Resource Record Details
Procedure Memorandum No. 45 and Associated FAQ
Procedure Memorandum No. 45 revised the Accredited Levee and Provisionally Accredited Levee notation provided in Procedure Memorandum No. 43.
The Answers to Questions about Procedure Memorandum No. 45 document provides information on the levee notes that are to appear on Digital Flood Insurance Rate Maps and why FEMA changed the levee note.
Document Details:
Resource Type: |
Document / Report |
Audience Categories: |
Floodplain Managers
State, Local and Tribal Representatives
Insurance Industry
Mapping Professionals
FEMA Regions
Contractors and Vendors
|
Hazard Types: |
Flooding
|
Subjects: |
Flood Hazard Mapping
Mapping and Geographic Information Systems (GIS)
Floodplain Management
FEMA Organizational Procedures and Policies
|
Program: |
Map Mod - Flood Map Modernization |
Download Plug-in
Some of the links on this page require a plug-in to view them. Links to the plug-ins are available below.
Adobe Acrobat (PDF)