Cape Wind Draft Environmental Impact Statement (DEIS)
The
DEIS assesses the physical, biological and social/human impacts of the
proposed project and all reasonable alternatives, including action not taken
(i.e., the project is not built), in an objective fashion in order to
determine if the proposal is environmentally sound. A final decision will be
made, which will account for the regional, state and local benefits and
impacts as well as for the overall public interest of the United States. A
final approval will be granted only if, after consideration of both
environmental and non-environmental issues, the MMS finds that the proposed
action is in the public interest. The DEIS and mitigation development
discussion will be important factors in this final determination. Final
action on any MMS authorization would not occur until after the
environmental review is completed and all environmental issues have been
appropriately addressed. To obtain a single printed or CD-ROM copy of the
DEIS, e-mail
capewind@mms.gov.
(NOTE: this link takes you to the complete DEIS online. This
is a very large document which will take some time to load. Once open, use
the Table of Contents to navigate through the document.)
As a convenience to our customers, the links below are to the individual
sections and appendices contained within the DEIS. All DEIS files are in
Adobe's Portable Document File (PDF) format.