In Docket No. RM01-5-000, the Commission proposed a requirement that all tariffs, tariff revisions and rate change applications be filed electronically. The affected regulated entities would be:
- Public utilities and Power Marketing Administrations under Parts 35 and 300;
- Natural gas pipelines under Parts 154 and 284;
- Intrastate gas pipelines under Part 284; and
- Oil pipelines under Part 341.
Documents related to the Supplemental NOPR dated April 17, 2008 are listed below. Note that several of the schema and code files are in PDF and formatted for legibility. If the proposed Supplemental NOPR is adopted, these schema and code files will be posted in the proposed XSD and CSV electronic formats:
Supplemental NOPR Related Documents:
Supplemental NOPR Referenced Aids:
|
|
|
|
|
|