skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Mixed Oxide Fuel Facility
Licensing
Final Safety Evaluation
Construction Application
License Application
Hearing Process
Use of MOX Fuel in Power Reactors
Environmental Review
Quality Assurance Plan
Schedule
Public Involvement
Meetings
Contact Us
Related Information
Frequently Asked Questions
Mixed Oxide Fuel News
Standard Review Plan (NUREG-1718)
Backgrounder on Mixed Oxide Fuel

Licensing Schedule for the Mixed Oxide Fuel Fabrication Facility

The schedule in the following table is subject to change. It is based on the assumption that the Shaw AREVA MOX Services (MOX Services) application meets all applicable regulations.

Date Action
1/31/05 NRC issued the Final Environmental Impact Statement (NUREG-1767)
3/31/05 NRC issued the Final Safety Evaluation Report on the Construction Authorization Request for the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, SC (NUREG-1821)
3/30/05 NRC issued the Construction Authorization PDF Icon
9/27/06 & 11/16/06 MOX Services submits the License Application and the Integrated Safety Analysis Summary to possess and use radioactive material
12/20/06 NRC accepts license submittal for docketing
4/12/2007 Public meeting in Aiken, SC to discuss NRC’s role, responsibilities, and the licensing process; inspection and enforcement; and public participation related to the review of the License Application for the MFFF
12/20/10 NRC staff to complete review and prepare Safety Evaluation


Privacy Policy | Site Disclaimer
Tuesday, December 04, 2007