USGS - science for a changing world

Oregon Water Science Center

USGS Data Grapher

This is a data graphing utility that allows the user to build graphs of data from selected USGS stations. Select the station, the type of graph, the parameter(s) to plot, and the starting and ending dates for the graph. Then, click the button labeled "Make Graph."

To compare time series by month or year, try the Data Grapher by Year. To plot specialized XY plots from one site, use the XY Data Grapher. To plot data from two sites, use the Two-Site Data Grapher. To plot time series from three sites, use the Three-Site Data Grapher. To plot multiple graphs from a single site, try the Multiple-Parameter Data Grapher. For tables rather than graphs, go to the Data Tabler.

Note: I see that javascript is not currently enabled in your browser. That's okay -- the Data Grapher will work without javascript. I invite you to enable javascript for this page, however, because the Data Grapher interface utilizes javascript to clarify and simplify data input.

Step 1:

[Optional] Choose a basin from the drop-down list.

 

 
Step 2:

Choose a site from the drop-down list.

 

Columbia River at The Dalles, OR (14105700)
  Availability of Approved Data Date of
Parameter Begin Date End Date Last Reading
 Discharge   Dec-04-1997 17:00   Sep-30-2007 23:00   Sep-16-2008 19:00 
 Spill from Dam   Jan-01-1996 01:00       Sep-13-2008 16:00 
 Water Temperature   Mar-26-1997 04:00   Sep-30-2007 23:00   Sep-17-2008 01:00 
 Barometric Pressure   Mar-26-1997 04:00   Sep-30-2007 23:00   Sep-17-2008 01:00 
 Total Dissolved Gas   Mar-26-1997 04:00   Sep-30-2007 23:00   Sep-17-2008 01:00 
 Diss. Gas % Saturation   Mar-26-1997 04:00   Sep-30-2007 23:00   Sep-17-2008 01:00 
 Sensor Depth   Mar-26-1998 11:00   Sep-30-2007 23:00   Sep-17-2008 01:00 
 Measurements at this site are available here at 60 minute intervals.
 Spill from dam data are from the Corps of Engineers.
 Recent data are provisional and subject to revision.
 
Step 3:

Choose a graph type.
Time Series
XY Plot

 
Step 4:

Choose the parameters to plot. For an XY plot, the 2nd parameter will be on the X axis.

1st Parameter:
    Apply a -day running average.
 
2nd Parameter:
    Apply a -day running average.
 
Step 5:

Choose starting and ending dates for the data in the graph.

Begin Date: --   Include all data
End Date: --

 
Step 6:

Make the graph, or reset the form and try again.

  
Construction of the graph may take a minute or two.

 

Accessibility FOIA Privacy Policies and Notices

Take Pride in America logo USA.gov logo U.S. Department of the Interior | U.S. Geological Survey
URL: http://or.water.usgs.gov/cgi-bin/grapher/graph_setup.pl
Page Contact Information: Stewart Rounds
Page Last Modified: Monday - May 12, 2008 at 22:54:56 PDT