COAXIAL TRANSPONDERS: Chief Scientist(s): Embley, NOAA (embley@new.pmel.noaa.gov) Position: 46° 19'N, 129° 45'W Bottom Depth: ?? Deployment: 24 June 1995 Recovery: 09 July 1995 Type: Alvin Ops. Interrogate: 9 Hz Respond: 11 Hz Ht. Above Bottom: 200 m Chief Scientist(s): Johnson, UW (johnson@ocean.washington.edu) Position: 46° 30'N, 129° 34'W Bottom Depth: ?? Deployment: 24 August 1995 Recovery: 09 September 1995 Type: Alvin Ops. Interrogate: 9 Hz Respond: 11 Hz Ht. Above Bottom: 200 m
Back to "Moorings, Arrays, & Transponders"