Preliminary Notification Reports
2008
2007
2006
2005
2004
2003

Preliminary Notification (PN) Reports for 2005

January · February · March · April · May · June · July · August · September · October · November · December

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

To top of page

December 2005

PNO-III-05-016D 03/15/2006 Braidwood/Exelon Generation Co.: Tritium Contamination Issues (4th Update)
PNO-III-05-016C 02/03/2006 Exelon Generation Co. Braidwood: Potential Off-Site Migration of Tritium Contamination (3rd Update)
PNO-III-05-016B 01/18/2006 Braidwood 1 and 2: Potential Off-Site Migration of Tritium Contamination (2nd Update)
PNO-I-05-031 12/29/2005 Cardinal Health: Agreement State Report - Transportation Accident Involving Used Technetium 99M Syringes
PNO-III-05-017 12/21/2005 Byron 1 and 2: Potential Gunshot Injury to a Site Employee
PNO-I-05-030 12/20/2005 ABB Prospects, Inc.: Radioactive Waste Shipment Vehicle Accident (Possible Media Interest)
PNO-IV-05-018A 12/20/2005 Iris NDT: Update - Radiographer's Dose Exceeds Regulatory Limits
PNO-IV-05- 017B 12/20/2005 ProTechnics, Division of Core Laboratories: Followup on Lost or Missing Radioactive Material - Update
PNO-II-05-013A 12/19/2005 Update-Vogtle Electric Generating Plant, Unit 2: Shutdown to Repair Residual Heat Removal Pipe Leak
PNO-I-05-029A 12/15/2005 Froehling & Robertson, Inc.: Portable Density Gauge Recovered and Secured
PNO-I-05-029 12/12/2005 Froehling & Robertson, Inc.: Portable Density Gauge Reported Missing
PNO-II-05-013 12/12/2005 Vogtle Electric Generating Plant, Unit 2: Shutdown to Repair RHR Pipe Leak
PNO-III-05-016A 12/07/2005 Braidwood 1 and 2: Potential Off-Site Migration of Tritium Contamination (Update)
PNO-III-05-016 12/01/2005 Braidwood 1 and 2: Potential Off-Site Migration of Tritium Contamination

To top of page

November 2005

PNO-IV-05-018 11/23/2005 Iris NDT: Radiographer's Dose Exceeds Regulatory Limits
PNO-IV-05- 017A 11/21/2005 ProTechnics, Division of Core Laboratories: Followup on Lost or Missing Radioactive Material Update
PNO-IV-05-017 11/15/2005 ProTechnics, Division of Core Laboratories: Followup on Lost or Missing Radioactive Material
PNO-III-05-015 11/09/2005 DC Cook/Indiana Michigan Power Company: Special Inspection of Electrical Problems After Reactor Trip
PNO-II-05-012
11/09/2005 Southern Nuclear Operating Company, Inc.: Farley Nuclear Plant Unit 2 Loss of All Main Control Board Annunciator Power
PNO-I-05-028 11/03/2005 Connecticut Yankee Atomic Power Company (Haddam Neck): Haddam Neck Report of Spent Fuel Pool Leak
PNO-II-05-011 11/01/2005 Florida Power and Light Company: Notification of Unusual Event

To top of page

October 2005

PNO-II-05-010 10/31/2005 Southern Nuclear Company: Notification of Unusual Event
PNO-II-05-009A 10/24/2005 Florida Power and Light Company: Notification of Unusual Event
PNO-II-05-008A 10/24/2005 Florida Power and Light Company: Notification of Unusual Event
PNO-II-05-009 10/24/2005 Florida Power and Light Company: Notification of Unusual Event
PNO-II-05-008 10/24/2005 Florida Power and Light Company: Notification of Unusual Event
PNO-IV-05-016 10/13/2005 Palo Verde Nuclear Generating Station - Technical Specification Required Shutdown of Palo Verde Units 2 and 3
PNO-IV-05-015 10/05/2005 Palo Verde Nuclear Generating Station, Unit 3, Shutdown to Repair Reactor Coolant Pump Oil Seal
PNO-IV-05-014 10/04/2005 Department of the Army, Panoramic Irradiator Sealed Source Stuck in Unshielded Position

To top of page

September 2005

PNO-II-05-007 09/27/2005 Framatome Advanced Nuclear Power (F-ANP), Inc.: Overturned Trailer Transporting Radioactive Material
PNO-IV-05-013A 09/26/2005 Waterford-3, River Bend Station, South Texas Project: NRC Exits Monitoring Mode for Hurricane Rita
PNO-IV-05-013 09/23/2005 Waterford-3, River Bend Station, South Texas Project: NRC Enters Monitoring Mode Due to Hurricane Rita
PNO-I-05-027 09/16/2005 Virginia Commonwealth University: Unplanned Contamination of an Air Handler Unit
PNO-I-05-027 09/16/2005 Virginia Commonwealth University: Unplanned Contamination of an Air Handler Unit
PNO-II-05-006A 09/15/2005 Brunswick Steam Electric Plant Units 1 & 2: Notification of Unusual Event
PNO-II-05-006 09/14/2005 Brunswick Steam Electric Plant Units 1 & 3: Region II Response to Hurricane Ophelia
PNO-III-05-013 09/13/2005 Braidwood Power Plant: Forced Outage Due to Reactor Coolant Pump Leak-Off in excess of vendor recommendations
PNO-IV-05-012C 09/08/2005 Final Update - Exit of the Notice of Unusual Event at Waterford-3
PNO-II-05-005 09/02/2005 Duke Energy Corporation, Oconee Unit 3: Reactor Trip with Emergency Core Cooling System (ECCS) Initiation, Notification of Unusual Event
PNO-IV-05-012B 09/02/2005 Update - Notice of Unusual Event, Plant Shutdown, and Loss of Offsite Power at Waterford-3
PNO-I-05-026A 09/01/2005 PSEG Nuclear, LLC/Hope Creek: Shutdown Expected to Be Greater than 72 Hours to Repair an Inoperable Drywell to Suppression Chamber Vacuum Breaker
PNO-III-05-012 09/01/2005 Exelon Generation Company, Dresden: Shutdown Expected to be Greater than 72 Hours to Replace the Unit 2 Main Transformer

To top of page

August 2005

PNO-IV-05-012A 08/30/2005 Update - Notice of Unusual Event: Plant Shutdown, and Loss of Offsite Power at Waterford-3
PNO-IV-05-012 08/29/2005 Notice of Unusual Event, Plant Shutdown, and Loss of Offsite Power at Waterford-3
PNO-I-05-026 08/29/2005 PSEG Nuclear, LLC/Hope Creek: Shutdown Expected to Be Greater than 72 Hours to Repair an Inoperable Drywell to Suppression Chamber Vacuum Breaker
PNO-IV-05-011 08/24/2005 Palo Verde Nuclear Generating Station: Unit 2 Shutdown to Repair Core Protection Calculators (CPCs)
PNO-IV-05-010A 08/24/2005 Palo Verde Nuclear Generating Station, Unit 1: Update to Preliminary Notification PNO-IV-05-010, Shutdown to Repair Auto Voltage Regulator on Emergency Diesel Generator (EDG) Train B
PNO-I-05-025 08/23/2005 GEO-EXPLOR, Inc.: Missing Portable Moisture Density Gauge
PNO-I-05-024 08/19/2005 Princeton Technology Center: Loss of a Sealed Source Containing 1.5 Curies of Tritium (Hydrogen-3)
PNO-I-05-023A 08/17/2005 TJUH, Inc.: Update to Iodine-131 Contamination Event Resulting in a Skin Exposure Likely to Exceed 50 rem(0.5Sv)
PNO-IV-05-010 08/15/2005 Palo Verde Nuclear Generating Station, Unit 1: Shutdown to Repair Auto Voltage Regulator on Emergency Diesel Generator (EDG) Train B
PNO-II-05-004 08/09/2005 Brunswick Steam Electric Plant: TS Required Shutdown Due to Inoperability of all Emergency Diesel Generators
PNO-I-05-022 08/08/2005 AmerGen Energy Company - Oyster Creek Nuclear Generating Station: Alert Declaration at Oyster Creek

To top of page

July 2005

PNO-IV-05-009 07/07/2005 H&G Inspection Co., Inc.: Excessive TLD Reading
PNO-I-05-020A 07/12/2005 Entergy Nuclear Northeast/FitzPatrick Nuclear Power Plant: Supplement - Shutdown to Repair Small Crack in the Torus Portion of Primary Containment
PNO-I-05-020 07/01/2005 Entergy Nuclear Northeast: Shutdown Expected to Be Greater than 72 Hours to Repair a Small Crack in the Torus Portion of Primary Containment

To top of page

June 2005

PNO-II-05-003 06/28/2005 Florida Power & Light Co.: Fire in the Main Transformer
PNO-III-05-010 06/27/2005 Fermi Nuclear Power Plant: Fermi Forced Outage Due to Reactor Building Closed Cooling Water System Leak in the Drywell
PNO-IV-04-008 06/24/2005 Energy Northwest Columbia Generating Station: Energy Northwest Columbia Generating Station, Notice of Unusual Event Due to Detection of Flammable Gas in the General Services Building

To top of page

May 2005

PNO-II-05-002 05/24/2005 Southern Nuclear Company: Vogtle Unit 2 Shutdown to Repair Condenser Tube(s) Leak
PNO-I-05-019A 05/02/2005 Craig Testing Laboratories, Inc.: Update to Missing Portable Moisture Density Gauge

To top of page

April 2005

PNO-I-05-018A 04/27/2005 Connecticut Yankee Atomic Power Company - Haddam Neck: Supplement to Equipment Fire Inside Containment Structure at Decommissioning Reactor Site
PNO-I-05-019 04/27/2005 Craig Testing Laboratories, Inc.: Missing Portable Moisture Density Gauge
PNO-I-05-018 04/26/2005 Connecticut Yankee Atomic Power Co./Haddam Neck Plant: Equipment Fire Inside Containment Structure at Decommissioning Reactor Site
PNO-III-05-009 04/20/2005 Nuclear Management Company/Prairie Island: Technical Specification Required Shutdown of Prairie Island Unit 2 for Greater than 72 Hours
PNO-I-05-017 04/18/2005 Millstone Unit 3 Power Station: Alert Declared at Millstone 3 Due to a Main Steam Safety Valve Not Reseating after an SI Actuation on Low Main Steam Line Pressure
PNO-III-05-008 04/14/2005 University of Wisconsin: Medical Event Involving Yttrium-90 Zevalin
PNO-I-05-015A 04/08/2005 PSEG Nuclear, LLC: Supplement - Shutdown Greater than 72 Hours to Repair a Leak from a Chemical Decontamination Pipe on the ‘B’ Reactor Recirculation Loop

To top of page

March 2005
PNO-IV-05-007 03/29/2005 Union Electric Company Callaway Plant: Technical Specification Required Plant Shutdown
PNO-III-05-006 03/29/2005 St. Joseph's Regional Medical Center: Two Medical Events Involving Unintended Doses to the Skin
PNO-I-05-015 03/28/2005 PSEG Nuclear, LLC: Shutdown Expected to Be Greater than 72 Hours to Repair a Steam Leak from a Chemical Decontamination Pipe on the ‘B’ Reactor Recirculation Loop
PNO-IV-05-006 03/22/2005 Conan MMP Inspections, Inc.: Overexposure During Radiography Operations

To top of page

February 2005
PNO-III-05-004 02/25/2005 Exelon/Clinton: Clinton Shutdown for Greater than 72 Hours to Repair Damaged Feedwater Extraction Steam Line
PNO-IV-05-005 02/23/2005 Pacific Gas and Electric Company, Humboldt Bay Power Plant: Notification of Missing In-Core Detectors at Humboldt Bay
PNO-III-05-003 02/23/2005 Nuclear Management Company, LLC/Kewaunee: Shutdown in Excess of 72 Hours Due to Auxiliary Feedwater System Declared Inoperable Due to High Energy Line Break Concerns
PNO-IV-05-004 02/18/2005 SONGS: Shutdown to Repair Component Cooling Water Valve
PNO-IV-05-003 02/10/2005 South Texas Project Operating Company: Shutdown to Repair Reactor Coolant System Leak
PNO-IV-05-002 02/10/2005 Palo Verde Nuclear Generating Station Unit 1: Technical Specification Required Shutdown Due to a Partial Loss of Offsite Power

To top of page

January 2005
PNO-IV-05-001 01/28/2005 San Diego Harbor, San Diego, CA: Discovery of Cobalt-60 Source Onboard a Cruise Ship
PNO-III-05-002 01/28/2005 University of Minnesota: Medical Event Involving Under Dose to Treatment Area
PNO-III-05-001 01/25/2005 Fermi 2: Manual Scram Due to Unidentified Leakage in Drywell