|
Home | Image Galleries | Natural Resource Restoration
Asarco Site Tour
See how CPRD worked with the U.S. Environmental Protection Agency (EPA), state environmental agencies, and responsible parties to help create a new habitat as part of a hazardous waste site clean-up. The following photographs were taken on August 28, 2000 during a site visit sponsored by Asarco to view the removal of slag from the intertidal zone, the protection of remaining slag from erosion, and construction of new intertidal habitats.
Click on an image below to see the full image.
|
Asarco Dock Aerial 01
(08.28.00, Tacoma, Washington) Aerial View of Asarco Dock
|
Asarco Dock Aerial 02
(08.28.00, Tacoma, Washington) Second Aerial View of Asarco Dock
|
Asarco Shoreline Remediation
(08.28.00, Tacoma, Washington) View of Shoreline at Asarco Site
|
Asarco Team
(08.28.00, Tacoma, Washington) The Asarco site manager and team
|
CRC Region 10 at Asarco Site
(08.28.00, Tacoma, Washington) Coastal Recources Coordinator for Region 10 at the Asarco site
|
Asarco Embayment Creation
(08.28.00, Tacoma, Washington) A small embayment was excavated.
|
Asarco Site Dumptrucks
(08.28.00, Tacoma, Washington) Dump trucks bringing large rocks and sand to the site.
|
Backhoe Working at Asarco Site
(08.28.00, Tacoma, Washington) Backhoe on the beach at the site.
|
Gravel Barge at Asarco Site
(08.28.00, Tacoma, Washington) A barge brings clean gravel to the site.
|
Tugboat Pushes Gravel Barge
(08.28.00, Tacoma, Washington) A tugboat pushes the gravel barge.
|
Tugboat and Gravel Barge
(08.28.00, Tacoma, Washington) A longer-range shot of the barge and tugboat working together.
|
|
Related Pages on Our Site |
|
|
|
|