skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Combined License Applications for New Reactors
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

Comanche Peak Nuclear Power Plant, Units 3 and 4 Application

Comanche Peak
Who:   Luminant Generation Company LLC (Luminant)

What:   Application for a combined license (COL) for a United States Advanced Pressurized Water Reactor (US-APWR) designated as Comanche Peak, Units 3 and 4

When:   September 19, 2008 (target date of application submittal)

Where:   Luminant's Comanche Peak site near Glen Rose in Somervell County, Texas

On this page:

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Luminant transmittal letter for Comanche Peak Nuclear Power Plant COLA - Not available yet.

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 09/19/08 - A
Acceptance Review
Acceptance Review Start
09/22/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
11/19/08 - T
Review Schedule Established/Schedule Letter Issued to Applicant
 
Safety Review
Phase 1 –Requests for Additional Information (RAIs) Issued to Applicant
 
Phase 2 – SER with Open Items issued
 
Phase 3 – ACRS Review of SER with Open Items Complete
 
Phase 4 – Advanced SER with no Open Items Issued
 
Phase 5 – ACRS Review of SER with no Open Items Complete
 
Phase 6 – Final SER Issued
 
Environmental Review
Phase 1 – Environmental impact statement (EIS) summary report issued
 
Phase 2 – Draft EIS issued to EPA
 
Phase 3 – Response to public comments on draft EIS issued
 
Phase 4 – Final EIS issued to EPA
 
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register Notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found at NRC’s Website on Hearing Opportunities.

To top of page

NRC Documents

  • None at this time

To top of page

Public Meetings

Date Description
06/12/08 Public Outreach Meeting

To top of page

Contacts

Contacts for the Comanche Peak COL Application
Safety Project Manager Stephen Monarque
Environmental Project Manager Michael Willingham
Contact a Public Affairs Officer

To top of page



Privacy Policy | Site Disclaimer
Thursday, September 25, 2008