[Code of Federal Regulations]
[Title 40, Volume 14]
[Revised as of July 1, 2004]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR70.5]

[Page 221-224]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 70_STATE OPERATING PERMIT PROGRAMS--Table of Contents
 
Sec. 70.5  Permit applications.

    (a) Duty to apply. For each part 70 source, the owner or operator 
shall submit a timely and complete permit application in accordance with 
this section.
    (1) Timely application. (i) A timely application for a source 
applying for a part 70 permit for the first time is one that is 
submitted within 12 months after the source becomes subject to the 
permit program or on or before such earlier date as the permitting 
authority may establish.
    (ii) Part 70 sources required to meet the requirements under section 
112(g) of the Act, or to have a permit under

[[Page 222]]

the preconstruction review program approved into the applicable 
implementation plan under part C or D of title I of the Act, shall file 
a complete application to obtain the part 70 permit or permit revision 
within 12 months after commencing operation or on or before such earlier 
date as the permitting authority may establish. Where an existing part 
70 permit would prohibit such construction or change in operation, the 
source must obtain a permit revision before commencing operation.
    (iii) For purposes of permit renewal, a timely application is one 
that is submitted at least 6 months prior to the date of permit 
expiration, or such other longer time as may be approved by the 
Administrator that ensures that the term of the permit will not expire 
before the permit is renewed. In no event shall this time be greater 
than 18 months.
    (iv) Applications for initial phase II acid rain permits shall be 
submitted to the permitting authority by January 1, 1996 for sulfur 
dioxide, and by January 1, 1998 for nitrogen oxides.
    (2) Complete application. The program shall provide criteria and 
procedures for determining in a timely fashion when applications are 
complete. To be deemed complete, an application must provide all 
information required pursuant to paragraph (c) of this section, except 
that applications for permit revision need supply such information only 
if it is related to the proposed change. Information required under 
paragraph (c) of this section must be sufficient to evaluate the subject 
source and its application and to determine all applicable requirements. 
The program shall require that a responsible official certify the 
submitted information consistent with paragraph (d) of this section. 
Unless the permitting authority determines that an application is not 
complete within 60 days of receipt of the application, such application 
shall be deemed to be complete, except as otherwise provided in Sec. 
70.7(a)(4) of this part. If, while processing an application that has 
been determined or deemed to be complete, the permitting authority 
determines that additional information is necessary to evaluate or take 
final action on that application, it may request such information in 
writing and set a reasonable deadline for a response. The source's 
ability to operate without a permit, as set forth in Sec. 70.7(b) of 
this part, shall be in effect from the date the application is 
determined or deemed to be complete until the final permit is issued, 
provided that the applicant submits any requested additional information 
by the deadline specified by the permitting authority.
    (3) Confidential information. In the case where a source has 
submitted information to the State under a claim of confidentiality, the 
permitting authority may also require the source to submit a copy of 
such information directly to the Administrator.
    (b) Duty to supplement or correct application. Any applicant who 
fails to submit any relevant facts or who has submitted incorrect 
information in a permit application shall, upon becoming aware of such 
failure or incorrect submittal, promptly submit such supplementary facts 
or corrected information. In addition, an applicant shall provide 
additional information as necessary to address any requirements that 
become applicable to the source after the date it filed a complete 
application but prior to release of a draft permit.
    (c) Standard application form and required information. The State 
program under this part shall provide for a standard application form or 
forms. Information as described below for each emissions unit at a part 
70 source shall be included in the application. The Administrator may 
approve as part of a State program a list of insignificant activities 
and emissions levels which need not be included in permit applications. 
However, for insignificant activities which are exempted because of size 
or production rate, a list of such insignificant activities must be 
included in the application. An application may not omit information 
needed to determine the applicability of, or to impose, any applicable 
requirement, or to evaluate the fee amount required under the schedule 
approved pursuant to Sec. 70.9 of this part. The permitting authority 
may use discretion in developing application forms that best meet 
program needs and administrative efficiency. The forms and attachments 
chosen,

[[Page 223]]

however, shall include the elements specified below:
    (1) Identifying information, including company name and address (or 
plant name and address if different from the company name), owner's name 
and agent, and telephone number and names of plant site manager/contact.
    (2) A description of the source's processes and products (by 
Standard Industrial Classification Code) including any associated with 
alternate scenario identified by the source.
    (3) The following emission-related information:
    (i) All emissions of pollutants for which the source is major, and 
all emissions of regulated air pollutants. A permit application shall 
describe all emissions of regulated air pollutants emitted from any 
emissions unit, except where such units are exempted under this 
paragraph (c) of this section. The permitting authority shall require 
additional information related to the emissions of air pollutants 
sufficient to verify which requirements are applicable to the source, 
and other information necessary to collect any permit fees owed under 
the fee schedule approved pursuant to Sec. 70.9(b) of this part.
    (ii) Identification and description of all points of emissions 
described in paragraph (c)(3)(i) of this section in sufficient detail to 
establish the basis for fees and applicability of requirements of the 
Act.
    (iii) Emissions rate in tpy and in such terms as are necessary to 
establish compliance consistent with the applicable standard reference 
test method.
    (iv) The following information to the extent it is needed to 
determine or regulate emissions: Fuels, fuel use, raw materials, 
production rates, and operating schedules.
    (v) Identification and description of air pollution control 
equipment and compliance monitoring devices or activities.
    (vi) Limitations on source operation affecting emissions or any work 
practice standards, where applicable, for all regulated pollutants at 
the part 70 source.
    (vii) Other information required by any applicable requirement 
(including information related to stack height limitations developed 
pursuant to section 123 of the Act).
    (viii) Calculations on which the information in paragraphs (c)(3 (i) 
through (vii) of this section is based.
    (4) The following air pollution control requirements:
    (i) Citation and description of all applicable requirements, and
    (ii) Description of or reference to any applicable test method for 
determining compliance with each applicable requirement.
    (5) Other specific information that may be necessary to implement 
and enforce other applicable requirements of the Act or of this part or 
to determine the applicability of such requirements.
    (6) An explanation of any proposed exemptions from otherwise 
applicable requirements.
    (7) Additional information as determined to be necessary by the 
permitting authority to define alternative operating scenarios 
identified by the source pursuant to Sec. 70.6(a)(9) of this part or to 
define permit terms and conditions implementing Sec. 70.4 (b) (12) or 
Sec. 70.6 (a) (10) of this part.
    (8) A compliance plan for all part 70 sources that contains all the 
following:
    (i) A description of the compliance status of the source with 
respect to all applicable requirements.
    (ii) A description as follows:
    (A) For applicable requirements with which the source is in 
compliance, a statement that the source will continue to comply with 
such requirements.
    (B) For applicable requirements that will become effective during 
the permit term, a statement that the source will meet such requirements 
on a timely basis.
    (C) For requirements for which the source is not in compliance at 
the time or permit issuance, a narrative description of how the source 
will achieve compliance with such requirements.
    (iii) A compliance schedule as follows:
    (A) For applicable requirements with which the source is in 
compliance, a statement that the source will continue to comply with 
such requirements.
    (B) For applicable requirements that will become effective during 
the permit

[[Page 224]]

term, a statement that the source will meet such requirements on a 
timely basis. A statement that the source will meet in a timely manner 
applicable requirements that become effective during the permit term 
shall satisfy this provision, unless a more detailed schedule is 
expressly required by the applicable requirement.
    (C) A schedule of compliance for sources that are not in compliance 
with all applicable requirements at the time of permit issuance. Such a 
schedule shall include a schedule of remedial measures, including an 
enforceable sequence of actions with milestones, leading to compliance 
with any applicable requirements for which the source will be in 
noncompliance at the time of permit issuance. This compliance schedule 
shall resemble and be at least as stringent as that contained in any 
judicial consent decree or administrative order to which the source is 
subject. Any such schedule of compliance shall be supplemental to, and 
shall not sanction noncompliance with, the applicable requirements on 
which it is based.
    (iv) A schedule for submission of certified progress reports no less 
frequently than every 6 months for sources required to have a schedule 
of compliance to remedy a violation.
    (v) The compliance plan content requirements specified in this 
paragraph shall apply and be included in the acid rain portion of a 
compliance plan for an affected source, except as specifically 
superseded by regulations promulgated under title IV of the Act with 
regard to the schedule and method(s) the source will use to achieve 
compliance with the acid rain emissions limitations.
    (9) Requirements for compliance certification, including the 
following:
    (i) A certification of compliance with all applicable requirements 
by a responsible official consistent with paragraph (d) of this section 
and section 114(a)(3) of the Act;
    (ii) A statement of methods used for determining compliance, 
including a description of monitoring, recordkeeping, and reporting 
requirements and test methods;
    (iii) A schedule for submission of compliance certifications during 
the permit term, to be submitted no less frequently than annually, or 
more frequently if specified by the underlying applicable requirement or 
by the permitting authority; and
    (iv) A statement indicating the source's compliance status with any 
applicable enhanced monitoring and compliance certification requirements 
of the Act.
    (10) The use of nationally-standardized forms for acid rain portions 
of permit applications and compliance plans, as required by regulations 
promulgated under title IV of the Act.
    (d) Any application form, report, or compliance certification 
submitted pursuant to these regulations shall contain certification by a 
responsible official of truth, accuracy, and completeness. This 
certification and any other certification required under this part shall 
state that, based on information and belief formed after reasonable 
inquiry, the statements and information in the document are true, 
accurate, and complete.