BUFFALO BILL POWERPLANT



Buffalo Bill Powerplant

Buffalo Bill Powerplant


Contact: Susan Kelly
Chief, Operations and Maintenance Division
Wyoming Area Office
P.O. Box 1630
Mills, WY 82644
Telephone Numbers: Office
Phone: (307) 261-5605
Fax: (307) 261-5683
E-Mail Address: skelly@gp.usbr.gov
Reclamation Region: Great Plains
NERC Region: Western Electricity Coordinating Council, Rocky Mountain Power Area
PMA Service Area: Western Area Power Administration, Rocky Mountain Region
Project Authorization: The Secretary of the Interior authorized the Shoshone Project on February 10, 1904, under authority of the Reclamation Act of June 17, 1902, and authorized Heart Mountain power development on June 19, 1945, under the provisions of the Reclamation Project Act of 1939.
Project Purposes: Floodwaters of the Shoshone River are stored in Buffalo Bill Reservoir for later release for irrigation and power generation. Power is developed at the Buffalo Bill, Spirit Mountain, Shoshone and Heart Mountain Powerplants. The system is interconnected with the West Division of the Pick-Sloan Missouri Basin Program.
Plant Purpose: Power produced on the project is fed into a grid system, which serves an area extending into three States.
Plant Facts: Buffalo Bill Dam began storing water in 1910. The dam and reservoir are located in a rugged scenic canyon adjacent to a main highway which leads into Yellowstone National Park.
Plant History: In 1992 construction was completed on the dam modification (which raised the dam 25 feet), the new powerplant, and the visitor's center.
Present Activities: A contract was completed in FY 2003 to furnish and install a new 15 kV vacuum circuit breaker to replace a failed and disconnected switch on the power transformer ring bus.
Future Planned Activities: None
Special Issues: None
River: Shoshone River
Plant Type: Conventional
Powerhouse Type: Above Ground
Turbine Type: Francis
Original Nameplate Capacity: 18,000 kW
Installed Capacity: 18,000 kW
Year of Initial Operation: 1992
Age: 13 years
Net Generation:
(FY 2005)
56,288,100 kWh
Rated Head: 266 feet
Plant Factor:
(FY 2005)
35.91 percent
Remotely Operated: Yes
Production Mode: Intermediate


Click here for graphs and charts of Buffalo Bill Powerplant performance.

Click here for information on the Buffalo Bill Dam.

Click here for information on the Shoshone Project.




Revised December 30, 2005            Hydropower Site Map             Help