Text Size: A+| A-| A   |   Text Only Site   |   Accessibility
Current Projects
Central Distribution Center (CDC)
Cold Box Compressor Replacement
Project Manager: Jim Poore
 
Freezer Refrigeration Unit Upgrade
Project Manager: Jim Poore
 
Install Overhead Door Safety Restraints
Project Manager: Paul Stanley
 
Central Distribution Center (CDC)

Coffee Creek Correctional Institution (CCCF)
Facility Expansion-Minimum/Medium
Project Manager: Jim Poore
 
Wireless Radio System Upgrade-EDACS/IP
Project Manager: Wayne Siver
 
Repave Roadway After Expansion Construction
Project Manager: Jim Poore
 
Coffee Creek Correctional Institution (CCCF)
 
 

Columbia River Correctional Institution (CRCI)
Standby Generator Upgrade
Project Manager: Mark Ong
 
Facility Structure Settlement Investigation
Project Manager: Paul Stanley
 
Columbia River Correctional Institution (CRCI)

Deer Ridge Crrectional Institution (DRCI)
New Prison Construction Team
Project Manager: Doug Young
 
Deer Ridge Crrectional Institution (DRCI)

Eastern Oregon Correctional Institution (EOCI)
Powerhouse to City of Pendleton Sewer Upgrade
Project Manager: Dan Howard
 
HVAC Replacement
Project Manager: Dan Howard
 
Rebuild Entry Headers
Project Manager: Dan Howard
 
Asbestos Removal
Project Manager: Dan Howard
 
Eastern Oregon Correctional Institution (EOCI)

Mill Creek Correctional Facility (MCCF)
Boiler Blowdown and Separartion Installation
Project Manager: Vern Rowan
 
HVAC Replacement
Project Manager: Paul Stanley
 
Monitoring Wells Decommission
Project Manager: Jim Poore
 
Mill Creek Correctional Facility (MCCF)

Oregon State Correctional Institution (OSCI)
Fire Protection Sprinkler System Installation
Project Manager: TBD
 
Asbestos Removal
Project Manager: Dan Howard
 
Floor Drains Reroute
Project Manager: Paul Stanley
 
Install and Upgrade Fire Alarm System
Project Manager: Mike Clayton
 
Install Additional Fire Sprinkler System
Project Manager: Paul Stanley
 
City of Salem SDC Connection
Project Manager: TBD
 
Boiler HMI Upgrade
Project Manager: Mike Clayton
 
Housing Unit #4-Door Control Upgrade
Project Manager: Mike Clayton
 
OCE Electrical Distribution Design
Project Manager: Mark Ong
 
Oregon State Correctional Institution (OSCI)
 
 

Oregon State Penitentiary (OSP)
Primary Electrical System Upgrade
Project Manager: Stephen Poage
 
Culinary Ventilation System Upgrade
Project Manager: TBD
 
Support Boilerhouse Vent Stacks
Project Manager: TBD
 
Innerconnect of Facility Fire Alarm System
Project Manager: Mike Clayton
 
Replacement of Restroom and Shower Floors
Project Manager: Paul Stanley
 
HVAC Replacements
Project Manager: Paul Stanley
 
Washpad Upgrade
Project Manager: Paul Stanley
 
Asbestos Removal
Project Manager: Dan Howard
 
Sidewalk Replacements
Project Manager: Paul Stanley
 
Parking Area Lighting Upgrade
Project Manager: Mark Ong
 
Parking Lots & Roadways Repaving
Project Manager: Paul Stanley
 
Oregon State Penitentiary (OSP)
 
 

Oregon State Penitentiary Minimum (OSPm)
Asbestos Removal
Project Manager: Dan Howard
 
Oregon State Penitentiary Minimum (OSPm)
 

Powder River Correctional Facility (PRCF)
PVC Domestic Water Pipe Replacement
Project Manager: Dan Howard
 
Powder River Correctional Facility (PRCF)

Santiam Correctional Institution (SCI)
Boiler Removal
Project Manager: Jim Poore
 
Rooftop Gas Pack Installation
Project Manager: Jim Poore
 
Roof Repair
Project Manager: Paul Stanley
 
Culinary Floor Repair
Project Manager: Paul Stanley
 
Santiam Correctional Institution (SCI)

Shutter Creek Correctional Institution (SCCI)
Above-Ground Gas Storage Tank Replacement
Project Manager: Paul Stanley
 
SCWC Building Remodel
Project Manager: Paul Stanley
 
Shutter Creek Correctional Institution (SCCI)

South Fork Forest Camp (SFFC)
Sewer  & Water System Upgrade
Project Manager: Jim Poore
 
Cistren Access Road Rebuild
Project Manager: Paul Stanley
 
Cabins & Dining Hall Roof Replacement
Project Manager: Paul Stanley
 
South Fork Forest Camp (SFFC)

Snake River Correctional Institution (SRCI)
Fire Sprinkler Installation
Project Manager: Dan Howard
 
Wireless Radio System Upgrade-EDACS/IP
Project Manager: Wayne Siver
 
Snake River Correctional Institution (SRCI)
 
 

Two Rivers Correctional Institution (TRCI)
Boiler Fire Tube Replacement
Project Manager: Dan Howard
 
Generator Load Tests
Project Manager: Dan Howard
 
Two Rivers Correctional Institution (TRCI)
 

Warner Creek Correctional Facility (WCCF)
Culinary Floor Repair/Replacement
Project Manager: Paul Stanley
 
Warner Creek Correctional Facility (WCCF)

Statewide
Kitchen Exhaust System Upgrade
Project Manager: Dan Howard
 
DOC Firing Range
Project Manager: Jim Poore
 
Energy Conservation
Project Manager: Facilities Services
 

 
Page updated: August 25, 2008

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.