Home > Nuclear
Reactors > Operating
Reactors > Operational
Experience
> PWR Sump Performance
> Public Meetings for 2004
Public Meetings for 2004
This page lists, in reverse chronological order, the notices, slides
and summaries documenting the public meetings held concerning the pressurized-water
reactors (PWRs) sump performance issue (GSI-191). To learn about future
meetings, see our public
meeting schedule page.
Some links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS), and others are to documents
in Adobe Portable Document Format (PDF). ADAMS documents are provided in either
PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying
these formats, see our Plugins, Viewers, and
Other Tools page. If you have questions about search techniques or problems
with viewing or printing documents from ADAMS, please contact the Public
Document Room staff.
Date |
Description |
11/03/2004 |
Category 1 Meeting: Meeting with GE Nuclear
Energy (GENE) to discuss their active ECCS Sump screen design for
PWR plant designs
|
06/17/2004 |
Category 2 Meeting: Continued Discussion
of risk informed option for resolving GSI-191
|
05/25/2004 |
Category 2 Meeting: To discuss with NEI
an Optional Risk-Informed Approach for the Resolution of GSI-191 PWR
Sump Blockage Issue
|
05/20/2004 |
Telephone Conference: NRC staff held a telephone
conference, supported by their contractor Los Alamos National Laboratory,
with NEI to discuss the Baseline Section 3.0 of the PWR Containment
Sump Evaluation |
05/19/2004 |
Category 2 Meeting: To continue discussions
between the staff, NEI and industry regarding a risk-informed option
for resolving GSI-191, and to reach consensus on a path forward. |
05/19/2004 |
Category 2 Meeting: NEI will inform the
NRC Staff of their proposal for interim safety assessments for licensees
that complete a plant-specific evaluation.
|
05/19/2004 |
Category 3 Meeting: To discuss the draft
Generic Letter 2004-XX, "Potential Impact of Debris Blockage
on Emergency Recirculation During Design-Basis Accidents at Pressurized
Water Reactors." Answer stakeholders questions to clarify their
understanding of the draft Generic Letter prior to the stakeholders
submitting written comments within the 60day public comment period.
|
04/28/2004 |
Category 2 Meeting: To discuss integrated
chemical effects test plan and test facility that will be used to
conduct the tests. |
04/22/2004 |
Summary of GSI-191 Meeting of March 23
and 24, 2004, between NRC Staff and Stakeholders
|
03/23-24/2004 |
Category 2 Meeting: To discuss the draft
NEI PWR Containment Sump Evaluation Methodology, and the NRC comments
regarding the NEI PWR Containment Sump Evaluation Methodology.
|
01/22/2004 |
Category 2 Meeting: Discuss the WOG activities
regarding candidate operator actions for generic emergency response
guidelines and status of activities
|
01/08/2004 |
Category 2 Meeting: Discuss the chemical
effects test plan and potential facilities that will be used to
conduct the tests
|
|