Issue Date: 08/06/03
NRC INSPECTION MANUAL IIPB
All Files in ZIP Format | cn 03-028.zip |
DELETED:
Number |
Date |
TRANSMITTED:
Number |
||
---|---|---|---|---|
Date |
||||
1. | ---- | ---- | IMC 2509 | 08/06/03 |
2. | ---- | ---- | IP 35301 | 08/06/03 |
3. | ---- | ---- | IP 50090 | 08/06/03 |
4. | ---- | ---- | IP 50100 | 08/06/03 |
5. | ---- | ---- | IP 51053 | 08/06/03 |
6. | ---- | ---- | IP 51055 | 08/06/03 |
7. | ---- | ---- | IP 51061 | 08/06/03 |
8. | ---- | ---- | IP 70304 | 08/06/03 |
9. | ---- | ---- | IP 70315 | 08/06/03 |
10. | ---- | ---- | IP 70322 | 08/06/03 |
11. | ---- | ---- | TI 2500/020 | 08/06/03 |
12. | ---- | ---- | TI 2515/111 | 08/06/03 |
TRAINING: | No special training requirements have been identified for any documents issued with this change notice. |
REMARKS: | IMC 2509 (Browns Ferry Unit 1 Restart Project Inspection
Program) is issued to address closure of open items, regulatory concerns,
inspection requirements, temporary discontinuance of ROP during the BF1's
restart, adoption of the traditional-form of enforcement since the SDP
is not applicable from a risk perspective during the BF1 restart, and
the transition into the ROP on a cornerstone by cornerstone basis.
|
The above inspection procedures and temporary instructions had been previously deleted, but are now re-activated for use with the BF1 restart program. |
DISTRIBUTION: Standard