Skip Navigation Minerals Management Service Minerals Management Service MMS Home pagesSearchMMS Topic IndexAbout MMSWhat’s New
Offshore Energy and Minerals Management
United States Department of the Interior

Offshore Energy and Minerals Management Home Page
National Notices to Lessees & Operators
spacer
Alaska Region Notices to Lessees & Operators
Gulf of Mexico OCS Region Notices to Lessees & Operators
Pacific OCS Region Notices to Lessees & Operators
Inactive National Notices to Lessees & Operators
spacer
Minerals Management Service Safety Alert
spacer

Content:
  
Kumkum Ray


Pagemasters:
   OEMM Web Team

spacer

 

NTL No. 93-2N

Effective Date: October 6, 1993


Notice to Lessees and Operators (NTL) of Federal Oil, Gas,
and Sulphur Leases in the Outer Continental Shelf

Liability of Assignors, Assignees, and Co-Lessees
for Plugging of Wells and Removal of Property on Termination
of an Outer Continental Shelf Oil and Gas Lease

This Notice to Lessees and Operators (NTL) is provided pursuant to the authority prescribed in 30 CFR §§ 250.4, Jurisdiction, and 256.1, Purpose. This NTL is also based upon the provisions of 30 CFR § 250.8, Designation of operator; 30 CFR Part 250, Subpart G, Abandonment of Wells, particularly provisions of §§ 250.110, General requirements, 250.112, Permanent abandonment, 250.114, Site clearance verification, and 250.143, Platform removal and location clearance; 30 CFR § 256.62, Assignment of leases or interests therein; and section 22 of the lease agreement which pertains to removal of property on termination of the lease.

Recent efforts by OCS lessees and operators seeking protection under Federal bankruptcy laws have resulted in colessees and previous lessees (assignors) being called upon to perform obligations that the designated operator or assignee was obliged to undertake under 30 CFR § 256.62(e), such as plugging lease wells.

The governing rules, including 30 CFR § 256.62, which were promulgated originally by Federal Register Notice dated June 29, 1979 (44 FR 38276), provide in subsection 256.62(d) and (e) that—

"(d) The assignor shall be liable for all obligations under the lease accruing prior to the approval of the assignment."

"(e) The assignee shall be liable for all obligations under the lease subsequent to the effective date of an assignment, and shall comply with all regulations issued under the Act."

The obligations to plug and abandon wells, remove platforms and other facilities, and to clear the seafloor of obstructions accrue when a well is drilled or used, a platform or other facility is installed or used, or an obstruction is created. These obligations continue until the procedures specified in 30 CFR Part 250, Subpart G, Abandonment of Wells, are followed.

Following MMS approval of the assignment of an OCS oil and gas lease, the assignor continues to be liable to DOI/MMS for the performance of these obligations with respect to wells, structures, or obstructions in existence and not plugged or removed at the time of the assignment.

The assignor and assignee may enter into agreements assigning responsibility for performance of lease abandonment and clearance, but Federal regulations rather than such agreements govern responsibility to DOI/MMS. The MMS looks first to the designated operator to perform these obligations. Should the operator be unable to perform the lessee's obligations to plug and abandon wells, remove platforms and other facilities, and clear the seafloor of obstructions, MMS will normally require any or all of the lessee(s) to perform the activities necessary to bring about compliance. If there is no lessee able to perform, MMS will require prior lessees who held the lease during or after the time when the facilities were installed or the obstructions created to perform those functions. The MMS is not authorized or funded to assume responsibility for these obligations.

(Sgd.) Tom Fry