composted at the stump dump. |
|
Plant Engineering grounds
vehicle wash system * |
Waste minimization |
8,000 |
Oils/grease to soils |
$16,000 |
$3,000 |
$13,000 |
This multi-year,
multi-department project was completed in 2007 and eliminates the potential
of oil and grease being released to soil. |
|
Organic solvents |
Substitution |
678 |
Hazardous waste |
$0 |
$0 |
$26,000 |
Life Sciences bought a Microwave
Peptide Synthesizer in 2004 to significantly reduce the hazardous wastes
generated. Saves ~1,000 work-hours/year (reflected in cost savings). |
|
Organic solvents |
Purification/reuse |
44 |
Hazardous waste |
$0 |
$0 |
$3,400 |
The
primary savings of the BES solvent purification system are in not purchasing
new solvent and labor savings from not running the stills. |
|
Cooling water |
Reuse |
63,400 |
Deionized water |
$0 |
$0 |
$7,925 |
A
closed-cycle water recycling system for the Building 480 melt spinner saved
7,925 gallons of ultra-pure water and extends the life expectancy of
equipment worth $100,000. |
|
Mercury utility devices |
Substitution |
37 |
Mercury |
$2,300 |
$0 |
$2,300 |
Plant Engineering replaced
mercury-containing utility devices with mercury-free equipment in 2007.
Savings are based on the cost of one mercury spill and cleanup. |
|
Radioactive emissions |
Emission reduction |
0 |
Radioactive emissions |
$0 |
$0 |
$0 |
A shroud was installed over the
16-inch diameter shaft in the Hot Cell of the Brookhaven Linac Isotope
Producer (BLIP), isolating cooling water from the rapidly moving air of the
exhaust system and allowing radiological decay within the water system. Slowing
the diffusion into the hot cell air will effectively reduce gaseous emissions
into the exhaust stack, as these radionuclides have very short half lives.
The shroud/enclosure has been instrumental in reducing short-lived
radioactive gaseous emissions. Beyond the environmental benefits associated
with the project and due to the efficiency of the enclosure in reducing
emissions, the facility has been able to stay below the emissions level that
would require additional regulatory burdens. |
|
Radioactive waste generated
through wet chemistry |
Waste minimization |
30 |
Mixed waste/Liquid radioactive
waste |
$17,600 |
$0 |
$22,500 |
The use of a Kinetic
Phosphorescence Analyzer (KPA) system for uranium analysis eliminated mixed
waste generation in a chemistry lab, reduced 90 percent of the volume of
liquid waste, reduced 90 percent of radioactive material handled, minimized
exposure to uranium by laboratory personnel, and decreased labor costs by 75
percent. |
|
Radioactive waste from labeled
chemicals |
Waste minimization/ volume
reduction |
0 |
Solid radioactive waste |
$2,168 |
$0 |
$2,168 |
A vial crusher for glass vials,
pipettes, and other glassware reduces the volume of rad waste. |
|
Radioactive and mixed wastes
from radio-labeled chemicals |
Waste minimization |
112 |
Mixed waste
|
$27,690 |
$0 |
$27,690 |
Use of a microplate
scintillation counter generates less mixed waste. |
|
Electrophoretic Mini-Gels |
Microscale chemical use |
2,200 |
Hazardous waste - lab pack |
$6,000 |
$0 |
$6,000 |
Minimizing silver waste from
silver-staining electrophoretic mini-gels saves waste disposal costs and
lowers material purchase costs ($6,000). |
|
Sewage sludge |
Volume reduction |
18,450 |
Radioactive waste |
$1,249,500 |
$47,738 |
$1,201,762 |
Disposal
of 110,000 gallons of radioactive Sewage Treatment Plant liquid waste by a
contractor would cost $1,249,500. Instead, waste from the anaerobic sludge
digester was dried on the drying tables (96 percent reduction), mixed with
absorbent and lime, and shipped in (21) 55-gallon drums to a disposal
facility. |
|
Film and other radioisotopic
imaging |
Substitution |
300 |
Hazardous waste/ Industrial
waste |
$22,000 |
$0 |
$22,000 |
Replacement
of film-based autoradiography and other radioisotopic imaging with a
Phosphor Imager reduced waste
generation by 200 lb of hazardous waste and 100 lb of industrial waste.
Additional projected savings are in annual supply costs and labor reduction. |
|
Lead acid
batteries |
Recycled |
5,000 |
Universal waste |
$0 |
$0 |
$0 |
Avoids hazardous waste disposal
costs for approximately 40 lb of lead per battery. |
|
Ion exchange wastewater |
Source reduction |
1250 |
Hazardous and sanitary
wastewater |
$0 |
$0 |
$0 |
Prefilters,
added to the deionization system, polish makeup water entering the ion
exchange system. This extends the useful life of the ion exchange resins,
requiring less frequent regeneration. The regeneration process generates
hazardous and sanitary waste. |
|
Short half-life waste |
Decay in storage |
490 |
Radioactive waste |
$0 |
$0 |
$0 |
Short half-life isotopes,
particularly iodine-125 and phosphorus-32, are often used in life sciences
experiments. In 2007, wastes from these operations (21.5 ft3 and 133 lbs of liquid) were managed in accordance with BNL
decay-in-storage requirements, rendering the wastes eligible for volumetric
release. |
|
Cooling Tower chemicals |
Source reduction |
9,563 |
Industrial waste |
$22,500 |
$0 |
$22,500 |
Ozone
water treatment units were installed on cooling towers at SEM, the National
Space Radiation Laboratory (NSRL), and the RHIC Reseach Facility, for
biological control of cooling water. These systems eliminate the need for
water treatment chemicals (typically toxic biocides), save labor, and reduce
analytical costs for monitoring cooling tower blowdown. |
|
Blasocut machining coolant |
Recycled/Reused |
19,456 |
Industrial waste |
$2,450 |
$0 |
$6,450 |
Central Shops Division operates
a recycling system that reclaims Blasocut machining coolant and supplies it
Laboratory-wide. In 2007, 2,432 gal (19,456 lb) of Blasocut lubricant were
recycled. Recycling involves aeration, centrifuge, and filtration. This
avoids cost of disposal as industrial waste plus an avoided cost of buying 5
drums of concentrate ($800/drum) and 49 empty drums for shipping ($50/drum). |
|
Used motor oil |
Energy recovery |
16,160 |
Industrial waste |
$2,050 |
$0 |
$2,050 |
Used motor oil from the motor
pool and the on-site gas station is given to Strebel's Laundry Service, who
use it to fire their boilers. In 2007, they collected 2,020 gal of oil at no
charge to BNL, which thus avoided the costs for disposal and 41 shipping
drums ($50/drum). |
|
Office paper |
Recycled |
354,000 |
Industrial waste |
$0 |
$0 |
$0 |
Cost avoidance based on $106/ton
for disposal as trash. |
|
Cardboard |
Recycled |
242,000 |
Industrial waste |
$0 |
$0 |
$0 |
Cost avoidance based on $106/ton
for disposal as trash. |
|
Scrap metal |
Recycled |
764,000 |
Industrial waste |
$57,300 |
$0 |
$57,300 |
Cost avoidance based on $106/ton
for disposal as trash, plus $150/ton revenue. |
|
Bottles/cans |
Recycled |
48,800 |
Industrial waste |
$0 |
$0 |
$0 |
Cost avoidance based on $106/ton
for disposal as trash. |
|
Construction debris |
Recycled |
574,000 |
Industrial waste |
$12,915 |
$0 |
$12,915 |
Cost avoidance based on $45/ton
difference for disposal as trash |
|
|
TOTALS |
14,627,944 |
|
$2,100,623 |
$90,988 |
$2,143,415 |
|
|
* Cost savings of projects funded
by the BNL Pollution Prevention Council will be tracked for 3 years. |
|
|
|
|
|
|
|
|
|
|
|