5 pm Friday, November 7, through 5 am Monday, November 10, 2008
I-70 Eastbound/Westbound between Colorado Blvd. and Brighton Blvd.
8:00pm-7:30am FR Single lane closure with a second lane closing at 10:00pm for bridge deck patching. Delays possible. Alternate routes advised.
CO 58 Eastbound Between McIntyre and the Bridge
24HRS 8:00pm FR-5:00am MO All lanes of eastbound will be closed for bridge construction. Detours will be posted and alternate routes are advised.
Quebec St. Southbound over C-470
24 HRS Right lane closure for pedestrian walk construction.
Arapahoe Rd. Westbound at University Blvd.
7:00am-3:30pm SA Left lane closure for storm sewer installation.
CO 121 Northbound/Southbound Wadsworth Blvd. between 55th and 58th
7:00am-Noon SA Various single lane closures for painting, staining, and median landscaping. Delays possible.